Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCME - Mechanical Final
Permit Number - TC-COM-1024-02001
Inspection Description - COT - HCME - Mechanical Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2025 | COT - HCME - Mechanical Final | Re-inspection required | 11-5-25: wrap hot lead of water heater with R3 insulation, complete installation of thermostatic valve in restroom lavatory, paint all exterior pvc on rooftop. Missing downspout for roof drains at canopy-see A3.1 Detail 11. | |
| 11/06/2025 | COT - HCME - Mechanical Final | Re-inspection required | 11-6-25: wrap hot lead of water heater with R3 insulation & paint all exterior plastic/pvc & ABS on rooftop and at canopy. See plans for details concerning which type of paint is required canopy. Also, provide an RFI/solution regarding the roof drain at canopy. Note: another failed inspection will result with a the-inspection fee. |
|
| 11/10/2025 | COT - HCME - Mechanical Final | Passed | 11-10-25: benches at canopy relocated to where drain drip is not hazardous, corrections made. Mechanical final approved. |