Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2021 |
ELECTRIC - UNDERGROUND |
|
Approved |
Approved |
| 06/12/2020 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial. Transformer pad, 15 each 3” conduits. Ok to cover progress area. |
| 06/08/2020 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial. Transformer to SES #3: conduits at 9 @ 3”; 4 @ 4”; 2 @ 4” for future use. Ok to cover progress areas. |
| 01/08/2020 |
ELECTRIC - UNDERGROUND |
|
Not ready for Inspection |
Contractor cancelled, rescheduled for 9 January. |
| 10/24/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
3" conduit from panel PW1W to Elevator 3. 3awg grounding bonding from SES 3 to 4. Ok to proceed |
| 10/21/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Two each 3" conduit lines from building to GL: #6; approximately 35’ for each trench. Ok to cover progress areas. |
| 10/16/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Two each 4" conduits at GL: C.5/4.3 approximately 40’, ok to cover progress areas. |
| 09/18/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Conduits in slab of Section B, at Level #2. |
| 08/06/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
north of A or Broadway conduits ok |
| 08/05/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
1- Primary electric conduit for the new transformer is okay to cover at Bldg. A North. |
| 07/25/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
conduits running east and west at south side of ramp OK |
| 06/27/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
1" and 3/4" conduits in slab. Section A. |
| 06/06/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Level P1 Area D only floor drain to sump pump only |
| 06/04/2019 |
ELECTRIC - UNDERGROUND |
|
Not ready for Inspection |
work not complete |
| 06/03/2019 |
ELECTRIC - UNDERGROUND |
|
Not ready for Inspection |
work not complete |
| 02/19/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Completion of secondaries 5×4 inch and 3×3 inch to trash chute |
| 02/15/2019 |
ELECTRIC - UNDERGROUND |
|
Cancelled |
already canceled by Dave |
| 02/14/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
5×4 inch and 3×3 inch secondaries from existing wall to trash chute 100 feet |