Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2026 | COT - LCEL - Electrical Underground | Partial Pass | 1-6-26: 5 light pole cages inspected -Verified Schedule 40 conduit with proper bonding at each. | |
| 02/06/2026 | COT - LCEL - Electrical Underground | Passed | 2-6-26: previously inspected & approved. | |
| 08/20/2025 | COT - LCEL - Electrical Underground | Partial Pass | 8-20-25: verified 4" Schedule 40 conduit for SES-Okay to backfill approximately 50' of open trench with shading materials. | |
| 09/02/2025 | COT - LCEL - Electrical Underground | Partial Pass | 9-2-25: verified primary & secondary underslab electrical schedule 40 conduits ranging from 1" -2 1/2". Okay to backfill progress areas. | |
| 11/19/2025 | COT - LCEL - Electrical Underground | Partial Pass | 2” schedule 40 @ 2’ depth for COM line. (communication) from building 1 center of building west end running north west just shy from temporary fence. X2 1” schedule 40 coming from building one and ending at center of pool south end for fire alarm feeding pump room. X2 2 1/2” coming from building 1 head in east shy center of pool as well feeding pump room for 200 amp service. Okay to backfill progress areas. Shading required. |