Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FINAL INSPECTION
Permit Number - T18CM00946
Inspection Description - STORMWATER FINAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2019 | STORMWATER FINAL INSPECTION | Approved | ||
| 11/14/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | COMPLETE ALL SITE WORK PRIOR TO CALLING THIS FINAL INSPECTION. ALSO FOR THIS FINAL PROVIDE THE CITY WITH THE NOTICE OF TERMINATION FROM ADEQ, APPROVED REVISED DRAWING FOR THE SITE, ENSURE ALL STORMWATER CONTROLS HAVE BEEN REMOVED. | |
| 10/29/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | PROVIDE US WITH THE CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING ANOTHER INSPECTION. THIS DOCUMENTATION IS AS FOLLOWS: CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL COMPLETED WORK, NOTICE OF TERMINATION FROM ADEQ FOR THIS SITE, APPROVED REVISED DRAWINGS FOR ANY AND ALL CHANGES THAT WERE NOT ON THE ORIGINAL PLAN. | |
| 10/17/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | COMPLETE ALL WORK AS PREVIOUSLY NOTED ON PAST INSPECTIONS AND PROVIDE ALL CLOSEOUT DOCUMENTATION | |
| 10/10/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | Complete the work for the development package permit. I Walked the site with Antonio. Accessible parking space and loading zone and lower level exceeds the maximum allowable slope | |
| 08/15/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | PROVIDE ALL REQUIRED DOCUMENTS FOR THE DEVELOPMENT PACKAGE, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, APPROVED REVISED DRAWINGS, NOTICE OF TERMINATION FROM ADEQ. | |
| 08/07/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | COMPLETE ALL WORK ON SITE AND PROVIDE THE CITY OF TUCSON WITH ALL CLOSEOUT DOCUMENTATION FOR THIS PERMIT -THIS SITE STILL HAS UNRESOLVED ISSUES CONCERNING THE ADA PARKING AND ACCESS AISLES IN THE PARKING STRUCTURE THAT WILL NEED TO BE RESOLVED PRIOR TO THE FINAL APPROVAL. |
|
| 07/25/2019 | STORMWATER FINAL INSPECTION | Not ready for Inspection | COMPLETE ALL WORK,REMOVE ALL THE STORMWATER CONTROLS, SUBMIT YOUR NOTICE OF TERMINATION TO ADEQUATE, PROVIDE US WITH THE NOTICE OF TERMINATION FROM ADEQUATE, AND SCHEDULE THIS FINAL INSPECTION. |