Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0424-00665

Parcel: 13801001D


Addresses:

6100 S 12TH AV

Inspection Status: Partial Pass

Inspection History: COT - LCPL - Rough Soil 

Date Description Inspector Results Comments
01/21/2026 COT - LCPL - Rough Soil  Partial Pass 1-21-26: verified trench depth at 4' for a 3" main pvc water line. A revision showing 6" to 3" has been submitted to the city for review. Okay to backfill approximately 300' of open trench with shading materials at own risk pending revision city approval. Water pressure test will be conducted at a later date. Note: also looked at 6" main fire water line but this must be inspected by fire Marshall.
01/23/2026 COT - LCPL - Rough Soil  Passed
10/30/2025 COT - LCPL - Rough Soil  Partial Pass Partial pass for plumbing and rebar at both pools pending splashpad, ok to backfill, shockcrete pools