Inspection History Details
Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
Permit Number - T17CM08216
Inspection Description - STEM WALL/RETAINING WALL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2021 | STEM WALL/RETAINING WALL | Approved | Approved | |
| 11/04/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial. Walk way at main entry at elevator area. Epoxy rebar placement and footings as per plans. Ok to place concrete in progress areas. | |
| 05/18/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial. Stem walls at GL: 9/L. Ok to place concrete in progress areas. | |
| 04/30/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial. Building A & B Southwest corner exterior steps at GL: aE/4.6-5.2 Retaining walls. Ok to place concrete in progress areas. |
|
| 04/15/2020 | STEM WALL/RETAINING WALL | Not ready for Inspection | RVI Contractor cancelled. | |
| 04/14/2020 | STEM WALL/RETAINING WALL | Partial Approval | RVI Retaining wall at GL: L/5.3 at 12’5” to 17’3”. Ok to set framing and place concrete. | |
| 03/24/2020 | STEM WALL/RETAINING WALL | Partial Approval | ||
| 03/20/2020 | STEM WALL/RETAINING WALL | Partial Approval | Retaining wall footing at GL: 9/J-L; L/8-9. Ok to place concrete in progress area.. | |
| 02/21/2020 | STEM WALL/RETAINING WALL | Partial Approval | Section H level 1 south wall. Stair 3-H level 1 | |
| 02/20/2020 | STEM WALL/RETAINING WALL | Partial Approval | SECTION C; Level #2; W3 wall at GL: A.2 - B/11. Ok to place concrete in progress area. | |
| 02/19/2020 | STEM WALL/RETAINING WALL | Partial Approval | Section H, Level #2; W3 wall at GL: 9. Ok to place concrete in progress area. | |
| 02/07/2020 | STEM WALL/RETAINING WALL | Partial Approval | Retaining wall continuation; approximately 15’ at,GL: E.2/9. Stairwell #3 at Level #1-C2; GL: 8-9/E.-D.7. Ok to place concrete in progress areas. | |
| 02/05/2020 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled. | |
| 01/27/2020 | STEM WALL/RETAINING WALL | Partial Approval | Retaining wall at GL: E.2/9.2-11; 11/A.1-E.2. Ok to place concrete in progress areas. | |
| 01/22/2020 | STEM WALL/RETAINING WALL | Partial Approval | Retaining wall footing at GL: A-E.2/11; E.2/9; A.2/10.7. Ok to place concrete in progress area. | |
| 12/31/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled. | |
| 12/19/2019 | STEM WALL/RETAINING WALL | Partial Approval | Level #2; Elevator #3; Stairwell #4: shear walls. Ok to place concrete. | |
| 12/18/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled due to heavy winds, unable to use crane. | |
| 12/16/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Will reschedule 17 December, Contractor cancelled. | |
| 12/12/2019 | STEM WALL/RETAINING WALL | Partial Approval | Level #2; Section E, 14 concrete columns. Ok to set forms and place concrete | |
| 12/05/2019 | STEM WALL/RETAINING WALL | Partial Approval | Section #8; stem walls at GL: A.2/9-10.8; 10.8/A.-E; E/9.2-10.8; walls at 6’2". Ok to place concrete in progress areas. | |
| 12/04/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled; reschedule for 5 December. | |
| 12/03/2019 | STEM WALL/RETAINING WALL | Partial Approval | Shear wall (W-3) at GL: 6.6/F-H. Ok to place concrete. | |
| 12/02/2019 | STEM WALL/RETAINING WALL | Partial Approval | Concrete columns (5) at Level #1; Section F at GL: E/4.3; E.4/4.5; E/5; E/6; H/6. Ok to place concrete in progress areas. | |
| 11/26/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
| 11/19/2019 | STEM WALL/RETAINING WALL | Partial Approval | Stairwell 3 and Elevator #4 walls. At Level P2. | |
| 11/12/2019 | STEM WALL/RETAINING WALL | Partial Approval | Stem wall at GL: A.2-B/10.8; A/7-9. Ok to place concrete in progress areas. | |
| 11/06/2019 | STEM WALL/RETAINING WALL | Partial Approval | Stem wall at GL: 6.6/F-H. Ok to place concrete. | |
| 11/04/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled. | |
| 10/24/2019 | STEM WALL/RETAINING WALL | Partial Approval | Lvl P-1 grid 6.5-5, F-D Lvl P-1 grid 7-9, A-D Ok to proceed |
|
| 10/22/2019 | STEM WALL/RETAINING WALL | Partial Approval | Partial. Stem wall at GL. 6.6/D-F at 18”-28”. Ok to form and place concrete | |
| 10/21/2019 | STEM WALL/RETAINING WALL | Partial Approval | Stem wall at GL:6 approximately 40 feet. Ok to place concrete in progress area. | |
| 08/29/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled. | |
| 08/28/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | contractor cancelled. | |
| 08/26/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | contractor cancelled | |
| 08/22/2019 | STEM WALL/RETAINING WALL | Partial Approval | Section C-L2; Stairwell #1; exterior walls. Ok to place concrete in progress areas | |
| 08/21/2019 | STEM WALL/RETAINING WALL | Partial Approval | Area B, W-5 stem wall at D.9/1.2-1.6. Ok to place concrete. | |
| 08/20/2019 | STEM WALL/RETAINING WALL | Partial Approval | Section D stem walls at GL: a23; aD; aE, a24. Ok to place concrete in progress areas. | |
| 08/19/2019 | STEM WALL/RETAINING WALL | Partial Approval | Exterior wall at GL: A/5.5. Ok to place concrete in progress areas. | |
| 08/16/2019 | STEM WALL/RETAINING WALL | Partial Approval | Stem walls at GL: aB-aD/a23; aD/a23-a24. Ok to place concrete in progress areas. | |
| 08/15/2019 | STEM WALL/RETAINING WALL | Partial Approval | Section “B”; big wall at A21-A23/aA; small wall at A2-Ae. Ok to place concrete in progress areas. | |
| 08/14/2019 | STEM WALL/RETAINING WALL | Partial Approval | F11/W2 footing at GL: A/4.1/5.5. Ok to place concrete . | |
| 08/09/2019 | STEM WALL/RETAINING WALL | Partial Approval | this was an on-site meeting to discuss the changes and revisions that are not aligning with the permitted and approved set of drawings. We are now awaiting on either the engineers approval on some conflicting issues in order to pour level 1 deck or work needs to be fixed to reflect the approved drawings. | |
| 08/08/2019 | STEM WALL/RETAINING WALL | Partial Approval | retaining wall section D level one E. side OK to pour. | |
| 08/07/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | too many different sets of drawings and too many revisions that are not up-to-date and stamped. Different drawings are saying different things. Issues with steps in the slab and the amount of bars and locations, issues with quantity of hairpins, issues with quantity of cables. Need the most up to date and current drawings on site and stamped and approved at time of inspection. | |
| 08/05/2019 | STEM WALL/RETAINING WALL | Partial Approval | 1- Steel reinforcement is okay for the Stairwell 1 and Elevators 1 & 2 level P2 to level 1 only. | |
| 07/22/2019 | STEM WALL/RETAINING WALL | Partial Approval | Gridline D9 retaining portion of Level 1 ok (take photos of North west corner after bars are epoxied). Section Z4 of wall on level one ok (straighten up vertical rebar at column so spacing is 4 inches at bottom and at top, take photo of fix). | |
| 07/18/2019 | STEM WALL/RETAINING WALL | Partial Approval | OK to pour walls on level one sections C and D. Need detail stamped from the engineer showing that keyway is not needed and that number fours tying walls into columns are OK. | |
| 07/15/2019 | STEM WALL/RETAINING WALL | Partial Approval | 1- Steel reinforcement okay in wall C level P2. | |
| 07/10/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Contractor cancelled. | |
| 07/02/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | canceled | |
| 07/01/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Did not pass special inspections | |
| 06/26/2019 | STEM WALL/RETAINING WALL | Partial Approval | Post tension Pour C - L2 only | |
| 06/25/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 wall GL 9 from B-C.9 | |
| 06/24/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | AREA H INCOMPLETE | |
| 06/19/2019 | STEM WALL/RETAINING WALL | Partial Approval | Section I line 9 columns F through H | |
| 06/12/2019 | STEM WALL/RETAINING WALL | Partial Approval | 1- Steel reinforcement provided in columns located between grid line G to 9, H to 9 and J to 9. 2- Steel reinforcement mat for slab between grid lines 2,5 to 5 and H to 5. Is okay for concrete. |
|
| 06/10/2019 | STEM WALL/RETAINING WALL | Partial Approval | Level P1 Areas C & D GL 1-2.5 from E.35-L.4 |
|
| 06/06/2019 | STEM WALL/RETAINING WALL | Partial Approval | Level P1 Area D only floor drain to sump pump only | |
| 06/03/2019 | STEM WALL/RETAINING WALL | Partial Approval | W1 wall GL 6.6 from G-F only W2 wall stairwell 1 level 1 only |
|
| 05/31/2019 | STEM WALL/RETAINING WALL | Partial Approval | 1- Steel reinforcement provided in columns located between grid lines 6.6 to grid line F and between grid line D to 5- 4.5 and between C to grid line 4.5 all 9.2 inches AFF only. | |
| 05/30/2019 | STEM WALL/RETAINING WALL | Partial Approval | 1- Steel reinforcement provided in stem wall between column Z4 to 4.1 and between YC to X11 only. | |
| 05/24/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 wall GL AE from A9-A11 | |
| 05/23/2019 | STEM WALL/RETAINING WALL | Partial Approval | CC2 columns GL AE/A9 & AE/A11 | |
| 05/22/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | no work | |
| 05/21/2019 | STEM WALL/RETAINING WALL | Partial Approval | W9 wall GL F1 from 1.8-2 W1 wall GL H.3 from 5.5-6.6 W1 wall GL H.3 from G-J |
|
| 05/20/2019 | STEM WALL/RETAINING WALL | Partial Approval | Wall footing on Gridline F 1.8 to 2 ok. Retaining wall 1st parking level gridline Z2 from X5 to G8 ok. | |
| 05/17/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | canceled | |
| 05/16/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 wall level P1 GL Z2 from X2- X5 only | |
| 05/15/2019 | STEM WALL/RETAINING WALL | Partial Approval | Per detail 231 GL 5.5 from J-M | |
| 05/14/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 walls GL X11 from Z2-Z4 W3 walls GL Z2 from X5-X11 Except #4 dowels epoxy column X8 special inspection Except weld plates 6” wall see highlighted S1.1 plan |
|
| 05/13/2019 | STEM WALL/RETAINING WALL | Partial Approval | elevator one and two pit walls only | |
| 05/10/2019 | STEM WALL/RETAINING WALL | Not ready for Inspection | Not ready. Not complete | |
| 05/09/2019 | STEM WALL/RETAINING WALL | Partial Approval | Steel reinforcement provided for the wall located at 5.2 H3 to L only 2- Steel reinforcement provided in column H- 1.6 only. | |
| 05/08/2019 | STEM WALL/RETAINING WALL | Partial Approval | RFI change number 218. Line H columns on Row 2,3,&4. | |
| 04/30/2019 | STEM WALL/RETAINING WALL | Partial Approval | 20 each CC2 columns level p1 areas C&D See highlighted s1.1 plan |
|
| 04/29/2019 | STEM WALL/RETAINING WALL | Partial Approval | CC2 Columns level P 1 GL 10.1/ A.3, B. B.8, C.9 & D.9 GL 10/ A.3, B, C, D & D.9 |
|
| 04/26/2019 | STEM WALL/RETAINING WALL | Partial Approval | Trash room L1 to L2, W-2 wall type. | |
| 04/23/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 wall GL ah from a21-a23 Column a14/aj |
|
| 04/19/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 walls GL am from a7- a1 GL a1 from an-we GL we from a1-a2 |
|
| 04/18/2019 | STEM WALL/RETAINING WALL | Partial Approval | CC2 columns AJ/A1, AH/A1, A14/ AE, & A16/ AG | |
| 04/17/2019 | STEM WALL/RETAINING WALL | Partial Approval | W3 wall GL AA from A17- A21 W3 wall GL Aa from A7.5-A10 & GL A6 from AA-AE |
|
| 04/11/2019 | STEM WALL/RETAINING WALL | Partial Approval | Gridline AA section A17 to A7 (W3 wall type) ok except epoxied bar into columns on either end and except 16’ of stem wall at A8 | |
| 04/09/2019 | STEM WALL/RETAINING WALL | Partial Approval | stem wall on area A from line A3 to A13 on AJ ok, need to epoxy new bar going into existing wall where corner bars didn’t line up, make sure the special inspector sees and documents this and take photos. | |
| 04/02/2019 | STEM WALL/RETAINING WALL | Partial Approval | East trash chute w-3 wall | |
| 03/28/2019 | STEM WALL/RETAINING WALL | Partial Approval | Great check north stairwell and a previous five columns for clearance | |
| 03/27/2019 | STEM WALL/RETAINING WALL | Partial Approval | Columns AA/A10, AA/A12, AD/A18, AD/A20 & AD/ A22 | |
| 03/26/2019 | STEM WALL/RETAINING WALL | Partial Approval | Columns lower level AA/A7, AI/A5, AI/A11, AI/A8, AF/A1 W5&W2 walls at stairwell 5 only |