Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/21/2026 |
ENGR Engineering Final
|
|
Not Ready |
Discussed TCO requirements. Will review plans to verify pedestrian circulation a new service bays. |
| 10/19/2026 |
ENGR Engineering Final
|
|
Partial Pass |
Okay to apply for a level 3 TCO for the service drive, and a level 1 TCO for the Express building |
| 10/23/2026 |
ENGR Engineering Final
|
|
Partial Pass |
Okay to apply for level 3 TCO for service drive and express building. |