Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL NEW
Address NEW:
6567 E CARONDELET DR
Apply Date:
11/08/2006
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
NEW 5 STORY MEDICAL OFFICE BUILDING (Shell)
Architects:
  • BOLLARD, MARK EDWARD
Contractors:
  • DIVERSIFIED DESIGN AND CONSTRUCT

Permit Reviews

Permit Number - T06CM05804
Permit Status: Final
Permit Description: NEW 5 STORY MEDICAL OFFICE BUILDING (Shell)
Start Date Submittal Complete Date Status  
02/01/2007 SITE 03/05/2007 COMPLETED Review Details
02/06/2007 POST 3RD PARTY REVIEW 03/07/2007 COMPLETED Review Details
03/05/2007 RESUBMITTAL - SITE 03/08/2007 COMPLETED Review Details
03/29/2007 3RD PARTY REVIEW-REVISION/OTHER 04/02/2007 COMPLETED Review Details
03/31/2008 3RD PARTY REVIEW-REVISION/OTHER 04/30/2008 COMPLETED Review Details
04/30/2008 3RD PARTY REVIEW-REVISION/OTHER 05/01/2008 COMPLETED Review Details
06/09/2008 3RD PARTY REVIEW-REVISION/OTHER 08/20/2008 COMPLETED Review Details
08/20/2008 3RD PARTY REVIEW-REVISION/OTHER 09/03/2008 COMPLETED Review Details
09/03/2008 3RD PARTY REVIEW-REVISION/OTHER 09/03/2008 COMPLETED Review Details
11/08/2006 PLANS OK TO SUBMIT - COMM 11/08/2006 COMPLETED Review Details
11/08/2006 3RD PARTY REVIEW-COMMERCIAL 02/06/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM05804
Permit Status: Final
Permit Description: NEW 5 STORY MEDICAL OFFICE BUILDING (Shell)
Total Outstanding Activity Conditions - 1
Date Name
11/08/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T06CM05804
Permit Description: NEW 5 STORY MEDICAL OFFICE BUILDING (Shell)
Total Completed Inspections - 45
Date Description Inspector Results Comments
06/29/2007 STEM WALL/RETAINING WALL JBURGE Approved IVRS - Inspection :*
VAULT WALLS & CEILINGS -- OK TO POUR
07/02/2007 PLUMBING - ROOF DRAINS BBENEDON Approved IVRS - Inspection :*
RWL FROM 2ND FLOOR CEILING TO 1ST LEVEL CEILING, OK
FIRST LEVEL TEST NEEDED AFTER COMPLETING WALL PENETRATIONS
07/03/2007 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
07/03/2007 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
09/10/2007 PLUMBING - PRE SLAB BBENEDON Approved IVRS - Inspection :*
ALL PIPING INSIDE SHELL BUILDING OK FOR CONCRETE
10/16/2007 FRAMING JBURGE Approved IVRS - Inspection :*
3RD FLOOR CORRIDOR #308 - OK TO SHEETROCK ONE SIDE
10/18/2007 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved IVRS - Inspection :*
3 @ EQUIPMENT PADS @ S.WEST CORNER OF BUILDING
OK TO POUR
10/26/2007 ELECTRIC - UNDERGROUND RHOLLAND Approved IVRS - Inspection :*
11/13/2007 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
1) PARTIAL CORRIDOR #408 INTERIOR SIDE, 8'-13' OK TO TAPE
11/26/2007 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
4TH & 5TH SLABS - LOBBY #401; #501 - OK TO POUR
11/27/2007 PLUMBING - YARD WTR LINE/TEST BBENEDON Approved IVRS - Inspection :*
1) 1ST FLOOR VENTS OK
2) DOMESTIC WATER PIPING LEVEL 4 OK FOR INSULATION
3) 4" TYPE K WATER PIPING BELOW GRADE OK TO COVER
12/07/2007 ROOF NAILING JBURGE Approved IVRS - Inspection :*
METAL ROOF SYSTEM - PINNED
12/19/2007 REINFORCED MASONRY PRE-GROUT JBURGE Approved IVRS - Inspection :*
EAST STAIRWELL #1, ELEVATOR, ROOM #601: ALL @ 80'8"
TOPPED OUT
12/28/2007 PLUMBING - INTERMEDIATE BBENEDON Approved IVRS - Inspection :*
- BRANCH PIPING SERVING DOMESTIC WATER TO 1ST & 2ND LEVEL
- TOILET RMS OK TO INSULATE
- ALL BRANCH LINES SERVING FLUSH-O-METER VALVES REQUIRE WATER HAMMER ARRESTORS PER UPC SEC 609.10
12/28/2007 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection :*
OK AS MARKED WITH GREEN STICKERS
CONTRACTOR TO MAINTAIN LO/TO

1. NEED DOORS BEFORE FINAL
12/28/2007 ELECTRIC - TEMP POWER FOR TEST RHOLLAND Approved IVRS - Inspection :*
12/31/2007 TEP CLEARANCE - AM BFLORES Approved OK TEMP POWER (TMPP) PER R.HOLLANDER
05/16/2008 PLUMBING - GAS PRESSURE TEST BBENEDON Approved IVRS - Inspection :*
WELDER CERTS OK
LOW PSI TEST & HANGERS OK
INSTALL REGULATORS
RECALL FOR GAS TEST FINAL
05/27/2008 PLUMBING - GAS PRESS TEST FNL BBENEDON Approved IVRS - Inspection :*
08/06/2008 SIGN - FINAL JYBARRA Approved SHELL ONLY
08/06/2008 RIGHT OF WAY - FINAL PWHIDDON Approved PER EMAIL
08/11/2008 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
2ND FLOOR CORRIDOR
SHELL PORTION COMPLETE
08/12/2008 ELECTRIC - OUTDOOR LIGHTING RJIROUDE Approved IVRS - Inspection :*
08/14/2008 ELECTRIC - TEMPORARY SERVICE RJIROUDE Approved
08/14/2008 PLUMBING - ROUGH, SOIL BBENEDON Approved IVRS - Inspection :*
08/14/2008 SITE - SEWER BBENEDON Approved IVRS - Inspection :*
08/14/2008 ELECTRIC - PROGRESS RJIROUDE Approved IVRS - Inspection :*
08/14/2008 ELECTRIC - FINAL RJIROUDE Approved IVRS - Inspection :*
08/14/2008 OUTDOOR LIGHTING FINAL RJIROUDE Approved IVRS - Inspection :*
08/14/2008 ELECTRIC - ABOVE CEILING RJIROUDE Approved IVRS - Inspection :*
08/18/2008 FIRE SPKLR - FINAL LTHOMAS Approved
08/18/2008 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
08/19/2008 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR FINAL
TESTED SMOKE DETECTORS
08/19/2008 MECHANICAL - PROGRESS JMILITEL Approved
08/19/2008 MECHANICAL - ABOVE CEILING JMILITEL Approved
08/19/2008 MECHANICAL - INTERMEDIATE JMILITEL Approved
08/19/2008 FIRE - ALARM FINAL LTHOMAS Approved
08/19/2008 FIRE - FINAL LTHOMAS Approved
08/20/2008 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
TRADES AND FIRE FINALED
08/20/2008 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
YOU STILL HAVE OPEN SEWER VENTS ON THE 5TH FLOOR!!!
08/20/2008 BUILDING - PROGRESS JBURGE Approved IVRS - Inspection :*
08/20/2008 PLUMBING - ABOVE CEILING BBENEDON Approved IVRS - Inspection :*
12/03/2008 ENGINEERING - FINAL JBRUCKME Approved
12/03/2008 NPPO - FINAL ACONNOR Approved
12/03/2008 LANDSCAPE - FINAL ACONNOR Approved