Permit: TC-COM-1225-02297

Parcel: 140290290


Addresses:

3301 E GLOBAL LP

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Preslab  

Date Description Inspector Results Comments
05/01/2026 COT - LCBU - Preslab   Partial Pass 5/1/26: ok to pour back at saw cuts for rough soil in-side of building
05/06/2026 COT - LCBU - Preslab   Partial Pass 5-6-26: excavation/reinforcement & pre slab at storage facilities verified per detail 108. Okay for concrete placement.
06/09/2026 COT - LCBU - Preslab   Partial Pass 6-9-26: preslqb/excavation/reinforcement at north side loading dock pour back a\verified per detail's 110 & 111. Okay for concrete placement.
06/11/2026 COT - LCBU - Preslab   Passed 6-11-26: excavation/reinforcement for footing at north side of building verified per detail 109. Okay for concrete placement.
06/11/2026 COT - LCBU - Preslab   Passed 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement.