Permit Number: TC-COM-1225-02297
Parcel: 140290290

Address:
3301 E GLOBAL LP

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1225-02297
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/05/2026 Commercial Electrical Standard APPROVED
01/21/2026 Commercial Mechanical Standard APPROVED
01/21/2026 Water - PDSD Standard APPROVED
01/02/2026 Outdoor Lighting Standard NOT REQUIRED No modifications to the outdoor lighting.
01/05/2026 Site Engineering Standard NOT REQUIRED
01/22/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/21/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
1. Please amend the plans to indicate the building is equipped with an emergency voice alarm system, otherwise please base the required exit width on 20% rather than 15% as indicated. If providing the emergency voice alarm, indicate so on plans. IBC 1005.3.2 Exception 1
2. Please amend the plans to show the 1393 SF Assembly space and designate if in or out of the scope of work.
3. Related to above comment, this assembly space is served by Exit H; however, with an occupant load over 49 people, this space will require 2 exits with panic hardware( IBC 1010.10.1 separated by 1/3rd the diagonal dimension of the area to be served. IBC 1006.2.1 & IBC 1007.1.1
4. IEBC 305.7 requires that accessibility be provided to the altered spaces. Where the existing path of travel elements, which entails a primary entrance, a primary path of travel, sanitary facilities serving the area, a drinking fountain, and signs. If these items are in full compliance with the current code, provide a statement indicating this on the cover sheet of the drawings. Otherwise, accessibility upgrades shall be required in accordance with IEBC.305.7. 1. If the cost of providing or upgrading the items above to be accessible is disproportionate to the cost of construction (exceeds 20% of the cost of construction not including accessibility upgrades), please provide information to verify construction costs.

(iii) Disproportionality.
(A) Alterations made to provide an accessible path of travel to the altered area
will be deemed disproportionate to the overall alteration when the cost
exceeds 20% of the cost of the alteration to the primary function area.
(B) Costs that may be counted as expenditures required to provide an accessible
path of travel may include:
(1) Costs associated with providing an accessible entrance and an accessible
route to the altered area, for example, the cost of widening doorways or
installing ramps;
(2) Costs associated with making restrooms accessible, such as installing
grab bars, enlarging toilet stalls, insulating pipes, or installing accessible
faucet controls;
(3) Costs associated with providing accessible telephones, such as relocating
the telephone to an accessible height, installing amplification devices, or
installing a text telephone (TTY); and
(4) Costs associated with relocating an inaccessible drinking fountain.

Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
01/21/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Provide a cleanout for the proposed 3” horizontal drain, sized per Section 708.1.7, IPC 2018.
01/15/2026 Fire New Construction Standard REQUIRES RESUBMIT 1. Sheet G100. Please review your egress. Assembly spaces/rooms with an OL greater than 49 require two exits. IFC 1006. Those doors also need to swing in the direction of egress travel if the OL is greater than 50. IFC 1010.1.2.1. The assembly (1393) is being used as a means of egress for the other portions of the building. This egress path may need to be modified depending on your two required exits from the from the assembly space.
john.vincent@tucsonaz.gov
5203495581
01/22/2026 Site Zoning Standard REQUIRES RESUBMIT FROM: Ramiro Olivarez
PDSD Zoning Review Section

PROJECT: TC-COM-1225-02297 – (1st Review)
3301 E GLOBAL LP – I-1
TRANSMITTAL DATE: January 22, 2026

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. Comment: For this permit application, clarify whether the scope of work is for interior work only or the exterior storage room only, as the permit description is unclear.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected Construction Documents.

If you have any questions about this transmittal, please contact Ramiro Olivarez at Ramiro.Olivarez@tucsonaz.gov
12/22/2025 PDSD Application Completeness Express REVIEW COMPLETED