Permit: TC-COM-1225-02297

Parcel: 140290290


Addresses:

3301 E GLOBAL LP

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
05/06/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 5-6-26: excavation/reinforcement at storage facilities verified per detail 108. Okay for concrete placement.
05/26/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 5-26-26: CMU wall and footing at existing concrete slab located at west side of site verified per detail 108. Okay for concrete placement.
06/09/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 6-9-26: excavation/reinforcement at north side loading dock pour back a\verified per detail's 110 & 111. Okay for concrete placement.
06/11/2026 COT - LCBU - Excavation/Rebar/Zoning  Passed 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement.
06/11/2026 COT - LCBU - Excavation/Rebar/Zoning  Passed 6-11-26: excavation/reinforcement/preslab for footing at north side of building verified per detail 109. Okay for concrete placement.