Permit: T17CM08216

Parcel: 11720016G


Addresses:

110 S CHURCH AV


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T17CM08216

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/21/2021 EXCAVATION/LAYOUT REBAR & ZON Approved Approved
02/08/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL LEVEL 2 CRANE POUR BACK OK TO PLACE CONCRETE IN PROGRESS AREA
12/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Stairwell #5; stair footing, dowels epoxy anchored. Ok to place concrete in progress area.
11/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval . Partial. Planter footing on East side of building. Ok to place concrete in progress area.
10/15/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Removed Crain pad, rebar mat at P1 and P2 Levels (10’x10’). Ok to place concrete in progress area.

Please add Levels #L1 and L2 to this mat inspection.
08/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Mechanical shaft at Northeastern portion of building (#5 rebar in walls. Ok to set forms and place concrete in progress areas.
07/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Post Tension Cable repair; 7 areas, chipped, concrete replacement, tested tensile strength by special inspection.
06/30/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready. Contractor cancelled.
06/29/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready. Contractor cancelled.
05/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. 8 Columns on grid lines J thru K, rows 6 thru 9.
04/29/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval RVI Partial. (VRI). Garage Level #1; GL: L/5.5-9. Ok to place concrete in progress areas.
04/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #1, 2 each columns at GL: 7/J, 8/J. Level #2; Sections L-2; I: Post Tension Cable System in place. Ok to place concrete in progress areas.
04/16/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval RVI Wall footings and column footings at GL: K/7 and A/7. Ok to place concrete in progress areas.
04/15/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection RVI Contractor cancelled.
04/09/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Wall footings at GL: L/5-9.3; A/5.1-5.3. Ok to place concrete in progress areas.
04/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Nine #CC2 columns at Gl: F/7-9; G/7-9; H/7-9; garage ramp up to Level #2. Ok to place concrete in progress areas.
03/24/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Retaining wall at GL: 9/A-J. Ok to place concrete in progress area.
03/17/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4 each columns at GL: 6-6.6/J-K. Ok to place concrete.
03/12/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Concrete columns (3); at GL: 7/F; 7/G; 7/H; Column footings (F8) 3 each at GL: 6/J-K; 7/J. Ok to place concrete in progress areas.
03/10/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Three each F8 column footings at GL: 7/F-H. Ok to place concrete. 01010. Partial. Retaining wall at GL: 9/F-J at 11’ to 14’. Ok to place concrete I progress area.
02/19/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Section H; Level #2; 13 each columns. Ok to place concrete in progress areas. Ramp; Area I support column.
02/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Parking ramp at Level #2 into P-1 area. Ok to place concrete in progress area.
01/18/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Building "E"; Level #3; Post Tension Cable system. Ok to place concrete in progress area.
After hours inspection: check #032477; dated 1-17-18.
11/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #P-2; Section F; concrete columns (9). Ok to place concrete in progress areas.
11/25/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Contractor cancelled.
11/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Post Tension Cable System at Level #1; Section F. Ok to place concrete in progress areas.
11/19/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W-11 and W-2 walls at Stairwell #3; Elevator #4. Ok to place concrete in progress areas. Level P2
11/18/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level: EP2. 15 concrete columns at GL: E/5-6; 6/A.2-E; A.2/5-6; 5/A.2-E. OK to place concrete in progress areas.
11/13/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval This inspection was performed on 12 November.
11/12/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Section H, Level #2; 8 columns at GL; 7-8.1/A.2-D.
11/08/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Stem walls at GL: 4.3/A-D; 3’6”-5’8”. Ok to place concrete in progress areas.
11/06/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Six each concrete column cages at GL: 5/F; 5/G; 5/H: 6/F; 6/G; 6/H. Ok to place concrete.
10/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Two columns at D/6.6 and E/6.6. Ok to place concrete in progress areas.
10/17/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Elevator and stairwell walls at GL: A-A.8/5.5; A.3/5.1; A.3/.6. Ok to place concrete in walls.
10/11/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 2 columns on gl 6 - B B2 ok to pour
Pour back strip on P2 ok to pour
10/10/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Concrete column cages at GL: E/6; D/6; C/6; B/4.3. Ok to set forms and grout progress areas
10/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Column footings: CC4/F-16; CC3/F-3; CC2/F-3; CC2/F-8. Ok to place concrete.
10/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Elevator pit footing at GL: A.2 - A.8/4.6-5.1. Column footing (F-7) at GL: B.2/4.3; column footing (F-6) at B/5; Southwest step down at A/5.5. Ok to place concrete in progress areas.
09/27/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Post tension cable system on Level #2; Section C. Ok to place concrete.
09/23/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Columns at GL: 4.1/L.7; 5/L.6; 6/L.4. Ok to place concrete in progress areas.
09/18/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Double rebar mat on Level #2; Section B; Ok to place concrete in progress areas.
09/17/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Column footing at GL: Line 1; wall footing at GL: z/4-3. Ok to place concrete in progress areas.
09/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Two caisson footings and cages at GL: 5/L6; 6/L4. OK to place concrete.
08/29/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Pre-slab at Level #2; Section B at GL: a16-a24/aA-aE. Ok to place concrete.
08/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #2; Section D, Stairwell #1; Elevators #1 & 2 interior walls. Column at North East corner of slab: 8 additional #10 rebar added as per plans. Ok to place concrete in progress areas.
08/27/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #2; Section D; 7 columns. Columns on Level 2; Section D are complete. Ok to place concrete in progress areas.
08/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #2; Section D: 7 each columns at GL: J/2; J/3; J/4; J/5; K/3; K/4; K/5. Ok to place concrete in progress areas.
08/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Section C-L2; Stairwell #1; exterior walls.
08/21/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Area B, stem wall at GL: D,9/1.2-1.6. Ok to place concrete in progress areas.
08/20/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Section CL-2; reinspected 20 columns for clearance for form setting.
08/19/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 20 columns at Section CL-2. Ok to place concrete in progress areas.
08/15/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Section “B”; big wall at A21-A23/aA; small wall at A2-Ae. Ok to place concrete in progress areas.
08/14/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval C2 column at GL; a23/aA at level #1 to level #2. Ok to place concrete.
08/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval this was an on-site meeting to discuss the changes and revisions that are not aligning with the permitted and approved set of drawings. We are now awaiting on either the engineers approval on some conflicting issues in order to pour level 1 deck or work needs to be fixed to reflect the approved drawings.
08/07/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection too many different sets of drawings and too many revisions that are not up-to-date and stamped. Different drawings are saying different things. Issues with steps in the slab and the amount of bars and locations, issues with quantity of hairpins, issues with quantity of cables. Need the most up to date and current drawings on site and stamped and approved at time of inspection.
08/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement is okay for the footing located in bldg. B South between grid lines a23 to aE.
07/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval level 2 section A ok to pour.
07/15/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
07/10/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #P2; Section C, stairwell #2; walls at 8’ 2" pour height. Level #2; Section D: 16 each columns: 14 at CT2; 1 at CT4, 1 at CT5. Ok to form and place concrete.
07/08/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval (P2 area D deck) ok to pour pending special inspectors report on post tension.
07/02/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval area L2- area C, 20 columns.
07/01/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Did not pass special inspections
06/28/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Columns not ready. Will recall inspections.
06/27/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Section A. Ok to place concrete. (3000 psi)
06/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Post tension Pour C - L2 only
06/25/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W3 wall GL 9 from B-C.9
06/24/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection area H incomplete
06/19/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Slab and rebar in section H and stairwell number one.
06/12/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided in columns located between grid line G to 9, H to 9 and J to 9.
2- Steel reinforcement mat for slab between grid lines 2,5 to 5 and H to 5. Is okay for concrete.
06/10/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level P1 Areas C & D
GL 1-2.5 from E.35-L.4
06/07/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W3 & W1 walls
GL D.7, E.7 from 7.9-9.2
GL 7.9;9.2 from D.7-E.2
GL 9 from C.5-D.7
CC4 column C/5
06/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W1 wall GL 6.6 from G-F only
W2 wall stairwell 1 level 1 only
05/31/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
05/30/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided in footings for columns CC2 grid line 6.6 to F and CC2- CC4 grid line B-C to 5 to 4.5
05/24/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W3 wall GL AE from A9-A11
05/23/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CC2 columns GL AE/A9 & AE/A11
05/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F2 footings and W3 footing per detail 102
GL AE from A.9- A.11
05/21/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W9 wall GL F1 from 1.8-2
W1 wall GL H.3 from 5.5-6.6
W1 wall GL H.3 from G-J
05/20/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Wall footing on Gridline F 1.8 to 2 ok. Retaining wall 1st parking level gridline Z2 from X5 to G8 ok.
05/17/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection canceled
05/16/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection NO WORK
05/15/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Mechanical sump pit per detail 123 see highlighted s1.1 plan pending water stop
05/14/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W3 walls GL X11 from Z2-Z4
W3 walls GL Z2 from X5-X11
Except #4 dowels epoxy column X8 special inspection
Except weld plates 6” wall see highlighted S1.1 plan
05/13/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval elevator one and two pit walls only
05/10/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1005 excavation. Partial. Columns on Gridline six row F, G, H.
Columns on page S1.5 Gridline number eight and 8.1.
Columns on page S1.5 Gridline number seven and 6.5
Columns on grid lines F number eight and nine
Revised plan delta 7.1 Columns on Gridline six rows F,G,H
05/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
05/08/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval RFI change number 218. Line H columns on Row 2,3,&4.
05/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CC2 Columns lower level area D and 5/F, 5/G & 5/E
04/30/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 20 each CC2 columns level p1 areas C&D
See highlighted s1.1 plan
04/29/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CC2 Columns level P 1 GL 10.1/ A.3, B. B.8, C.9 & D.9
GL 10/ A.3, B, C, D & D.9
04/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Gridline F5 footing F8, Gridline G5 footing F4.
04/23/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F41 footer GL K/4
F58 footer GL Y.3 from yd-ya
Elevator 1&2 pit per note 12
F5 footer w1 wall GL y/c from 3-4.3
04/19/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection no work
04/18/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F7 footings GL 1.2/G.8
04/17/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F9&F10 footers GL AJ & A1 9E
F7, F59,F61 footings stairwell 3 delta 7.1 see rfi 199
F18,F61 footings GL 6.6 from J-H w1 wall
F7 footer GL H.3 from 5-6 W1 wall
04/15/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F5&F14 footers GL 9 from E.2-J see highlighted S2.2 page
F6 footer GL 3/K see highlighted S1.1 page
Trash chute deck see highlighted S3.4 page
04/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Spread footings on line 8 from F to J ok, make sure to maintain clearances below mat.
04/04/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Area "B" Stem wall (W3) at GL: aE/a16 - a23: Ok to place concrete. Column/wall footing at GL: 9/A.2-D, E/4.2-5. Ok to place concrete.
04/02/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F-2 footer 6.5/A.2, F-16 footer B/7,F-6 footer E.2/7 & F-15 footer ( see delta 7) F/6
03/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F-61 footer GL 6.6 from G-H.3 SEE DELTA 7
F-7 footer GL H.3 from 6.6-5.5
F-42 GL H/6
F-15 footer GL G/6
F-2 footer GL C/10
F-7 footer GL B/10
F-18 footer GL A.3/ 10.1
F-8 footer GL B/8
F-2 footer GL 7.2/ A.2
See highlighted S1.3 plan
03/25/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F56, F14, F57, F55, F2, F54 & F8 footings see highlighted S1.3 plan level P1
03/21/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancel by contractor
03/20/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval See highlighted S3.4, S3.5 & S3.9 plan see RFI 132 at trash chute deck
03/06/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F65 footer E.4/4, F64 footer E.4/3, F64 footer J.4/2, F18 footer E.4/1.6, F58 footer E.4/1.8 per detail 102
F1, F7, F10, F14&F18 footers See highlighted S1.1 plan
03/01/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F-45 footer. C2 F/1.2
F-46 footer cc2 F.5/1.2
F-2 footers F.2/1.5&2
F-3 footers F.2/3&4
F-4 footers H/2,3,4&1.6
F31 footer K/2
See highlighted S1.1 plan
02/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F4 footer G/2 1.6, F47 footer G/ 1.2, F48 footer G/8 1.2 & F50 footer J/1.6
See highlighted S1.1 plan
02/27/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F8 footings G4 and G3
F4 footings G2, J3 and J 2
F41 footing J4&5
See highlighted S1.1 plan
02/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Trash enclosure floor
02/12/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Foundation for crane OK to pour
01/24/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval See rfi 138 pedestal f-12 footers north of GL 21 at existing building
01/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval W14 walls at trash chute. See highlighted S1.4 plan
01/10/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Trash chute foundation F 18, 2 F 10 and F9 continuous footings GL 8/14 & GL AD See highlighted S1.4 plan
01/09/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection canceled by Dave