Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-0525-01025
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/05/2026 | Commercial Building Standard | APPROVED | Building (B) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 11/5/2026 |
||
| 11/05/2026 | Commercial Electrical Standard | APPROVED | Electrical (E) Reviewer Ron Ross; rross@safebuilt.com Discipline Status:Approved with Comments Date Completed: 10/29/2026 1. E400 Panelboard Schedules: Existing Panel LP2B MCB size is in error.Should be corrected in 'IFC' or ‘As Built’set. |
||
| 11/05/2026 | Commercial Mechanical Standard | APPROVED | Mechanical (M) Reviewer Jorge Valido; jvalido@safebuilt.com Discipline Status:Approved As Is Date Completed: 11/3/2026 |
||
| 11/05/2026 | Commercial Plumbing Standard | APPROVED | Plumbing (P) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 11/5/2026 |
||
| 11/12/2026 | Outdoor Lighting Standard | NOT REQUIRED | No revisions to the previously approved outdoor lighting. | ||
| N/A | Commercial Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | Site Engineering Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 10/27/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |