Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 07/10/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
7/10/25: reinforcement per approved plans at slab ok to proceed with concrete placement. |
| 07/30/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Canceled |
Canceled per contractor. 7/30/2025 |
| 07/31/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Canceled |
Canceled per contractor. 7/31/2025 |
| 08/01/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Partial pass. Detail 12 on page SD1. Total of 3 footers for canopy. All per plan. Okay for concrete placement. 8/1/2025 |
| 08/08/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
8-8-25: verified reinforcement & grout on 3 porch columns at 6' -okay to continue construction at progress area |
| 09/08/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
9-8-25: excavation & reinforcement verified per detail SP2.0/10. Okay to pour 9 light pole bases. |
| 09/08/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
9-8-25: total of 9 light pole cages. Excavation on 3 not per plan depth. 2 located at midway point of west side and 1 located on the east northeast corner of site. Okay to pour on other 6 but a reinspect is required for those that failed. |
| 09/15/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
9-15-25: reinforcement inspection at parking lot must be scheduled under the development package plan. |
| 11/14/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
11-14-25: previously inspected and approved. |