Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T18CM00946

Parcel: 11504498B


Addresses:

850 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
07/16/2019 REINFORCED MASONRY PRE-GROUT Approved See foundation permit T18CM 00899
07/10/2019 REINFORCED MASONRY PRE-GROUT Partial Approval I will need to meet with the contractor to ensure all work is complete.
02/27/2019 REINFORCED MASONRY PRE-GROUT Partial Approval 4 foot wide 8 feet in height wall on northeast corner with clean outs.
02/13/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Exterior sheathing and straps on southside balconies
01/18/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Row A 4th lift, section 4F top out, basement level section 2E 3rd lift top out. Line 7 B thru H top out.
01/17/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Row B 4th lift, Row A 3rd lift, section 4F @ 11ft, basement level section 2E 2nd lift.
01/16/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Row B 3rd lift, Row A 2nd lift, section 4F 6’8” w/clean outs, Line 7 E thru J.
01/14/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Row B 2nd lift, Row A 1st lift, Row J line 1.5-4.1 1st lift.
01/11/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Row B first lift, Line 4 row A, Line7 B thru E, Line 7 row G to H. 5th lift.
01/10/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Line 4 row A, line 4 row E, line 7 row E through J. All are fourth lift
01/09/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Line 4 row A, line 4 row 3, Line 7 E through J, all our third lift
01/08/2019 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Customer wanted a p.m. inspection but did not leave a message or a phone number to pass on that request
I will notify supervisor to try to accommodate
project manager asked if I could come back requesting a 1 to 2 PM inspection however I will be unable to be here at that time I’ll be on another inspection far west
01/08/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls on level #1, at GL; A/4; H/7. OK to place grout
01/07/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Masonry on Gridline 7 from D through H OK to grout to 4 feet above finish floor.
Masonry on Gridline four from A to B in and from 5 to 4 OK to 4 feet above finish floor
01/03/2019 REINFORCED MASONRY PRE-GROUT Partial Approval wall line for, OK to grout at 14 1/2 feet
01/02/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Wall line 4 OK to grout to 12 ft elevation
12/28/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Line 4- B thru F 2nd lift. Line 7 - A to B and mech. Room, 5th lift.
12/18/2018 REINFORCED MASONRY PRE-GROUT Partial Approval A7 to E7 only
12/17/2018 REINFORCED MASONRY PRE-GROUT Partial Approval A7 to E7 And mechanical room, third lift
12/13/2018 REINFORCED MASONRY PRE-GROUT Partial Approval A7 to E7. and mechanical room, second left
12/11/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Masonry walls at townhome area ok to grout to 16’
12/07/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Masonry walls at south east corner OK to 12 feet. Northside OK to top of wall or finish floor.
12/05/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Eastside masonry walls in townhouse area OK to grout to 8 feet.
12/04/2018 REINFORCED MASONRY PRE-GROUT Partial Approval East side townhome area masonry walls OK to 4 feet.