Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address:
110 S CHURCH AV
Address NEW:
110 S CHURCH AV
Apply Date:
11/02/2017
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
Multifamily Apartment
Architects:
  • EGLIN, EVAN SAR
Contractors:
  • H S L CONSTRUCTION SERVICES L L C

Permit Reviews

Permit Number - T17CM08216
Permit Status: C of o
Permit Description: Multifamily Apartment
Start Date Submittal Complete Date Status  
01/11/2019 3RD PARTY REVIEW - REVISION/OTHER 03/21/2019 COMPLETED Review Details
02/13/2020 3RD PARTY REVIEW - REVISION/OTHER 05/08/2020 COMPLETED Review Details
02/19/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 02/19/2019 COMPLETED Review Details
03/18/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 03/21/2019 COMPLETED Review Details
04/14/2021 3RD PARTY REVIEW - REVISION/OTHER 05/14/2021 COMPLETED Review Details
06/25/2020 3RD PARTY REVIEW - COMMERCIAL 06/25/2020 COMPLETED Review Details
07/11/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 08/07/2019 COMPLETED Review Details
07/11/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 08/07/2019 COMPLETED Review Details
08/02/2019 3RD PARTY REVIEW - REVISION/OTHER 08/08/2019 COMPLETED Review Details
08/25/2020 3RD PARTY REVIEW - REVISION/OTHER 10/20/2020 COMPLETED Review Details
09/19/2019 3RD PARTY REVIEW - REVISION/OTHER 09/20/2019 COMPLETED Review Details
09/25/2019 3RD PARTY REVIEW - REVISION/OTHER 11/04/2019 COMPLETED Review Details
10/17/2018 POST 3RD PARTY REVIEW 10/24/2018 COMPLETED Review Details
10/23/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 11/04/2019 COMPLETED Review Details
11/02/2017 PLANS OK TO SUBMIT - COMM 11/27/2017 COMPLETED Review Details
11/07/2018 POST 3RD PARTY REVIEW 11/27/2018 COMPLETED Review Details
11/25/2019 3RD PARTY REVIEW - REVISION/OTHER 12/09/2019 COMPLETED Review Details
11/27/2017 3RD PARTY REVIEW - COMMERCIAL 10/17/2018 COMPLETED Review Details
11/27/2018 POST 3RD PARTY REVIEW 12/20/2018 COMPLETED Review Details
12/09/2019 3RD PARTY REVIEW - REVISION/OTHER 12/30/2019 COMPLETED Review Details
12/11/2021 3RD PARTY REVIEW - REVISION/OTHER 12/11/2021 ACTIVE Review Details
12/31/2018 3RD PARTY REVIEW - REVISION/OTHER 01/11/2019 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T17CM08216
Permit Description: Multifamily Apartment
Total Completed Inspections - 50
Date Description Inspector Results Comments
02/28/2019 PLUMBING - SEWER HCS CONNECT RCAMACHO Approved
09/18/2019 PLUMBING - PRE SLAB JBURGE Approved Level #2; Section #B
10/24/2019 ELECTRIC - UNDERGROUND JCLAXTON Approved 3" conduit from panel PW1W to Elevator 3. 3awg grounding bonding from SES 3 to 4. Ok to proceed
11/12/2019 PLUMBING - ROUGH, SOIL JBURGE Approved 4" sewer line at East side of site at mid point to Northeast corner of site. Ok to cover progress areas.
12/16/2019 ROOF NAILING JBURGE Approved Section DL-3. Ok to frame on approved deck.
12/31/2019 BUILDING PRE-SLAB JBURGE Approved Level #2; Section F, Post Tension Cable System. Ok to,place concrete in progress.
12/31/2019 STEM WALL/RETAINING WALL JBURGE Approved Contractor cancelled.
04/16/2020 MECHANICAL - FINAL TTREMBULAK Approved RVI
04/16/2020 PLUMBING - FINAL TTREMBULAK Approved RVI
04/16/2020 OUTDOOR LIGHTING FINAL TTREMBULAK Approved RVI
04/16/2020 ELECTRIC - FINAL TTREMBULAK Approved RVI
09/18/2020 STUCCO MESH ESTEVENS Approved Not ready, not complete.
10/07/2020 MECHANICAL - ABOVE CEILING JBURGE Approved Partial. Room Units 230; 232; 323; 324; 325; 326.
10/13/2020 ELECTRIC - ABOVE CEILING ESTEVENS Approved Not ready, not complete.
10/13/2020 BUILDING ABOVE CEILING ESTEVENS Approved Not ready, not complete.
12/07/2020 ELECTRIC - CABLE DROP JBURGE Approved Not ready. Contractor cancelled, will reschedule for 8 December.
12/08/2020 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved Partial. Stairwell #5; stair footing, dowels epoxy anchored. Ok to place concrete in progress area.
12/18/2020 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved Partial. Exterior sheathing at Section H, South walls on Levels 2-7. Ok to waterproof and cover.
12/23/2020 PLUMBING - GAS PRESSURE TEST JBURGE Approved Not ready. Contractor cancelled.
12/23/2020 FRAMING JBURGE Approved Partial. Level #4; Room Units 441; 442; 443; 446; 448. Ok to insulate and cover walls.
12/23/2020 PLUMBING - INTERMEDIATE JBURGE Approved . Partial. Level #4; Room Units 441; 442; 443; 446; 448
12/23/2020 MECHANICAL - INTERMEDIATE JBURGE Approved . Partial. Level #4; Room Units 441; 442; 443; 446; 448
12/31/2020 BUILDING - PROGRESS JBURGE Approved Partial. Information only. Perimeter parapet wall construction requirements as per plan . Changes to be addressed by Building Official.
07/19/2021 GAS CLEARANCE JBURGE Approved CODE/BOTH METERS
07/21/2021 REINFORCED MASONRY PRE-GROUT JUBRGE Approved Approved
07/21/2021 U VALUE FOR WINDOW JUBRGE Approved Approved
07/21/2021 FIREWALL/FIREBARRIER/FIRESTOP JUBRGE Approved Approved
07/21/2021 ELECTRIC - UFER JUBRGE Approved Approved
07/21/2021 ELECTRIC - TEMPORARY POLE JUBRGE Approved Approved
07/21/2021 ELECTRIC - TEMPORARY SERVICE JUBRGE Approved Approved
07/21/2021 ELECTRIC - CONSTRUCTION POWER JUBRGE Approved Approved
07/21/2021 ELECTRIC - SERVICE UPGRADE JUBRGE Approved Approved
07/21/2021 ELECTRIC - OUTDOOR LIGHTING JUBRGE Approved Approved
07/21/2021 PLUMBING - ROOF DRAINS JUBRGE Approved Approved
07/21/2021 PLUMBING - MD GAS/PRECONST MTG JUBRGE Approved Approved
07/21/2021 PLUMBING - GAS PRESS TEST FNL JUBRGE Approved Approved
09/17/2021 TEP CLEARANCE - PM JBURGE Approved CODE ECO Meters and room panels to be energized: Section H, Level #1: 122, 124,126, 128, 130, 132. Section G, Level #2: 232, 240, 248. Section G, Level #3: 341, 342, 343, 344, 346, 348. Section G, Level #4: 441, 442, 443, 444, 446, 448. Section G, Level #5: 541, 542, 543, 544, 546, 548. Section D, Level #6: 602, 645. Section G, Level #6: 632, 639, 642, 648. Section I, Level #6: 631, 633, 634, 635, 636, 637, 638, 640.
11/04/2021 TEP CLEARANCE - AM JBURGE Approved CODE ECO/SECTION H, LEVEL 1, UNITS 122, 124, 126, 128, 130, 132.
12/17/2021 FIRE SPKLR - FINAL wmotto1 Approved
12/21/2021 ENGINEERING - FINAL DROBERTS Approved
12/21/2021 ZONING - FINAL DROBERTS Approved
12/23/2021 FIRE - FINAL wmotto Approved 1. Per inspector ross there was a list of deficiencies that needed to be corrected before a final could be given. The list of deficiencies have been corrrected and approved.
12/23/2021 FIRE - ALARM FINAL wmotto Approved 1, per inspector ross everything had passed except the two way communication a the elevator. this was tested and passed.
12/23/2021 SITE - SEWER JBURGE Approved Approved
12/29/2021 BUILDING - FINAL jburge Approved
12/29/2021 SHEET ROCK NAILING JBURGE Approved
12/29/2021 ELECTRIC - INTERMEDIATE JBURGE Approved
12/29/2021 PLUMBING - ABOVE CEILING JBURGE Approved
12/29/2021 PLUMBING - YARD WTR LINE/TEST JBURGE Approved
12/29/2021 ZONING PROGRESS RSALDAT1 Approved INSPECTION FOUND ALL ITMES ASSOCIATED WITH SITE PLAN, LANDSCAPE, HARDSCAPE AND PEDESTRIAN AMENATIES.