Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
6100 S 12TH AV
Address NEW:
6100 S 12TH AV
Apply Date:
04/12/2024
Applicant:
Kappcon Inc. General Contractor
Description:
Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.

Permit Reviews

Permit Number - TC-COM-0424-00665
Permit Status: Issued
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Start Date Submittal Complete Date Status  
03/04/2025 COMMERCIAL REVIEW - FULL v.4 03/18/2025 APPROVED Review Details
11/22/2024 COMMERCIAL REVIEW - FULL v.2 12/05/2024 REQUIRES RESUBMIT Review Details
04/17/2024 COMMERCIAL REVIEW - FULL v.1 05/07/2024 REQUIRES RESUBMIT Review Details
03/18/2025 RESTAMP - COMMERCIAL v.1 03/27/2025 APPROVED Review Details
04/27/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/05/2026 APPROVED Review Details
01/28/2025 COMMERCIAL REVIEW - FULL v.3 02/10/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0424-00665
Permit Status: Issued
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Total Outstanding Activity Conditions - 16
Date Name
02/06/2025 AIR BALANCING REPORT IS REQUIRED.
02/06/2025 WATER STERILIZATION REPORT IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/06/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
05/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
05/06/2024 Masonry Inspection Report submittal review is required.
05/06/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/06/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
05/22/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/22/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
06/26/2025 STRUCTURAL AND OPERATIONAL DESIGN TO BE SUBMITTED BY GATE MANUFACTURER/SUPPLIER. THIS TO INCLUDE FENCE/GATE/FOOTING DRAWINGS AS WELL AS STRUCTURAL CALCULATIONS AND DETAIL DRAWINGS.

Conditions

Permit Number - TC-COM-0424-00665
Permit Status: Issued
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Date Description Comments
03/27/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0424-00665
Permite Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
01/22/2026 COT - LCEL - Electrical Above Ceiling N/A Partial Pass 1-22-26: Building 1-in wall electrical/above ceiling conduits & supports for room's, 101-108 approved.
Note: provide interior metal framing RFI.
11/19/2025 COT - LCEL - Electrical Underground N/A Partial Pass 2” schedule 40 @ 2’ depth for COM line. (communication) from building 1 center of building west end running north west just shy from temporary fence.
X2 1” schedule 40 coming from building one and ending at center of pool south end for fire alarm feeding pump room.
X2 2 1/2” coming from building 1 head in east shy center of pool as well feeding pump room for 200 amp service. Okay to backfill progress areas. Shading required.
02/11/2026 COT - BULD - SWG Clearance N/A Partial Pass 2-11-26: trench depth over 4' for a 4" gas sleeve. Okay to backfill approximately 240',of trench using shading materials.
03/03/2026 COT - LCEL - Grounding/Bonding N/A Partial Pass 3-3-26: verified splash pad equipotential bonding & bonding to structures. Okay for concrete placement at progress areas.
03/20/2026 COT - LCEL - Electrical Intermediate N/A Partial Pass CT can along with all equipment reviewed (disconnects) pending secondaries. Provide letter or torque at next site visit for electrical inspection.
Reviewed electrical room at building.
Provide labels at all equipment. 3/20/2026
09/05/2025 BULD - Electrical Clearance N/A Partial Pass Partial approval for emergency 3-phase CT panel and conductor repair - INCR Clearance was called into TEP at 8:30 am for reconnection
Pending project completion
10/30/2025 Pool/Spa - Bonding Grip N/A Partial Pass Partial pass for plumbing and rebar at both pools pending splashpad, ok to backfill, shockcrete pools
12/18/2025 COT - LCPL - Plumbing Intermediate N/A Partial Pass 12-18-25: underground plumbing at Building 3- pool equipment room verified under test. An RFI to the city has been submitted showing new location of vents. Okay to backfill at own risk pending city approval.
05/18/2026 COT - LCME - Mechanical Intermediate N/A Partial Pass 5/18/2026 Partial pass. Admin building above ceiling for mechanical approved.
07/08/2026 COT - LCME - Mechanical Final N/A Partial Pass Partial pass buildings 1 and 2 approved. Pending air and balance reports. 7/8/2026
07/08/2026 COT - LCPL - Plumbing Final N/A Partial Pass Partial pass. Buildings 1 and 2 approved. Pending building 3 and chlorination report. 7/8/2026
07/08/2026 COT - LCBU - Building Final N/A Partial Pass Partial pass for buildings 1 and 2 pending conditions of third party reports. 7/8/2026
07/08/2026 ENGR Engineering Final N/A Not Ready Main building and entrance area is complete with some minor issues.
Splash pad is not complete: missing three (3) fixtures, missing drain grate, exposed conduit on north side.
Pool(s) not complete: railings, plumbing, floor finish not installed.
Sidewalk at front entrance has an elevation change of greater than half an inch.
Open electric boxes on east wall by therapy pool.
Fencing not complete.
Landscaping not finished, any deviations from the plans will require an As-Built and letter from Parks & Rec outlining the changes.
Picnic table under canopy on south side wobbles, could crush small toes.
12/09/2025 COT - LCPL - Sewer N/A Canceled 12-9-25: canceled by contractor.
02/18/2026 COT - LCPL - Yard Water Line N/A Partial Pass 2-18-26: water main line test at 62psi. Verified that line was under pressure for more than 15 minutes. Total length of run is a total of 980' -okay to continue with project at progress areas. Note: pending city approval from city on RFI from 6" to 3" water line.
11/25/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 11/25/2025 Building 2. East wall at top out. Interior walls at top out. Okay to grout all progress areas.
07/23/2026 COT - LCEL - Electrical Final N/A Partial Pass 7-23-26: submit updated panel schedules to the city for Building's 1 & 2 and reschedule inspections to verify scheduling. Building 3-panel schedule approved, however, label junction boxes and install bubble covers on in wall GFCI's. Will reinspect when ready.
08/12/2026 COT - FCON - Fire - Final N/A Partial Pass Alarm monitoring permit. FACP sign Knox box

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0424-00665
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/30/2025 zzzPDSD Building Division - Site Excavation/Layout/Rebar Passed 10/30/25 Partial pass for plumbing and rebar at both pools pending splashpad, ok to backfill, shockcrete pools. Both structures ok to proceed to next lift, reinforcement verified
01/23/2026 COT - LCPL - Rough Soil Passed
02/06/2026 COT - LCEL - Electrical Underground Passed 2-6-26: previously inspected & approved.
02/06/2026 COT - LCEL - Electrical Progress Passed 2-6-26: previously inspected & approved.
04/24/2026 Pool/Spa - Bonding Grip Passed 4-24-26: previously inspected and approved.
07/08/2026 TRSP - ROW - Final/Close-Out Passed
07/08/2026 COT - LCEL - Outdoor Lighting Passed
07/08/2026 COT - LCPL - Sewer Passed
07/08/2026 COT - LCPL - Yard Water Line Passed
07/08/2026 COT - HCBU - Excavation/Rebar/Zoning Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-4_BP-MISSION MANOR_V4.PDF DOCUMENTS VIEW