Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 09/30/2025 |
COT - HCBU - Building Above Ceiling |
|
Partial Pass |
9-30-25: MEP's - pending electrical tie in at panels, disconnects at rooftop, lighting at canopy, ceiling mount receptacle, firefoam all penetrations at electrical room. Plumbing- flush control must be on accessible side, insulate hot water line above ceiling and at water heater with minimum of R3. Paint all exterior abs/pvc on rooftops and complete HVAC. |
| 11/14/2025 |
COT - HCBU - Building Above Ceiling |
|
Passed |
11-14-25: approved. |