Permit: TC-COM-1225-02297
Permit Details
Apply Date:
12/19/2025
Applicant:
Brandy Burke
Description:
THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Permit Reviews
Permit Number - TC-COM-1225-02297
Permit Status: Issued
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK.
INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS.
NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2026 | COMMERCIAL REVIEW - FULL v.2 | 03/03/2026 | REQUIRES RESUBMIT |
| 04/09/2026 | COMMERCIAL REVIEW - FULL v.3 | 04/20/2026 | APPROVED |
| 07/17/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/23/2026 | APPROVED |
| 04/20/2026 | RESTAMP - COMMERCIAL v.1 | 04/21/2026 | APPROVED |
| 12/22/2025 | COMMERCIAL REVIEW - FULL v.1 | 01/22/2026 | REQUIRES RESUBMIT |
| 08/13/2026 | SPECIAL INSPECTION REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-1225-02297
Permit Status: Issued
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK.
INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS.
NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 01/21/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 01/21/2026 | SPECIAL INSPECTION OF COLD-FORMED STEEL FRAMING IS REQUIRED. |
| 01/21/2026 | SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED. |
| 01/21/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1225-02297
Permit Status: Issued
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK.
INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS.
NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
| Date | Description | Comments |
|---|---|---|
| 04/17/2026 | SPECIAL INSPECTION OF CONCRETE/REINFORCING STEEL IS REQUIRED. | |
| 04/17/2026 | SPECIAL INSPECTION OF STRUCTURAL MASONRY REINFORCEMENT IS REQUIRED. | |
| 12/22/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/21/2026 | SPECIAL INSPECTION INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED. | |
| 12/22/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/21/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1225-02297
Permite Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK.
INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS.
NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/01/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 05/01/2026 | COT - LCBU - Framing | N/A | Partial Pass | 5/1/26: framing approved @ GL A-F/1-8, GL A.1-B.1/8.5-9.5, GL B1-E/10.5-11.5 |
| 05/06/2026 | COT - LCBU - Roof Nailing | N/A | Not Applicable | 5-6-26: not applicable. |
| 05/06/2026 | COT - LCME - Hydronic Piping | N/A | Not Applicable | 5-6-26: not applicable. |
| 06/11/2026 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Not Applicable | 6-11-26: not applicable. |
| 08/11/2026 | COT - LCPL - Plumbing Final | N/A | Partial Pass | 8-11-26: pending water sterilization report. |
| 08/10/2026 | COT - LCEL - Electrical Final | N/A | Canceled | |
| 08/10/2026 | COT - LCME - Mechanical Final | N/A | Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1225-02297
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK.
INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS.
NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2026 | COT - LCBU - Framing | Passed | 5-6-26: previously inspected & approved. | |
| 05/06/2026 | COT - LCPL - Rough Soil | Passed | 5-6-26: previously inspected & approved. | |
| 05/06/2026 | COT - LCPL - Plumbing Intermediate | Passed | 5-6-26: plumbing intermediates approved. | |
| 05/06/2026 | TRSP - ROW - Final/Close-Out | Passed | no impact to right of way landscape, sidewalk, or asphalt. No traffic control devices on site, approved. | |
| 06/11/2026 | COT - LCBU - Masonry Pregrout | Passed | 6-11-26: masonry pre grout at "facilities" cmu walls previous inspected all lifts/top out. | |
| 06/11/2026 | COT - LCBU - Preslab | Passed | 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement. | |
| 06/11/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement. | |
| 07/30/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 7-30-26: electrical above ceiling approved. | |
| 07/30/2026 | COT - LCME - Mechanical Above Ceiling | Passed | 7-30-26: mechanical above ceiling approved. | |
| 07/30/2026 | COT - LCEL - Electrical Intermediate | Passed | 7-30-26: electrical intermediates approved. | |
| 07/30/2026 | COT - LCME - Mechanical Intermediate | Passed | 7-30-26: mechanical intermediates approved. | |
| 08/12/2026 | COT - FCON - Fire - Final | Passed |