Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T17CM08216
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2021 | BUILDING PRE-SLAB | Approved | Approved | |
| 06/03/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #2; Section G; Post Tension Cable system. Ok to place concrete in progress areas. | |
| 05/11/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post Tension Cable System at GL: L/5-9; 6.6/H-J. Ok to place concrete in progress areas. | |
| 04/29/2020 | BUILDING PRE-SLAB | Partial Approval | RVI Partial. (VRI). Garage Level #1 and Electric Room at GL: L/5.5-9. Electric conduits for outlets are in place. Area termite treated. Ok to place concrete in progress areas. | |
| 04/01/2020 | BUILDING PRE-SLAB | Partial Approval | Ramp for parking garage, ground level to entrance of garage (ramp complete). GL:6.6-9/E.2-J. Ok to place concrete in progress areas. RVI |
|
| 03/24/2020 | BUILDING PRE-SLAB | Partial Approval | Garage ramp at GL: 6.6/A-J; 9/A-J. Ok to place concrete in progress areas | |
| 03/20/2020 | BUILDING PRE-SLAB | Not ready for Inspection | Contractor cancelled. Will reschedule for 23 March. | |
| 03/03/2020 | BUILDING PRE-SLAB | Partial Approval | Level #2;Section H: Post Tension Cable System. Ok to place concrete in progress areas. | |
| 02/14/2020 | BUILDING PRE-SLAB | Partial Approval | Post tension at first level south section OK. | |
| 02/05/2020 | BUILDING PRE-SLAB | Not ready for Inspection | Contractor cancelled. | |
| 01/31/2020 | BUILDING PRE-SLAB | Not ready for Inspection | Contractor cancelled. Sub-deck at Section C, Level #4 not ready. | |
| 01/30/2020 | BUILDING PRE-SLAB | Partial Approval | Apron for Ramp I, Ok to place concrete. | |
| 01/22/2020 | BUILDING PRE-SLAB | Partial Approval | Section E, Post Tension Cable System inspected 19 January. Ok to place concrete in progress areas. | |
| 12/31/2019 | BUILDING PRE-SLAB | Partial Approval | Level #2; Section F, Post Tension Cable System. Ok to,place concrete in progress. | |
| 12/10/2019 | BUILDING PRE-SLAB | Partial Approval | Post Tension Cable System at Level #2; Section E. Ok to place concrete in progress areas. | |
| 12/09/2019 | BUILDING PRE-SLAB | Not ready for Inspection | Rained out. Reschedule for 10 December. | |
| 11/14/2019 | BUILDING PRE-SLAB | Partial Approval | Level #2; slab area EP-2 at GL: A-E.3/4.2-6.6. Post Tension Cable System, Ok to place concrete in progress areas. | |
| 11/13/2019 | BUILDING PRE-SLAB | Partial Approval | This inspection was performed on 12 November. | |
| 11/07/2019 | BUILDING PRE-SLAB | Partial Approval | P-2 slab, Post Tension Cable System at GL: A/6.5-9; D/6.5-9. Ok to place concrete in progress areas. | |
| 10/30/2019 | BUILDING PRE-SLAB | Partial Approval | Area E-1 slab at GL: 7/A.1-D; 4.3-7/D-A.1. Area F-2; Post Tension Cable System at GL: 5/E.4-H; H/4.6-6.6. Ok to place concrete in progress areas. | |
| 10/17/2019 | BUILDING PRE-SLAB | Partial Approval | Slab at GL: C-H/4.6-7. Ok to place concrete. Grounding for IDF Room within this slab. | |
| 10/10/2019 | BUILDING PRE-SLAB | Not ready for Inspection | This inspection was performed on 9 October. | |
| 10/09/2019 | BUILDING PRE-SLAB | Partial Approval | Post Tension Cable system on Level #2; Section D. Ok to place concrete in progress areas. | |
| 09/27/2019 | BUILDING PRE-SLAB | Partial Approval | Level #2; Section C: Electric and plumbing in place in the slab area. Ok to place concrete in progress areas. | |
| 09/23/2019 | BUILDING PRE-SLAB | Not ready for Inspection | Discrepancy in PT plans. Need to submit corrections | |
| 09/18/2019 | BUILDING PRE-SLAB | Partial Approval | Slab at Level #2; Section B; double meat rebar. | |
| 08/22/2019 | BUILDING PRE-SLAB | Partial Approval | Section D-L2: Post Tension Cable System. Ok to place concrete. | |
| 08/19/2019 | BUILDING PRE-SLAB | Partial Approval | Exterior wall at GL: A/5.5. Ok to place concrete in progress areas. | |
| 08/14/2019 | BUILDING PRE-SLAB | Partial Approval | Post Tension cable system at Level #1; Section. "C". Ok to place concrete. | |
| 08/07/2019 | BUILDING PRE-SLAB | Not ready for Inspection | too many different sets of drawings and too many revisions that are not up-to-date and stamped. Different drawings are saying different things. Issues with steps in the slab and the amount of bars and locations, issues with quantity of hairpins, issues with quantity of cables. Need the most up to date and current drawings on site and stamped and approved at time of inspection. | |
| 07/08/2019 | BUILDING PRE-SLAB | Partial Approval | (P2 area D deck) ok to pour pending special inspectors report on post tension. | |
| 06/27/2019 | BUILDING PRE-SLAB | Partial Approval | Section A. Ok to place concrete. | |
| 06/26/2019 | BUILDING PRE-SLAB | Partial Approval | Post tension Pour C - L2 only | |
| 06/19/2019 | BUILDING PRE-SLAB | Partial Approval | Slab and rebar in section H and stairwell number one. | |
| 06/12/2019 | BUILDING PRE-SLAB | Partial Approval | 1- Steel reinforcement provided in columns located between grid line G to 9, H to 9 and J to 9. 2- Steel reinforcement mat for slab between grid lines 2,5 to 5 and H to 5. Is okay for concrete. |
|
| 06/07/2019 | BUILDING PRE-SLAB | Partial Approval | W3 & W1 walls GL D.7, E.7 from 7.9-9.2 GL 7.9;9.2 from D.7-E.2 GL 9 from C.5-D.7 CC4 column C/5 |
|
| 05/03/2019 | BUILDING PRE-SLAB | Partial Approval | CC2 Columns lower level area D and 5/F, 5/G & 5/E | |
| 04/18/2019 | BUILDING PRE-SLAB | Not ready for Inspection | no work |