Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address NEW:
850 E SPEEDWAY BL
Apply Date:
02/06/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
APARTMENTS
Contractors:
  • BEAL DERKENNE CONSTRUCTION LLC

Permit Reviews

Permit Number - T18CM00946
Permit Status: C of o
Permit Description: APARTMENTS
Start Date Submittal Complete Date Status  
02/06/2018 PLANS OK TO SUBMIT - COMM 02/07/2018 COMPLETED Review Details
03/29/2018 3RD PARTY REVIEW - COMMERCIAL 06/18/2018 COMPLETED Review Details
05/01/2019 3RD PARTY REVIEW - REVISION/OTHER 05/03/2019 COMPLETED Review Details
05/13/2019 3RD PARTY REVIEW - COMMERCIAL 05/13/2019 COMPLETED Review Details
06/21/2018 POST 3RD PARTY REVIEW 08/07/2018 COMPLETED Review Details
12/04/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 12/09/2019 COMPLETED Review Details
12/06/2019 3RD PARTY REVIEW - REVISION/OTHER 12/09/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM00946
Permit Status: C of o
Permit Description: APARTMENTS
Total Outstanding Activity Conditions - 1
Date Name
02/06/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T18CM00946
Permit Description: APARTMENTS
Total Completed Inspections - 44
Date Description Inspector Results Comments
10/26/2018 STEM WALL/RETAINING WALL BSTEVENS Approved elevators 1&2 and stairway shaft 2 ok to form and pour level 4.
11/28/2018 PLUMBING - PRE SLAB BSTEVENS Approved
12/03/2018 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved Footing at southeast corner south of ramp OK to pour after loose dirt is cleaned away from steal.
12/06/2018 ELECTRIC - UNDERGROUND BSTEVENS Approved Conduits from townhouse West to SES (3 2 1/2" & 1 2")
12/06/2018 PLUMBING - ROUGH, SOIL BSTEVENS Approved Waste from NE corner W to midway ok to cover
12/17/2018 ENGINEERING - FINAL BBENEDON Approved Inspection due to a complaint of track out. See inspections on dp1 70301. Antonio at 6:02 795-3440. Is reminded to control and clean and attract out and to schedule inspections under the development package permit.
12/28/2018 REINFORCED MASONRY PRE-GROUT ESTEVENS Approved Line 4- B thru F 2nd lift. Line 7 - A to B and mech. Room, 5th lift.
12/28/2018 BUILDING PRE-SLAB IVR USER Approved IVRS - RI canceled
03/28/2019 PLUMBING - GAS PRESSURE TEST AKLEINSORGE Approved
06/10/2019 TEP CLEARANCE - AM ESTEVENS Approved Units 201 through 218. CODE ECO
06/25/2019 TEP CLEARANCE - PM ESTEVENS Approved Units 401-407; 410, 414-418; 110-112. CODE ECO.
06/27/2019 ELECTRIC - UFER ESTEVENS Approved
07/16/2019 MECHANICAL - ABOVE CEILING ESTEVENS Approved
07/16/2019 MECHANICAL - INTERMEDIATE ESTEVENS Approved
07/16/2019 MECHANICAL - UNDERGROUND ESTEVENS Approved
07/16/2019 PLUMBING - ABOVE CEILING ESTEVENS Approved
07/16/2019 PLUMBING - INTERMEDIATE ESTEVENS Approved
07/16/2019 PLUMBING - SEWER HCS CONNECT ESTEVENS Approved See foundation permit T18CM 00899.
07/16/2019 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved See foundation permit T18CM 00899.
07/16/2019 PLUMBING - ROOF DRAINS ESTEVENS Approved
07/16/2019 PLUMBING - GAS PRESS TEST FNL ESTEVENS Approved SWG has already been contacted.
07/16/2019 ELECTRIC - CABLE DROP ESTEVENS Approved
07/16/2019 ELECTRIC - ABOVE CEILING ESTEVENS Approved
07/16/2019 FIREWALL/FIREBARRIER/FIRESTOP ESTEVENS Approved See framing inspection.
07/16/2019 U VALUE FOR WINDOW ESTEVENS Approved
07/16/2019 STUCCO MESH ESTEVENS Approved
07/16/2019 BUILDING ABOVE CEILING ESTEVENS Approved
07/16/2019 FRAMING ESTEVENS Approved
07/16/2019 ROOF NAILING ESTEVENS Approved
07/31/2019 EXT METAL CLIPS/EXT SHEATHING ESTEVENS Approved
08/15/2019 ELECTRIC - FINAL ESTEVENS Approved
08/15/2019 FIRE SPKLR - FINAL Mross Approved
08/16/2019 OUTDOOR LIGHTING FINAL ESTEVENS Approved
08/16/2019 ELECTRIC - INTERMEDIATE ESTEVENS Approved
08/16/2019 ELECTRIC - OUTDOOR LIGHTING ESTEVENS Approved
09/06/2019 PLUMBING - FINAL RSHERRY Approved REVIEW OF WATER DISINFECTION REPORT COMPLETED
09/11/2019 FIRE - FINAL MRoss Approved
09/11/2019 FIRE - ALARM FINAL MRoss Approved
10/17/2019 MECHANICAL - FINAL JBURGE Approved
10/17/2019 SHEET ROCK NAILING JBURGE Approved
12/03/2019 STORMWATER FINAL INSPECTION DROBERTS Approved
12/03/2019 STORMWATER FOLLOW-UP INSP DROBERTS Approved
12/03/2019 GRADING - FINAL DROBERTS Approved
12/13/2019 BUILDING - FINAL ESTEVENS Approved