Permit: TC-COM-0525-01025
Permit Details
Status:
Revision Fees Due
Type:
Commercial Building
Address:
4220 E 22ND ST
Address NEW:
4220 E 22ND ST
Apply Date:
05/21/2025
Applicant:
Chris May
Description:
This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms. The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered. Exterior site improvements and building signage to be submitted under a separate permit. 75,895 sf is the entire existing + new building square footage, including the new express building. Site drawings are submitted under a separate permit: TD-DEV-0425-00111
Permit Reviews
Permit Number - TC-COM-0525-01025
Permit Status: Revision fees due
Permit Description: This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms.
The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered.
Exterior site improvements and building signage to be submitted under a separate permit.
75,895 sf is the entire existing + new building square footage, including the new express building.
Site drawings are submitted under a separate permit: TD-DEV-0425-00111
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2026 | RESTAMP - COMMERCIAL v.1 | 07/28/2026 | APPROVED |
| 03/18/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 03/20/2026 | APPROVED |
| 06/26/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 07/24/2026 | APPROVED |
| 08/06/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/15/2025 | APPROVED |
| 12/01/2025 | COMMERCIAL REVIEW - FULL v.3 | 12/29/2025 | APPROVED |
| 05/26/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/17/2026 | REQUIRES RESUBMIT |
| 05/21/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/14/2025 | REQUIRES RESUBMIT |
| 03/20/2026 | RESTAMP - COMMERCIAL v.1 | 03/27/2026 | APPROVED |
| 02/11/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/05/2026 | REQUIRES RESUBMIT |
| 08/01/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/01/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-01025
Permit Status: Revision fees due
Permit Description: This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms.
The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered.
Exterior site improvements and building signage to be submitted under a separate permit.
75,895 sf is the entire existing + new building square footage, including the new express building.
Site drawings are submitted under a separate permit: TD-DEV-0425-00111
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 06/15/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed sand/oil interceptor. |
| 07/02/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 07/02/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
| 12/03/2025 | An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. |
| 12/03/2025 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. |
| 12/05/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 12/05/2025 | Masonry Inspection Report submittal review is required. |
| 12/05/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0525-01025
Permit Status: Revision fees due
Permit Description: This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms.
The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered.
Exterior site improvements and building signage to be submitted under a separate permit.
75,895 sf is the entire existing + new building square footage, including the new express building.
Site drawings are submitted under a separate permit: TD-DEV-0425-00111
| Date | Description | Comments |
|---|---|---|
| 05/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/21/2025 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 05/21/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/05/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Revision Fees Due
Permit Number: TC-COM-0525-01025
Permite Description: This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms.
The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered.
Exterior site improvements and building signage to be submitted under a separate permit.
75,895 sf is the entire existing + new building square footage, including the new express building.
Site drawings are submitted under a separate permit: TD-DEV-0425-00111
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2026 | PDSD Building Division SIte Consultation | N/A | Partial Pass | |
| 05/19/2026 | COT - HCEL - Electrical Progress | N/A | Not Ready | |
| 05/19/2026 | COT - HCPL - Plumbing Progress | N/A | Not Ready | |
| 05/29/2026 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | Partial pass West wall to south wall and service bays |
| 06/26/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Existing employee restrooms approved |
| 07/07/2026 | COT - HCBU - TCO | N/A | Partial Pass | Okay for level 3 TCO at both men's and women's restrooms garage side. Okay to apply for TCO. 7/7/2026 |
| 08/05/2026 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 8/4/26: electrical underground at express service shop approved |
| 08/06/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 8.6.26 Service building North end, 3 OSB panels will need to be replaced(damaged). |
| 05/08/2026 | COT - HCBU - Preslab | N/A | Partial Pass | 5/8/2026 Partial pass for: North East side (jeep showroom) F3, double mat, f40, f80, f100, f40(2), f74, f60, f64-okay for concrete placement. Note: submit 3rd party report on f80 footing located at northwest corner. |
| 08/12/2026 | COT - HCBU - Framing | N/A | Partial Pass | 8.12.26 Doorway framing tech parts room. |
| 05/20/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Tech restrooms and breakroom. |
| 08/17/2026 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Soffit at Jeep showroom. |
| 06/09/2026 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 6-9-26: pookie approved at men's/woman's restroom areas. Okay to wrap and install return/supplies. |
| 08/17/2026 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | Soffit at Jeep showroom. |
| 07/27/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | 7-27-26: underground plumbing verified under test at the express building from restrooms -west up to break room approved. Okay to backfill progress areas using shading materials. |
| 08/14/2026 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 8.14.26 Partial pass; Bathrooms renovations, missing water line for WC in Men's room. |
| 06/09/2026 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | 6-9-26: add supports to DWV above ceiling at woman's restroom at 4' intervals. Wrap hot water lines. We will verify at upcoming inspections. |
Completed Inspections
Permit Status: Revision Fees Due
Permit Number: TC-COM-0525-01025
Permit Description: This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms.
The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered.
Exterior site improvements and building signage to be submitted under a separate permit.
75,895 sf is the entire existing + new building square footage, including the new express building.
Site drawings are submitted under a separate permit: TD-DEV-0425-00111
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2026 | COT - HCBU - Stem Wall/Retaining Wall | Passed |