Permit: TC-COM-0424-00665
Permit Details
Apply Date:
04/12/2024
Applicant:
Kappcon Inc. General Contractor
Description:
Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Permit Reviews
Permit Number - TC-COM-0424-00665
Permit Status: Issued
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/04/2025 | COMMERCIAL REVIEW - FULL v.4 | 03/18/2025 | APPROVED |
| 11/22/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/05/2024 | REQUIRES RESUBMIT |
| 04/17/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/07/2024 | REQUIRES RESUBMIT |
| 03/18/2025 | RESTAMP - COMMERCIAL v.1 | 03/27/2025 | APPROVED |
| 04/27/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/05/2026 | APPROVED |
| 01/28/2025 | COMMERCIAL REVIEW - FULL v.3 | 02/10/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0424-00665
Permit Status: Issued
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Total Outstanding Activity Conditions - 16
| Date | Name |
|---|---|
| 02/06/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 02/06/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 05/06/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 05/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 05/06/2024 | Masonry Inspection Report submittal review is required. |
| 05/06/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 05/06/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 05/22/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 05/22/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 06/26/2025 | STRUCTURAL AND OPERATIONAL DESIGN TO BE SUBMITTED BY GATE MANUFACTURER/SUPPLIER. THIS TO INCLUDE FENCE/GATE/FOOTING DRAWINGS AS WELL AS STRUCTURAL CALCULATIONS AND DETAIL DRAWINGS. |
Conditions
Permit Number - TC-COM-0424-00665
Permit Status: Issued
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
| Date | Description | Comments |
|---|---|---|
| 03/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0424-00665
Permite Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Total Outstanding Inspections - 18
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | 1-22-26: Building 1-in wall electrical/above ceiling conduits & supports for room's, 101-108 approved. Note: provide interior metal framing RFI. |
| 11/19/2025 | COT - LCEL - Electrical Underground | N/A | Partial Pass | 2” schedule 40 @ 2’ depth for COM line. (communication) from building 1 center of building west end running north west just shy from temporary fence. X2 1” schedule 40 coming from building one and ending at center of pool south end for fire alarm feeding pump room. X2 2 1/2” coming from building 1 head in east shy center of pool as well feeding pump room for 200 amp service. Okay to backfill progress areas. Shading required. |
| 02/11/2026 | COT - BULD - SWG Clearance | N/A | Partial Pass | 2-11-26: trench depth over 4' for a 4" gas sleeve. Okay to backfill approximately 240',of trench using shading materials. |
| 03/03/2026 | COT - LCEL - Grounding/Bonding | N/A | Partial Pass | 3-3-26: verified splash pad equipotential bonding & bonding to structures. Okay for concrete placement at progress areas. |
| 03/20/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | CT can along with all equipment reviewed (disconnects) pending secondaries. Provide letter or torque at next site visit for electrical inspection. Reviewed electrical room at building. Provide labels at all equipment. 3/20/2026 |
| 09/05/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial approval for emergency 3-phase CT panel and conductor repair - INCR Clearance was called into TEP at 8:30 am for reconnection Pending project completion |
| 10/30/2025 | Pool/Spa - Bonding Grip | N/A | Partial Pass | Partial pass for plumbing and rebar at both pools pending splashpad, ok to backfill, shockcrete pools |
| 12/18/2025 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 12-18-25: underground plumbing at Building 3- pool equipment room verified under test. An RFI to the city has been submitted showing new location of vents. Okay to backfill at own risk pending city approval. |
| 05/18/2026 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | 5/18/2026 Partial pass. Admin building above ceiling for mechanical approved. |
| 07/08/2026 | COT - LCME - Mechanical Final | N/A | Partial Pass | Partial pass buildings 1 and 2 approved. Pending air and balance reports. 7/8/2026 |
| 07/08/2026 | COT - LCPL - Plumbing Final | N/A | Partial Pass | Partial pass. Buildings 1 and 2 approved. Pending building 3 and chlorination report. 7/8/2026 |
| 07/08/2026 | COT - LCBU - Building Final | N/A | Partial Pass | Partial pass for buildings 1 and 2 pending conditions of third party reports. 7/8/2026 |
| 07/08/2026 | ENGR Engineering Final | N/A | Not Ready | Main building and entrance area is complete with some minor issues. Splash pad is not complete: missing three (3) fixtures, missing drain grate, exposed conduit on north side. Pool(s) not complete: railings, plumbing, floor finish not installed. Sidewalk at front entrance has an elevation change of greater than half an inch. Open electric boxes on east wall by therapy pool. Fencing not complete. Landscaping not finished, any deviations from the plans will require an As-Built and letter from Parks & Rec outlining the changes. Picnic table under canopy on south side wobbles, could crush small toes. |
| 12/09/2025 | COT - LCPL - Sewer | N/A | Canceled | 12-9-25: canceled by contractor. |
| 02/18/2026 | COT - LCPL - Yard Water Line | N/A | Partial Pass | 2-18-26: water main line test at 62psi. Verified that line was under pressure for more than 15 minutes. Total length of run is a total of 980' -okay to continue with project at progress areas. Note: pending city approval from city on RFI from 6" to 3" water line. |
| 11/25/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/25/2025 Building 2. East wall at top out. Interior walls at top out. Okay to grout all progress areas. |
| 07/23/2026 | COT - LCEL - Electrical Final | N/A | Partial Pass | 7-23-26: submit updated panel schedules to the city for Building's 1 & 2 and reschedule inspections to verify scheduling. Building 3-panel schedule approved, however, label junction boxes and install bubble covers on in wall GFCI's. Will reinspect when ready. |
| 08/12/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Alarm monitoring permit. FACP sign Knox box |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0424-00665
Permit Description: Demolition of existing pool structures within existing public park and construction of new public pool, splashpad, and aquatics building.
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2025 | zzzPDSD Building Division - Site Excavation/Layout/Rebar | Passed | 10/30/25 Partial pass for plumbing and rebar at both pools pending splashpad, ok to backfill, shockcrete pools. Both structures ok to proceed to next lift, reinforcement verified | |
| 01/23/2026 | COT - LCPL - Rough Soil | Passed | ||
| 02/06/2026 | COT - LCEL - Electrical Underground | Passed | 2-6-26: previously inspected & approved. | |
| 02/06/2026 | COT - LCEL - Electrical Progress | Passed | 2-6-26: previously inspected & approved. | |
| 04/24/2026 | Pool/Spa - Bonding Grip | Passed | 4-24-26: previously inspected and approved. | |
| 07/08/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/08/2026 | COT - LCEL - Outdoor Lighting | Passed | ||
| 07/08/2026 | COT - LCPL - Sewer | Passed | ||
| 07/08/2026 | COT - LCPL - Yard Water Line | Passed | ||
| 07/08/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed |