Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T17CM08216
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2021 | EXCAVATION/LAYOUT REBAR & ZON | Approved | Approved | |
| 02/08/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL LEVEL 2 CRANE POUR BACK OK TO PLACE CONCRETE IN PROGRESS AREA | |
| 12/08/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Stairwell #5; stair footing, dowels epoxy anchored. Ok to place concrete in progress area. | |
| 11/13/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | . Partial. Planter footing on East side of building. Ok to place concrete in progress area. | |
| 10/15/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Removed Crain pad, rebar mat at P1 and P2 Levels (10’x10’). Ok to place concrete in progress area. Please add Levels #L1 and L2 to this mat inspection. |
|
| 08/05/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Mechanical shaft at Northeastern portion of building (#5 rebar in walls. Ok to set forms and place concrete in progress areas. | |
| 07/08/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Post Tension Cable repair; 7 areas, chipped, concrete replacement, tested tensile strength by special inspection. | |
| 06/30/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Not ready. Contractor cancelled. | |
| 06/29/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Not ready. Contractor cancelled. | |
| 05/13/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. 8 Columns on grid lines J thru K, rows 6 thru 9. | |
| 04/29/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | RVI Partial. (VRI). Garage Level #1; GL: L/5.5-9. Ok to place concrete in progress areas. | |
| 04/21/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #1, 2 each columns at GL: 7/J, 8/J. Level #2; Sections L-2; I: Post Tension Cable System in place. Ok to place concrete in progress areas. | |
| 04/16/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | RVI Wall footings and column footings at GL: K/7 and A/7. Ok to place concrete in progress areas. | |
| 04/15/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | RVI Contractor cancelled. | |
| 04/09/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Wall footings at GL: L/5-9.3; A/5.1-5.3. Ok to place concrete in progress areas. | |
| 04/03/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Nine #CC2 columns at Gl: F/7-9; G/7-9; H/7-9; garage ramp up to Level #2. Ok to place concrete in progress areas. | |
| 03/24/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Retaining wall at GL: 9/A-J. Ok to place concrete in progress area. | |
| 03/17/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 4 each columns at GL: 6-6.6/J-K. Ok to place concrete. | |
| 03/12/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Concrete columns (3); at GL: 7/F; 7/G; 7/H; Column footings (F8) 3 each at GL: 6/J-K; 7/J. Ok to place concrete in progress areas. | |
| 03/10/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Three each F8 column footings at GL: 7/F-H. Ok to place concrete. 01010. Partial. Retaining wall at GL: 9/F-J at 11’ to 14’. Ok to place concrete I progress area. | |
| 02/19/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Section H; Level #2; 13 each columns. Ok to place concrete in progress areas. Ramp; Area I support column. | |
| 02/05/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Parking ramp at Level #2 into P-1 area. Ok to place concrete in progress area. | |
| 01/18/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Building "E"; Level #3; Post Tension Cable system. Ok to place concrete in progress area. After hours inspection: check #032477; dated 1-17-18. |
|
| 11/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #P-2; Section F; concrete columns (9). Ok to place concrete in progress areas. | |
| 11/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 11/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post Tension Cable System at Level #1; Section F. Ok to place concrete in progress areas. | |
| 11/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W-11 and W-2 walls at Stairwell #3; Elevator #4. Ok to place concrete in progress areas. Level P2 | |
| 11/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level: EP2. 15 concrete columns at GL: E/5-6; 6/A.2-E; A.2/5-6; 5/A.2-E. OK to place concrete in progress areas. | |
| 11/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | This inspection was performed on 12 November. | |
| 11/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Section H, Level #2; 8 columns at GL; 7-8.1/A.2-D. | |
| 11/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Stem walls at GL: 4.3/A-D; 3’6”-5’8”. Ok to place concrete in progress areas. | |
| 11/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Six each concrete column cages at GL: 5/F; 5/G; 5/H: 6/F; 6/G; 6/H. Ok to place concrete. | |
| 10/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Two columns at D/6.6 and E/6.6. Ok to place concrete in progress areas. | |
| 10/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Elevator and stairwell walls at GL: A-A.8/5.5; A.3/5.1; A.3/.6. Ok to place concrete in walls. | |
| 10/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 2 columns on gl 6 - B B2 ok to pour Pour back strip on P2 ok to pour |
|
| 10/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Concrete column cages at GL: E/6; D/6; C/6; B/4.3. Ok to set forms and grout progress areas | |
| 10/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Column footings: CC4/F-16; CC3/F-3; CC2/F-3; CC2/F-8. Ok to place concrete. | |
| 10/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Elevator pit footing at GL: A.2 - A.8/4.6-5.1. Column footing (F-7) at GL: B.2/4.3; column footing (F-6) at B/5; Southwest step down at A/5.5. Ok to place concrete in progress areas. | |
| 09/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post tension cable system on Level #2; Section C. Ok to place concrete. | |
| 09/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns at GL: 4.1/L.7; 5/L.6; 6/L.4. Ok to place concrete in progress areas. | |
| 09/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Double rebar mat on Level #2; Section B; Ok to place concrete in progress areas. | |
| 09/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Column footing at GL: Line 1; wall footing at GL: z/4-3. Ok to place concrete in progress areas. | |
| 09/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Two caisson footings and cages at GL: 5/L6; 6/L4. OK to place concrete. | |
| 08/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Pre-slab at Level #2; Section B at GL: a16-a24/aA-aE. Ok to place concrete. | |
| 08/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; Section D, Stairwell #1; Elevators #1 & 2 interior walls. Column at North East corner of slab: 8 additional #10 rebar added as per plans. Ok to place concrete in progress areas. | |
| 08/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; Section D; 7 columns. Columns on Level 2; Section D are complete. Ok to place concrete in progress areas. | |
| 08/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; Section D: 7 each columns at GL: J/2; J/3; J/4; J/5; K/3; K/4; K/5. Ok to place concrete in progress areas. | |
| 08/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Section C-L2; Stairwell #1; exterior walls. | |
| 08/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Area B, stem wall at GL: D,9/1.2-1.6. Ok to place concrete in progress areas. | |
| 08/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Section CL-2; reinspected 20 columns for clearance for form setting. | |
| 08/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 20 columns at Section CL-2. Ok to place concrete in progress areas. | |
| 08/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Section “B”; big wall at A21-A23/aA; small wall at A2-Ae. Ok to place concrete in progress areas. | |
| 08/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | C2 column at GL; a23/aA at level #1 to level #2. Ok to place concrete. | |
| 08/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | this was an on-site meeting to discuss the changes and revisions that are not aligning with the permitted and approved set of drawings. We are now awaiting on either the engineers approval on some conflicting issues in order to pour level 1 deck or work needs to be fixed to reflect the approved drawings. | |
| 08/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | too many different sets of drawings and too many revisions that are not up-to-date and stamped. Different drawings are saying different things. Issues with steps in the slab and the amount of bars and locations, issues with quantity of hairpins, issues with quantity of cables. Need the most up to date and current drawings on site and stamped and approved at time of inspection. | |
| 08/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Steel reinforcement is okay for the footing located in bldg. B South between grid lines a23 to aE. | |
| 07/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | level 2 section A ok to pour. | |
| 07/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
| 07/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #P2; Section C, stairwell #2; walls at 8’ 2" pour height. Level #2; Section D: 16 each columns: 14 at CT2; 1 at CT4, 1 at CT5. Ok to form and place concrete. | |
| 07/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | (P2 area D deck) ok to pour pending special inspectors report on post tension. | |
| 07/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | area L2- area C, 20 columns. | |
| 07/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Did not pass special inspections | |
| 06/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Columns not ready. Will recall inspections. | |
| 06/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Section A. Ok to place concrete. (3000 psi) | |
| 06/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post tension Pour C - L2 only | |
| 06/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W3 wall GL 9 from B-C.9 | |
| 06/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | area H incomplete | |
| 06/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Slab and rebar in section H and stairwell number one. | |
| 06/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Steel reinforcement provided in columns located between grid line G to 9, H to 9 and J to 9. 2- Steel reinforcement mat for slab between grid lines 2,5 to 5 and H to 5. Is okay for concrete. |
|
| 06/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level P1 Areas C & D GL 1-2.5 from E.35-L.4 |
|
| 06/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W3 & W1 walls GL D.7, E.7 from 7.9-9.2 GL 7.9;9.2 from D.7-E.2 GL 9 from C.5-D.7 CC4 column C/5 |
|
| 06/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W1 wall GL 6.6 from G-F only W2 wall stairwell 1 level 1 only |
|
| 05/31/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
| 05/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Steel reinforcement provided in footings for columns CC2 grid line 6.6 to F and CC2- CC4 grid line B-C to 5 to 4.5 | |
| 05/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W3 wall GL AE from A9-A11 | |
| 05/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CC2 columns GL AE/A9 & AE/A11 | |
| 05/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F2 footings and W3 footing per detail 102 GL AE from A.9- A.11 |
|
| 05/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W9 wall GL F1 from 1.8-2 W1 wall GL H.3 from 5.5-6.6 W1 wall GL H.3 from G-J |
|
| 05/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Wall footing on Gridline F 1.8 to 2 ok. Retaining wall 1st parking level gridline Z2 from X5 to G8 ok. | |
| 05/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | canceled | |
| 05/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | NO WORK | |
| 05/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Mechanical sump pit per detail 123 see highlighted s1.1 plan pending water stop | |
| 05/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W3 walls GL X11 from Z2-Z4 W3 walls GL Z2 from X5-X11 Except #4 dowels epoxy column X8 special inspection Except weld plates 6” wall see highlighted S1.1 plan |
|
| 05/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | elevator one and two pit walls only | |
| 05/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1005 excavation. Partial. Columns on Gridline six row F, G, H. Columns on page S1.5 Gridline number eight and 8.1. Columns on page S1.5 Gridline number seven and 6.5 Columns on grid lines F number eight and nine Revised plan delta 7.1 Columns on Gridline six rows F,G,H |
|
| 05/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
| 05/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | RFI change number 218. Line H columns on Row 2,3,&4. | |
| 05/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CC2 Columns lower level area D and 5/F, 5/G & 5/E | |
| 04/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 20 each CC2 columns level p1 areas C&D See highlighted s1.1 plan |
|
| 04/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CC2 Columns level P 1 GL 10.1/ A.3, B. B.8, C.9 & D.9 GL 10/ A.3, B, C, D & D.9 |
|
| 04/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Gridline F5 footing F8, Gridline G5 footing F4. | |
| 04/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F41 footer GL K/4 F58 footer GL Y.3 from yd-ya Elevator 1&2 pit per note 12 F5 footer w1 wall GL y/c from 3-4.3 |
|
| 04/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | no work | |
| 04/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F7 footings GL 1.2/G.8 | |
| 04/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F9&F10 footers GL AJ & A1 9E F7, F59,F61 footings stairwell 3 delta 7.1 see rfi 199 F18,F61 footings GL 6.6 from J-H w1 wall F7 footer GL H.3 from 5-6 W1 wall |
|
| 04/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F5&F14 footers GL 9 from E.2-J see highlighted S2.2 page F6 footer GL 3/K see highlighted S1.1 page Trash chute deck see highlighted S3.4 page |
|
| 04/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Spread footings on line 8 from F to J ok, make sure to maintain clearances below mat. | |
| 04/04/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Area "B" Stem wall (W3) at GL: aE/a16 - a23: Ok to place concrete. Column/wall footing at GL: 9/A.2-D, E/4.2-5. Ok to place concrete. | |
| 04/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F-2 footer 6.5/A.2, F-16 footer B/7,F-6 footer E.2/7 & F-15 footer ( see delta 7) F/6 | |
| 03/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F-61 footer GL 6.6 from G-H.3 SEE DELTA 7 F-7 footer GL H.3 from 6.6-5.5 F-42 GL H/6 F-15 footer GL G/6 F-2 footer GL C/10 F-7 footer GL B/10 F-18 footer GL A.3/ 10.1 F-8 footer GL B/8 F-2 footer GL 7.2/ A.2 See highlighted S1.3 plan |
|
| 03/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F56, F14, F57, F55, F2, F54 & F8 footings see highlighted S1.3 plan level P1 | |
| 03/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Cancel by contractor | |
| 03/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | See highlighted S3.4, S3.5 & S3.9 plan see RFI 132 at trash chute deck | |
| 03/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F65 footer E.4/4, F64 footer E.4/3, F64 footer J.4/2, F18 footer E.4/1.6, F58 footer E.4/1.8 per detail 102 F1, F7, F10, F14&F18 footers See highlighted S1.1 plan |
|
| 03/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F-45 footer. C2 F/1.2 F-46 footer cc2 F.5/1.2 F-2 footers F.2/1.5&2 F-3 footers F.2/3&4 F-4 footers H/2,3,4&1.6 F31 footer K/2 See highlighted S1.1 plan |
|
| 02/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F4 footer G/2 1.6, F47 footer G/ 1.2, F48 footer G/8 1.2 & F50 footer J/1.6 See highlighted S1.1 plan |
|
| 02/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F8 footings G4 and G3 F4 footings G2, J3 and J 2 F41 footing J4&5 See highlighted S1.1 plan |
|
| 02/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Trash enclosure floor | |
| 02/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Foundation for crane OK to pour | |
| 01/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | See rfi 138 pedestal f-12 footers north of GL 21 at existing building | |
| 01/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | W14 walls at trash chute. See highlighted S1.4 plan | |
| 01/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Trash chute foundation F 18, 2 F 10 and F9 continuous footings GL 8/14 & GL AD See highlighted S1.4 plan | |
| 01/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | canceled by Dave |