Permit: TC-COM-1224-02387
Permit Details
Apply Date:
12/23/2024
Applicant:
Alex Pillion
Description:
New 84-unit affordable housing, apartment building.
Permit Reviews
Permit Number - TC-COM-1224-02387
Permit Status: Issued
Permit Description: New 84-unit affordable housing, apartment building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/23/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/14/2025 | REQUIRES RESUBMIT |
| 01/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/12/2025 | REQUIRES RESUBMIT |
| 09/25/2025 | RESTAMP - COMMERCIAL v.1 | 09/26/2025 | APPROVED |
| 02/19/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/04/2025 | REQUIRES RESUBMIT |
| 03/07/2025 | COMMERCIAL REVIEW - FULL v.4 | 03/11/2025 | APPROVED |
| 05/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/05/2025 | APPROVED |
| 04/15/2025 | RESTAMP - COMMERCIAL v.1 | 04/21/2025 | APPROVED |
| 06/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2025 | APPROVED |
| 03/11/2025 | RESTAMP - COMMERCIAL v.1 | 03/27/2025 | APPROVED |
| 08/27/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 09/05/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1224-02387
Permit Status: Issued
Permit Description: New 84-unit affordable housing, apartment building.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/10/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/10/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 03/10/2025 | Masonry Inspection Report submittal review is required. |
| 03/10/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 03/10/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Conditions
Permit Number - TC-COM-1224-02387
Permit Status: Issued
Permit Description: New 84-unit affordable housing, apartment building.
| Date | Description | Comments |
|---|---|---|
| 12/23/2024 | Plans on Permit Application need to match address on Construction Plans prior to issuance. Please feel free to contact me if you have any questions or concerns regarding these comments. Thank you - Doris Benoit 520.633.9084 Doris.Benoit@Tucsonaz.gov | |
| 05/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/23/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 12/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/10/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1224-02387
Permite Description: New 84-unit affordable housing, apartment building.
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2025 | COT - HCBU - Building Progress | N/A | Not Ready | |
| 07/28/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | 6/27/25: not ready will call in for Tuesday morning inspection 7/1/25: plumbing underground passed at Area B ok to proceed with backfill 7/28/25: plumbing underground passed at Area A ok to proceed with backfill. |
| 08/28/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 8-28-25: 2 1/2" main/backflow located on south side of Area B verified under test & per plans-okay to backfill progress areas with shading materials. |
| 08/07/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 8/7/2025 area B okay for concrete placement. |
| 10/10/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 10-10-25: precon meeting to discuss firewall/firestop expectations. Soffits areas will be partially dry walled to allow for mechanical & plumbing equipment and will be inspected at each unit. |
| 11/17/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 11-17-25: Mechanical & DWV supports above ceiling for room's 317, 316, 315, 318, 319, 314, 320, C09, 321, 313, 322, 312, 323, 324, 311. Okay to spray foam 10" above ceiling. |
| 10/31/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 10-31-25: Section B Stairwell exterior sheathing verified at 4" at edges/joints & 12" o.c. In the field (ground level -3rd level) & CS Straps at openings. Verified Section B South Stairwell joists, LVL stringers, Simpson LUS hangers & required A35's per S3.11 detail 10 together with required holds as per shear wall schedule. Missing fireblocking at stair stringers-see 718.2.4 of the IBC for details and add nails to interior stairwell sheathing where nails over-penetrate more than 1/8" and are installed closer than 3/8" at joints. A re-inspection is required for mentioned items but okay to continue with construction at progress areas. |
| 10/31/2025 | COT - HCBU - Framing | N/A | Partial Pass | 10-31-25: verified exterior nailing for end of roof sheathing & and top of roof nailing for Section B South stairs. Okay to continue construction at progress areas. |
| 10/24/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 10/24/25: Section B drain waste and vent inspection(pressure test approved) 1,2,3 floor |
| 11/25/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 11/25/2025 Partial pass. roof nailing for first floor roof east side near elevator shaft and elevator shaft. |
| 12/04/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 12-4-25: partial pass for in wall electrical intermediates at room's 321, 313, 322 323, 312, 311,314. Okay to continue with construction at progress areas. |
| 12/04/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 12-4-25: partial pass for mechanical at room's 321, 313, 322 323, 312, 311,314. Okay to continue with construction at progress areas. Note: okay to spray insulation at upper deck areas at room's-310, 308, 327, 328, 301, 302, 307, 306 , 303, 304, 325, 309, 326, |
| 12/04/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 12-4-25: verified 4-4" schedule 40 electrical secondary conduits from transformer to SES 3 at section b. Okay to backfill progress areas. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1224-02387
Permit Description: New 84-unit affordable housing, apartment building.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2025 | COT - HCBU - Masonry Pregrout | Passed | 9-25-25: reinforcement at elevator shaft walls verified per plans-top out at 34'. |