Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - TC-COM-1024-02001
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 7/10/25: reinforcement per approved plans at slab ok to proceed with concrete placement. | |
| 07/30/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Canceled per contractor. 7/30/2025 | |
| 07/31/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Canceled per contractor. 7/31/2025 | |
| 08/01/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial pass. Detail 12 on page SD1. Total of 3 footers for canopy. All per plan. Okay for concrete placement. 8/1/2025 | |
| 08/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 8-8-25: verified reinforcement & grout on 3 porch columns at 6' -okay to continue construction at progress area | |
| 09/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 9-8-25: excavation & reinforcement verified per detail SP2.0/10. Okay to pour 9 light pole bases. | |
| 09/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 9-8-25: total of 9 light pole cages. Excavation on 3 not per plan depth. 2 located at midway point of west side and 1 located on the east northeast corner of site. Okay to pour on other 6 but a reinspect is required for those that failed. | |
| 09/15/2025 | COT - HCBU - Excavation/Rebar/Zoning | Re-inspection required | 9-15-25: reinforcement inspection at parking lot must be scheduled under the development package plan. | |
| 11/14/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 11-14-25: previously inspected and approved. |