Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2026 |
BULD - Electrical Clearance |
|
Partial Pass |
9/25/26: verified new breaker install for a future use- Level 3 charger. Okay to energize panel # 154496467. Verbal INCR clearance issued to TEP at 1123 pm. |
| 09/28/2026 |
BULD - Electrical Clearance |
|
Partial Pass |
9/28/2026 Inspected main distribution panel along with transformer in electrical room. Lock out tag out is in place. Okay to energize MDP. INCR clearance approved. |