Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
3301 E GLOBAL LP
Address NEW:
3301 E GLOBAL LP
Apply Date:
12/19/2025
Applicant:
Brandy Burke
Description:
THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.

Permit Reviews

Permit Number - TC-COM-1225-02297
Permit Status: Inspections
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Start Date Submittal Complete Date Status  
02/05/2026 COMMERCIAL REVIEW - FULL v.2 03/03/2026 REQUIRES RESUBMIT Review Details
04/09/2026 COMMERCIAL REVIEW - FULL v.3 04/20/2026 APPROVED Review Details
07/17/2026 SPECIAL INSPECTION REVIEW v.1 07/23/2026 APPROVED Review Details
08/24/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/25/2026 APPROVED Review Details
04/20/2026 RESTAMP - COMMERCIAL v.1 04/21/2026 APPROVED Review Details
12/22/2025 COMMERCIAL REVIEW - FULL v.1 01/22/2026 REQUIRES RESUBMIT Review Details
08/13/2026 SPECIAL INSPECTION REVIEW v.1 08/24/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1225-02297
Permit Status: Inspections
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Outstanding Activity Conditions - 1
Date Name
01/21/2026 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-1225-02297
Permit Status: Inspections
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Date Description Comments
01/21/2026 SPECIAL INSPECTION OF COLD-FORMED STEEL FRAMING IS REQUIRED.
04/17/2026 SPECIAL INSPECTION OF CONCRETE/REINFORCING STEEL IS REQUIRED.
04/17/2026 SPECIAL INSPECTION OF STRUCTURAL MASONRY REINFORCEMENT IS REQUIRED.
12/22/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/21/2026 SPECIAL INSPECTION INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
12/22/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/21/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
01/21/2026 SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED.
01/21/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1225-02297
Permite Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
05/01/2026 COT - BULD - SWG Clearance N/A Not Applicable
05/01/2026 BULD - Electrical Clearance N/A Not Applicable
05/01/2026 COT - LCBU - Framing N/A Partial Pass 5/1/26: framing approved @ GL A-F/1-8, GL A.1-B.1/8.5-9.5, GL B1-E/10.5-11.5
05/06/2026 COT - LCBU - Roof Nailing N/A Not Applicable 5-6-26: not applicable.
05/06/2026 COT - LCME - Hydronic Piping N/A Not Applicable 5-6-26: not applicable.
06/11/2026 COT - LCBU - Stem Wall/Retaining Wall N/A Not Applicable 6-11-26: not applicable.
08/24/2026 COT - LCBU - Building Final N/A Partial Pass 8/24/2026 Partial pass. Pending air and balance report. Note: one unit is down a letter will be submitted for the meantime prior to the correction that has to be made. Okay to apply for level 4 TCO.
08/24/2026 COT - LCME - Mechanical Final N/A Partial Pass 8/24/2026 Partial pass. Pending air and balance report.
08/11/2026 COT - LCPL - Plumbing Final N/A Partial Pass 8-11-26: pending water sterilization report.
08/25/2026 ENGR Engineering Final N/A Partial Pass ‘Air Balancing' condition has not yet been satisfied. This must be done prior to Final pass.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1225-02297
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Completed Inspections - 16
Date Description Inspector Results Comments
05/06/2026 COT - LCBU - Framing Passed 5-6-26: previously inspected & approved.
05/06/2026 COT - LCPL - Rough Soil Passed 5-6-26: previously inspected & approved.
05/06/2026 COT - LCPL - Plumbing Intermediate Passed 5-6-26: plumbing intermediates approved.
05/06/2026 TRSP - ROW - Final/Close-Out Passed no impact to right of way landscape, sidewalk, or asphalt. No traffic control devices on site, approved.
06/11/2026 COT - LCBU - Masonry Pregrout Passed 6-11-26: masonry pre grout at "facilities" cmu walls previous inspected all lifts/top out.
06/11/2026 COT - LCBU - Preslab Passed 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement.
06/11/2026 COT - LCBU - Excavation/Rebar/Zoning Passed 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement.
07/30/2026 COT - LCEL - Electrical Above Ceiling Passed 7-30-26: electrical above ceiling approved.
07/30/2026 COT - LCME - Mechanical Above Ceiling Passed 7-30-26: mechanical above ceiling approved.
07/30/2026 COT - LCEL - Electrical Intermediate Passed 7-30-26: electrical intermediates approved.
07/30/2026 COT - LCME - Mechanical Intermediate Passed 7-30-26: mechanical intermediates approved.
08/12/2026 COT - FCON - Fire - Final Passed
08/19/2026 COT - FCON - Sprinkler - Final Passed
08/19/2026 COT - FCON - Alarm - Final Passed
08/24/2026 COT - LCEL - Electrical Final Passed
08/24/2026 COT - LCPL - Plumbing Final Passed