Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T17CM08216

Parcel: 11720016G


Addresses:

110 S CHURCH AV


Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Permit Number - T17CM08216

Inspection Description - ELECTRIC - UNDERGROUND

Inspection Status - Approved

Date Description Inspector Results Comments
07/21/2021 ELECTRIC - UNDERGROUND Approved Approved
06/12/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. Transformer pad, 15 each 3” conduits. Ok to cover progress area.
06/08/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. Transformer to SES #3: conduits at 9 @ 3”; 4 @ 4”; 2 @ 4” for future use. Ok to cover progress areas.
01/08/2020 ELECTRIC - UNDERGROUND Not ready for Inspection Contractor cancelled, rescheduled for 9 January.
10/24/2019 ELECTRIC - UNDERGROUND Partial Approval 3" conduit from panel PW1W to Elevator 3. 3awg grounding bonding from SES 3 to 4. Ok to proceed
10/21/2019 ELECTRIC - UNDERGROUND Partial Approval Two each 3" conduit lines from building to GL: #6; approximately 35’ for each trench. Ok to cover progress areas.
10/16/2019 ELECTRIC - UNDERGROUND Partial Approval Two each 4" conduits at GL: C.5/4.3 approximately 40’, ok to cover progress areas.
09/18/2019 ELECTRIC - UNDERGROUND Partial Approval Conduits in slab of Section B, at Level #2.
08/06/2019 ELECTRIC - UNDERGROUND Partial Approval north of A or Broadway conduits ok
08/05/2019 ELECTRIC - UNDERGROUND Partial Approval 1- Primary electric conduit for the new transformer is okay to cover at Bldg. A North.
07/25/2019 ELECTRIC - UNDERGROUND Partial Approval conduits running east and west at south side of ramp OK
06/27/2019 ELECTRIC - UNDERGROUND Partial Approval 1" and 3/4" conduits in slab. Section A.
06/06/2019 ELECTRIC - UNDERGROUND Partial Approval Level P1 Area D only floor drain to sump pump only
06/04/2019 ELECTRIC - UNDERGROUND Not ready for Inspection work not complete
06/03/2019 ELECTRIC - UNDERGROUND Not ready for Inspection work not complete
02/19/2019 ELECTRIC - UNDERGROUND Partial Approval Completion of secondaries 5×4 inch and 3×3 inch to trash chute
02/15/2019 ELECTRIC - UNDERGROUND Cancelled already canceled by Dave
02/14/2019 ELECTRIC - UNDERGROUND Partial Approval 5×4 inch and 3×3 inch secondaries from existing wall to trash chute 100 feet