Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T18CM00946
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | See foundation permit T18CM 00899 | |
| 07/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | I will need to meet with the contractor to ensure all work is complete. | |
| 12/03/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Footing at southeast corner south of ramp OK to pour after loose dirt is cleaned away from steal. | |
| 11/20/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Wall north side of parking ramp (GL6) adjust spacing of vertical rebar’s then OK to pour. | |
| 11/15/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #1 stem wall footings at GL: F.3/1.5 - 3.2; F.3 - J/1.5; 1.5 - 3/J. OK to place concrete. | |
| 11/07/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Both elevator shaft and stairway OK to poor level five. |