Inspection History Details
Inspection Status: Canceled
Inspection History: COT - HCBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2026 | COT - HCBU - Masonry Pregrout | Canceled | ||
| 04/30/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | 4/30/26 First lift, express service building. |
|
| 05/07/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Express building south perimeter walls and interior walls 1st lift approved. Pending pillars for garage doors (north). Okay to grout all progress areas. 5/7/2026 | |
| 05/11/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass north wall, ok to proceed to next lift | |
| 05/13/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | West, South, and Center walls; 2nd. Lift. Express building south perimeter walls and interior wa |
|
| 05/18/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 05/20/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | 2nd lift | |
| 05/29/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass West wall to south wall and service bays | |
| 06/01/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | South wall 3rd lift, 4th lift center walls. Approved per third party report. 6/1/2026 | |
| 06/03/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 06/04/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass light fixtures north east corner | |
| 06/09/2026 | COT - HCBU - Masonry Pregrout | Re-inspection required | 6-9-26: grout had already poured at CMU walls without inspection. Submit 3rd party report as an attachment for city review & approval. | |
| 06/10/2026 | COT - HCBU - Masonry Pregrout | Re-inspection required | 6-10-26: 2nd pregrout pour without inspection, therefore, provide block outs at 4' intervals. Note: a same day inspection request with fee is required for a specific inspection time. Our hours are from 6-2:30pm & another missed inspection will result in a "Stop Work Order". |
|
| 06/17/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | West vehicle bay stem wall ok to proceed with first lift |