Inspection Status: Partial Pass
Inspection History: COT - LCPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 01/21/2026 |
COT - LCPL - Rough Soil |
|
Partial Pass |
1-21-26: verified trench depth at 4' for a 3" main pvc water line. A revision showing 6" to 3" has been submitted to the city for review. Okay to backfill approximately 300' of open trench with shading materials at own risk pending revision city approval. Water pressure test will be conducted at a later date. Note: also looked at 6" main fire water line but this must be inspected by fire Marshall. |
| 01/23/2026 |
COT - LCPL - Rough Soil |
|
Passed |
|
| 10/30/2025 |
COT - LCPL - Rough Soil |
|
Partial Pass |
Partial pass for plumbing and rebar at both pools pending splashpad, ok to backfill, shockcrete pools |