Permit: TC-COM-1024-02001
Permit Details
Apply Date:
10/18/2024
Applicant:
Lawrence McManus
Description:
New 950 SF Dutch Bros Coffee with Dual Drive through
Permit Reviews
Permit Number - TC-COM-1024-02001
Permit Status: Complete
Permit Description: New 950 SF Dutch Bros Coffee with Dual Drive through
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2025 | APPROVED |
| 11/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/21/2025 | APPROVED |
| 02/27/2025 | COMMERCIAL REVIEW - FULL v.4 | 03/27/2025 | REQUIRES RESUBMIT |
| 07/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/08/2025 | REQUIRES RESUBMIT |
| 05/21/2025 | COMMERCIAL REVIEW - FULL v.5 | 05/21/2025 | REQUIRES RESUBMIT |
| 11/05/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/09/2024 | REQUIRES RESUBMIT |
| 06/09/2025 | COMMERCIAL REVIEW - FULL v.7 | 06/09/2025 | APPROVED |
| 02/10/2025 | COMMERCIAL REVIEW - FULL v.3 | 02/26/2025 | REQUIRES RESUBMIT |
| 06/09/2025 | RESTAMP - COMMERCIAL v.1 | 06/10/2025 | APPROVED |
| 10/24/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 10/24/2024 | REQUIRES RESUBMIT |
| 12/14/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/07/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/21/2025 | APPROVED |
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 07/14/2025 | APPROVED |
| 05/23/2025 | COMMERCIAL REVIEW - FULL v.6 | 06/06/2025 | REQUIRES RESUBMIT |
| 11/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/14/2025 | APPROVED |
| 06/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1024-02001
Permit Status: Complete
Permit Description: New 950 SF Dutch Bros Coffee with Dual Drive through
| Date | Description | Comments |
|---|---|---|
| 05/22/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 05/22/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 05/22/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 11/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/10/2025 | Masonry Inspection Report submittal review is required. | |
| 12/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/22/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/05/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 05/22/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 05/22/2025 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 05/22/2025 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02001
Permite Description: New 950 SF Dutch Bros Coffee with Dual Drive through
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | COT - HCPL - Sewer | N/A | Partial Pass | 6/25/25: partial pass for plumbing underground at slab and connections to grease interceptor. Ok to backfill progress areas. |
| 07/03/2025 | COT - HCPL - Yard Water Line | N/A | Canceled | |
| 09/30/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 9-30-25: MEP's - pending electrical tie in at panels, disconnects at rooftop, lighting at canopy, ceiling mount receptacle, firefoam all penetrations at electrical room. Plumbing- flush control must be on accessible side, insulate hot water line above ceiling and at water heater with minimum of R3. Paint all exterior abs/pvc on rooftops and complete HVAC. |
| 08/22/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 8-22-25: verified trench depth on 3/4" Schedule 40 electrical conduit for 2 future light pole cages on east side of site. Okay to backfill approximately 70' north to south of open trench. Note: not ready for light pole cage reinforcement inspection. |
| 11/10/2025 | COT - HCBU - Building Final | N/A | Partial Pass | 11-10-25: partial pass-pending installation of water meter, ADA Sign for restroom containing braille, drain at canopy must be painted with specific paint-see plans for details together with pending conditions. |
| 08/13/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 8-13-25: partial pass- flex supports to be verified prior to final. |
| 08/14/2025 | COT - HCBU - Roof Nailing | N/A | Re-inspection required | 8-14-25: missing A-35's per Detail S1-5 at the columns at canopy framing together with CS16 strapping every 48" o.c. at fascia beam to joist. Deck nailing at canopy approved- okay to dry in. |
| 08/01/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial pass. Detail 12 on page SD1. Total of 3 footers for canopy. All per plan. Okay for concrete placement. 8/1/2025 |
| 08/05/2025 | COT - HCBU - Framing | N/A | Re-inspection required | Loose anchor bolts throughout. Add anchor bolts at marked areas. Add shot pins at marked areas. Loose interior wall 3rd wall in from south entry to the left. Trimmers need to be continuous from floor to header. Missing 4x in wall. Hardware per shear wall schedules not per plan. Add h25 at bearing points per truss calcs. Stopped inspection other items may be added. 8/5/2025 |
| 09/08/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 9-8-25: total of 9 light pole cages. Excavation on 3 not per plan depth. 2 located at midway point of west side and 1 located on the east northeast corner of site. Okay to pour on other 6 but a reinspect is required for those that failed. |
| 08/21/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 8-21-25: verified trench depth for 1-3/4" 1-1" schedule 40 electrical conduits for light pole cage & monument on southeast-southwest areas of parking lot. Okay to backfill approximately 130' of trench. |
| 07/08/2025 | COT - HCBU - Preslab | N/A | Not Ready | 7/8/25: This inspection was for the Dry well which should fall under engineering. |
| 08/13/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 8-13-25: plumbing corrections made at interior side of building. Okay to continue with construction. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02001
Permit Description: New 950 SF Dutch Bros Coffee with Dual Drive through
Total Completed Inspections - 33
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | COT - HCPL - Sewer | Passed | ||
| 07/18/2025 | COT - HCPL - Rough Soil | Passed | ||
| 07/18/2025 | COT - HCPL - Yard Water Line | Passed | ||
| 10/21/2025 | BULD - Electrical Clearance | Passed | 10-21-25: Okay to energize service. ECO clearance issued to TEP. | |
| 11/10/2025 | COT - HCEL - Electrical Final | Passed | 11-10-25: electrical final approved. | |
| 11/10/2025 | COT - HCME - Mechanical Final | Passed | 11-10-25: benches at canopy relocated to where drain drip is not hazardous, corrections made. Mechanical final approved. | |
| 11/10/2025 | COT - HCPL - Plumbing Final | Passed | 11-10-25: benches at canopy relocated to where drain drip is not hazardous, corrections made. Plumbing final approved. | |
| 11/13/2025 | ENGR Engineering Final | Passed | ||
| 11/12/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/13/2025 | COT - FCON - Fire - Final | Passed | ||
| 11/14/2025 | COT - HCBU - Building Progress | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCBU - Building Above Ceiling | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCEL - Electrical Intermediate | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCPL - Plumbing Progress | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCBU - Building Final | Passed | 11-14-25: Building final approved. | |
| 11/14/2025 | COT - HCME - Mechanical Intermediate | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCBU - Roof Nailing | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 11-14-25: previously inspected and approved. | |
| 11/14/2025 | COT - HCBU - Framing | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCEL - Electrical Progress | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCEL - Electrical Underground | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCEL - Outdoor Lighting | Passed | 11-14-25: outdoor lighting approved. | |
| 11/14/2025 | COT - HCPL - Plumbing Roof Drains | Passed | 11-14-25: roof drains approved. | |
| 11/14/2025 | COT - HCBU - Preslab | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCME - Venting | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCPL - Plumbing Intermediate | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCME - Mechanical Above Ceiling | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCME - Mechanical Progress | Passed | 11-14-25: approved | |
| 11/14/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | 11-14-25: approved. | |
| 11/14/2025 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - HCBU - CofO | Passed | 11-14-25: okay for a level 4 TCO. |