Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2510 E DREXEL RD
Address NEW:
2510 E DREXEL RD
Apply Date:
10/18/2024
Applicant:
Lawrence McManus
Description:
New 950 SF Dutch Bros Coffee with Dual Drive through

Permit Reviews

Permit Number - TC-COM-1024-02001
Permit Status: Complete
Permit Description: New 950 SF Dutch Bros Coffee with Dual Drive through
Start Date Submittal Complete Date Status  
06/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2025 APPROVED Review Details
11/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/21/2025 APPROVED Review Details
02/27/2025 COMMERCIAL REVIEW - FULL v.4 03/27/2025 REQUIRES RESUBMIT Review Details
07/07/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/08/2025 REQUIRES RESUBMIT Review Details
05/21/2025 COMMERCIAL REVIEW - FULL v.5 05/21/2025 REQUIRES RESUBMIT Review Details
11/05/2024 COMMERCIAL REVIEW - FULL v.1 12/09/2024 REQUIRES RESUBMIT Review Details
06/09/2025 COMMERCIAL REVIEW - FULL v.7 06/09/2025 APPROVED Review Details
02/10/2025 COMMERCIAL REVIEW - FULL v.3 02/26/2025 REQUIRES RESUBMIT Review Details
06/09/2025 RESTAMP - COMMERCIAL v.1 06/10/2025 APPROVED Review Details
10/24/2024 COMMERCIAL REVIEW - LIMITED v.1 10/24/2024 REQUIRES RESUBMIT Review Details
12/14/2024 COMMERCIAL REVIEW - FULL v.2 01/07/2025 REQUIRES RESUBMIT Review Details
11/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/21/2025 APPROVED Review Details
07/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 07/14/2025 APPROVED Review Details
05/23/2025 COMMERCIAL REVIEW - FULL v.6 06/06/2025 REQUIRES RESUBMIT Review Details
11/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/14/2025 APPROVED Review Details
06/27/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/01/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1024-02001
Permit Status: Complete
Permit Description: New 950 SF Dutch Bros Coffee with Dual Drive through
Date Description Comments
05/22/2025 AIR BALANCING REPORT IS REQUIRED.
05/22/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
05/22/2025 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
11/05/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/10/2025 Masonry Inspection Report submittal review is required.
12/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/22/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/05/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/22/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
05/22/2025 WATER STERILIZATION REPORT IS REQUIRED.
05/22/2025 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1024-02001
Permite Description: New 950 SF Dutch Bros Coffee with Dual Drive through
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
06/25/2025 COT - HCPL - Sewer N/A Partial Pass 6/25/25: partial pass for plumbing underground at slab and connections to grease interceptor. Ok to backfill progress areas.
07/03/2025 COT - HCPL - Yard Water Line N/A Canceled
09/30/2025 COT - HCBU - Building Above Ceiling N/A Partial Pass 9-30-25: MEP's - pending electrical tie in at panels, disconnects at rooftop, lighting at canopy, ceiling mount receptacle, firefoam all penetrations at electrical room. Plumbing- flush control must be on accessible side, insulate hot water line above ceiling and at water heater with minimum of R3. Paint all exterior abs/pvc on rooftops and complete HVAC.
08/22/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass 8-22-25: verified trench depth on 3/4" Schedule 40 electrical conduit for 2 future light pole cages on east side of site. Okay to backfill approximately 70' north to south of open trench.
Note: not ready for light pole cage reinforcement inspection.
11/10/2025 COT - HCBU - Building Final N/A Partial Pass 11-10-25: partial pass-pending installation of water meter, ADA Sign for restroom containing braille, drain at canopy must be painted with specific paint-see plans for details together with pending conditions.
08/13/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass 8-13-25: partial pass- flex supports to be verified prior to final.
08/14/2025 COT - HCBU - Roof Nailing N/A Re-inspection required 8-14-25: missing A-35's per Detail S1-5 at the columns at canopy framing together with CS16 strapping every 48" o.c. at fascia beam to joist. Deck nailing at canopy approved- okay to dry in.
08/01/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Partial pass. Detail 12 on page SD1. Total of 3 footers for canopy. All per plan. Okay for concrete placement. 8/1/2025
08/05/2025 COT - HCBU - Framing N/A Re-inspection required Loose anchor bolts throughout. Add anchor bolts at marked areas. Add shot pins at marked areas. Loose interior wall 3rd wall in from south entry to the left. Trimmers need to be continuous from floor to header. Missing 4x in wall. Hardware per shear wall schedules not per plan. Add h25 at bearing points per truss calcs. Stopped inspection other items may be added. 8/5/2025
09/08/2025 COT - HCEL - Electrical Progress N/A Partial Pass 9-8-25: total of 9 light pole cages. Excavation on 3 not per plan depth. 2 located at midway point of west side and 1 located on the east northeast corner of site. Okay to pour on other 6 but a reinspect is required for those that failed.
08/21/2025 COT - HCEL - Electrical Underground N/A Partial Pass 8-21-25: verified trench depth for 1-3/4" 1-1" schedule 40 electrical conduits for light pole cage & monument on southeast-southwest areas of parking lot. Okay to backfill approximately 130' of trench.
07/08/2025 COT - HCBU - Preslab N/A Not Ready 7/8/25: This inspection was for the Dry well which should fall under engineering.
08/13/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 8-13-25: plumbing corrections made at interior side of building. Okay to continue with construction.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1024-02001
Permit Description: New 950 SF Dutch Bros Coffee with Dual Drive through
Total Completed Inspections - 33
Date Description Inspector Results Comments
07/18/2025 COT - HCPL - Sewer Passed
07/18/2025 COT - HCPL - Rough Soil Passed
07/18/2025 COT - HCPL - Yard Water Line Passed
10/21/2025 BULD - Electrical Clearance Passed 10-21-25: Okay to energize service. ECO clearance issued to TEP.
11/10/2025 COT - HCEL - Electrical Final Passed 11-10-25: electrical final approved.
11/10/2025 COT - HCME - Mechanical Final Passed 11-10-25: benches at canopy relocated to where drain drip is not hazardous, corrections made. Mechanical final approved.
11/10/2025 COT - HCPL - Plumbing Final Passed 11-10-25: benches at canopy relocated to where drain drip is not hazardous, corrections made. Plumbing final approved.
11/13/2025 ENGR Engineering Final Passed
11/12/2025 TRSP - ROW - Final/Close-Out Passed
11/13/2025 COT - FCON - Fire - Final Passed
11/14/2025 COT - HCBU - Building Progress Passed 11-14-25: approved.
11/14/2025 COT - HCBU - Building Above Ceiling Passed 11-14-25: approved.
11/14/2025 COT - HCEL - Electrical Intermediate Passed 11-14-25: approved.
11/14/2025 COT - HCPL - Plumbing Progress Passed 11-14-25: approved.
11/14/2025 COT - HCEL - Electrical Above Ceiling Passed 11-14-25: approved.
11/14/2025 COT - HCBU - Exterior Clips/Sheathing Passed 11-14-25: approved.
11/14/2025 COT - HCBU - Building Final Passed 11-14-25: Building final approved.
11/14/2025 COT - HCME - Mechanical Intermediate Passed 11-14-25: approved.
11/14/2025 COT - HCBU - Roof Nailing Passed 11-14-25: approved.
11/14/2025 COT - HCBU - Excavation/Rebar/Zoning Passed 11-14-25: previously inspected and approved.
11/14/2025 COT - HCBU - Framing Passed 11-14-25: approved.
11/14/2025 COT - HCEL - Electrical Progress Passed 11-14-25: approved.
11/14/2025 COT - HCEL - Electrical Underground Passed 11-14-25: approved.
11/14/2025 COT - HCEL - Outdoor Lighting Passed 11-14-25: outdoor lighting approved.
11/14/2025 COT - HCPL - Plumbing Roof Drains Passed 11-14-25: roof drains approved.
11/14/2025 COT - HCBU - Preslab Passed 11-14-25: approved.
11/14/2025 COT - HCME - Venting Passed 11-14-25: approved.
11/14/2025 COT - HCPL - Plumbing Intermediate Passed 11-14-25: approved.
11/14/2025 COT - HCME - Mechanical Above Ceiling Passed 11-14-25: approved.
11/14/2025 COT - HCME - Mechanical Progress Passed 11-14-25: approved
11/14/2025 COT - HCPL - Plumbing Above Ceiling Passed 11-14-25: approved.
11/14/2025 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed 11-14-25: approved.
11/14/2025 COT - HCBU - CofO Passed 11-14-25: okay for a level 4 TCO.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
AIR BALANCE REPORT FILES COMBINED_V1.PDF DOCUMENTS VIEW
TC-COM-1024-02001_DUTCH_BROS_COFFEE_AZ1006_63251060_-_SIGNED_V1.PDF DOCUMENTS VIEW
TRUSS CALCS - PLACEMENT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-AZ1006 TUCSON-R_V6.PDF DOCUMENTS VIEW
TC-COM-1024-02001 - DUTCH BROS COFFEE - SIGNED FINAL-2025-06-10_V1.PDF DOCUMENTS VIEW
63245031 DUTCH_BROS_AZ1006-GEO-RPT - SIGNED_V4.PDF DOCUMENTS VIEW