Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | COT - HCBU - Preslab | Not Ready | 7/8/25: This inspection was for the Dry well which should fall under engineering. | |
| 07/10/2025 | COT - HCBU - Preslab | Partial Pass | 7/8/25: This inspection was for the Dry well which should fall under engineering. 7/10/25: reinforcement per approved plans at slab ok to proceed with concrete placement. |
|
| 11/14/2025 | COT - HCBU - Preslab | Passed | 11-14-25: approved. |