Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T18CM00946
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2019 | BUILDING - FINAL | Approved | ||
| 12/12/2019 | BUILDING - FINAL | Partial Approval | REVIEW OF AIR BALANCE REPORT COMPLETED | |
| 11/14/2019 | BUILDING - FINAL | Partial Approval | Spoke to project manager, Stephen Van Peek, he stated that all requested information was submitted to Lisa B. STILL NEED TO CALL IN ENGINEERING INSPECTIONS |
|
| 10/29/2019 | BUILDING - FINAL | Partial Approval | Submit all changes, RFI's, as built plans and special inspection certifications. | |
| 10/17/2019 | BUILDING - FINAL | Partial Approval | PENDING REVISIONS | |
| 10/10/2019 | BUILDING - FINAL | Partial Approval | Upper garage; paint exposed PVC pipes, seal all openings to building on the north side garage wall, missing electrical cover. Lower garage; missing electrical box cover seal in Cocoa wall openings. Second floor; seal around all video cameras, missing electrical box cover. Fourth floor; missing dryer vent. Stairwell two, level five missing light, stairwell one paint exterior PVC pipes. Label all disconnects and condensers on roof. | |
| 08/15/2019 | BUILDING - FINAL | Partial Approval | Pending other inspections and special inspections | |
| 08/07/2019 | BUILDING - FINAL | Partial Approval | On site with Armando, open issues still not addressed. Still have openings in corridor walls and ceilings. There’s no separation between construction and public. | |
| 08/05/2019 | BUILDING - FINAL | Not ready for Inspection | Will recall for 7 August. | |
| 08/02/2019 | BUILDING - FINAL | Partial Approval | Owner to make application for TCO for Occupancy of staff for 5 August for approximately 3 personnel. VIP occupants would like to occupy on 12 August with full occupancy 15 August. | |
| 07/31/2019 | BUILDING - FINAL | Partial Approval | Levels 2, 3 and 4 are complete. Lobby, office area and town houses are complete. Missing drain covers under pool, no electric at pool deck, no electric at fitness center and yoga room. Parking garage not ready. |
|
| 07/29/2019 | BUILDING - FINAL | Partial Approval | Plumbing fixtures not installed, RTU units on roof missing thermostat wires, missing electrical switches and outlets, GFI’s not installed properly. Stopped inspection | |
| 07/25/2019 | BUILDING - FINAL | Not ready for Inspection | Cancel by contractor | |
| 07/24/2019 | BUILDING - FINAL | Partial Approval | ADA unit 316 | |
| 07/23/2019 | BUILDING - FINAL | Not ready for Inspection | Canceled by contractor | |
| 07/22/2019 | BUILDING - FINAL | Partial Approval | Level 4 all HVAC unit have been installed. | |
| 07/19/2019 | BUILDING - FINAL | Partial Approval | Units 401 thru 415, 417, 418. All units need to have air handler secured t wall. Unit 416 not ready. |
|
| 07/18/2019 | BUILDING - FINAL | Partial Approval | OK for TCO - Furniture stocking only | |
| 07/16/2019 | BUILDING - FINAL | Not ready for Inspection | not complete. | |
| 07/15/2019 | BUILDING - FINAL | Partial Approval | Student rooms on Levels #2 and #3: except for rooms 217 and 218. Rooms inspected for application of a Temporary Certificate of Occupancy for the placement of furniture and furniture related equipment. Not for occupancy. Application may be made when all rooms on Levels #2 and #3 are completed and noted corrections have even effected. | |
| 07/12/2019 | BUILDING - FINAL | Partial Approval | Level III, units number 301, 302, 303, 304, 305, 306, 307, 309, 310, 315, 317, 318, 314 and 313. Unit number 308. Exhaust fan not working, GFI at kitchen counter is not working. Unit 312, smoke detectors not properly working , disconnect for HVAC does not fully open. Unit number 316 is not ready Unit number 311 and 314, the bathroom GFI‘s are connected to the light and exhaust fan. The kitchen GFI‘s are not properly wired. | |
| 07/11/2019 | BUILDING - FINAL | Not ready for Inspection | Not complete | |
| 07/10/2019 | BUILDING - FINAL | Not ready for Inspection | not complete. | |
| 07/05/2019 | BUILDING - FINAL | Denied | Secured air handler according to manufacturers installation instructions, electrical schedule should match electrical panel, caulk around toilet, remove dryers to inspect dryer vent label and water hammer arrester’s, permanently affixed room number two unit, label disconnects on roof. Stopped inspection. | |
| 02/14/2019 | BUILDING - FINAL | Not ready for Inspection | Not complete enough |