Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 05/18/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Partial Pass |
|
| 05/21/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Re-inspection required |
5-21-26: room 905-add lid to j-box or remove, 904-open knockout at above ceiling j-box, missing j-box lid/label, remove any j-boxes not used. Stopped inspection-additional items may be noted. Note: Mc cabling cannot be attached to existing seismic wiring-add independent supports. |
| 05/26/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Re-inspection required |
5-26-26: electrical & mechanical above ceiling at room's 905 mechanical not completed, room 903 flex duct constricted-add supports at 4' intervals, room 902, room 910 add duct support, room 909 duct support and missing return air, room 908 junction boxes need covers/labeling, room 907 duct support and ripped duct, rm 906 zip tied electrical conduit to seismic light wire-add its own independent support and tape ripped air duct. Tape any tears to HVAC trunks. |
| 06/05/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Re-inspection required |
6-5-26: 802-open knockouts at above ceiling junction boxes, 801-open knockouts at junction boxes, 707-open knockouts at above ceiling junction boxes, missing junction box covers/labelling, 808-806-knockout at above ceiling junction boxes/missing junction box covers and exposed wiring,810- add cover plates to junction box at south wall, 804, 805, work space @ soffit area of hallway-missing cans/open knockouts at junction boxes. |
| 06/15/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Partial Pass |
6-15-26: electrical mechanical above ceiling at room's 812-seal tear on flex, missing junction box lids/labeling 813-seal tears on flex, missing junction box lids/labeling 815, missing junction box lids/labeling, seal tears at flex, 816, 707-open knockouts at junction boxes, install plastic bushings to protect low voltage at junction box, missing lids & labeling. |
| 06/24/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Partial Pass |
6-24-26: electrical/mechanical intermediates and above ceiling at room's 812, 813, 815, 816, 705-open knockouts on 3 above ceiling junction boxes, missing section of insulation on round duct, missing junction box labelling, 702-work up junction boxes |
| 07/10/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Canceled |
Canceled per contractor. 7/10/2026 |
| 07/30/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Passed |
7-30-26: electrical above ceiling approved. |