Inspection Status: Partial Pass
Inspection History: COT - HCBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/2025 |
COT - HCBU - Roof Nailing |
|
Partial Pass |
Partial pass. Main roof approved. Nails at Parapet walls have been over penetrated to the sheathing. Add more nails. 8/5/2025 |
| 08/14/2025 |
COT - HCBU - Roof Nailing |
|
Re-inspection required |
8-14-25: missing A-35's per Detail S1-5 at the columns at canopy framing together with CS16 strapping every 48" o.c. at fascia beam to joist. Deck nailing at canopy approved- okay to dry in. |
| 11/14/2025 |
COT - HCBU - Roof Nailing |
|
Passed |
11-14-25: approved. |