Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 14026038C


Addresses:

2510 E DREXEL RD


Inspection Status: Re-inspection required

Inspection History: COT - HCBU - Framing

Permit Number - TC-COM-1024-02001

Inspection Description - COT - HCBU - Framing

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
08/05/2025 COT - HCBU - Framing Re-inspection required Loose anchor bolts throughout. Add anchor bolts at marked areas. Add shot pins at marked areas. Loose interior wall 3rd wall in from south entry to the left. Trimmers need to be continuous from floor to header. Missing 4x in wall. Hardware per shear wall schedules not per plan. Add h25 at bearing points per truss calcs. Stopped inspection other items may be added. 8/5/2025
08/08/2025 COT - HCBU - Framing Re-inspection required 8-8-25: exterior nailing on sheathing not inspected, missing CS14 straps at each end-see details for locations,missing LSTA24 hanger, missing MSTA36 Hanger, missing CMST16 hanger. Missing cs straps on posts to beams locations. Inspection not ready-reschedule and have framers look at all details. Note: stopped inspection-additional items may be added.
08/12/2025 COT - HCBU - Framing Re-inspection required 8-12-25: missing CS16 Strap with blocking at the exterior wall north western side wall, add 5/8" anchor bolts with 3x3" washer plates at marked locations-see shear wall schedule for details;note: not all anchor bolts were marked and spacing varies from 16" o.c. To 24" o.c. And 48" o.c., check spacing on exterior sheathing and add nails according to shear wall schedule and add nailing where overpenetrated more than 1/8" and along edges/joints where closer than 3/8".
08/13/2025 COT - HCBU - Framing Partial Pass 8-13-25: corrections made-okay to continue with construction at progress areas.
Note: pending framing at canopy & awning areas.
08/15/2025 COT - HCBU - Framing Partial Pass 8-15-25: framing for canopy approved. Okay to continue with construction at progress areas.
11/14/2025 COT - HCBU - Framing Passed 11-14-25: approved.