Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | COT - HCEL - Electrical Underground | Partial Pass | Partial pass light fixtures north east corner | |
| 07/29/2026 | COT - HCEL - Electrical Underground | Partial Pass | 7.29.26 Bay 1 and 2 from west end. |
|
| 08/05/2026 | COT - HCEL - Electrical Underground | Partial Pass | 8/4/26: electrical underground at express service shop approved | |
| 08/25/2026 | COT - HCEL - Electrical Underground | Partial Pass | 8/4/26: electrical underground at express service shop approved 8/25/26: There was 3-3” and 1-1”Schedule 40 conduits. 2 of the 3” were for primary for power, the other 3” was for data and the 1” was for fire. The conduits were the located south of the service area at the new buildings. south of the service area at the new building located on the east side. Okay to backfill approximately 35’ of trench. |
|
| 09/02/2026 | COT - HCEL - Electrical Underground | Partial Pass | Partial pass new building underground |