Permit Number: TC-COM-0525-01025
Parcel: 13014023A

Address:
4220 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL REVISION v.1

Permit Number - TC-COM-0525-01025
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/24/2026 Commercial Building Standard APPROVED Building (B) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/18/2026

Structural (S) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/18/2026
02/24/2026 Commercial Electrical Standard APPROVED Electrical (E) Reviewer
Ron Ross; rross@safebuilt.com
Discipline Status:Approved with Comments
Date Completed: 2/12/2026
E400:Electrical Mechanical Equipment Schedule could reduce conductor feed to DS-E3 indoor unit if factory installation
requirements allow. If allowed, this can be documented in AS BUILTS and no resubmittal is required.
02/24/2026 Commercial Plumbing Standard APPROVED Plumbing (P) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/18/2026
02/12/2026 Site Engineering Standard APPROVED
03/05/2026 Site Zoning Standard APPROVED
03/05/2026 Water - PDSD Standard APPROVED
02/19/2026 Outdoor Lighting Standard NOT REQUIRED No revisions to the previously approved outdoor lighting.
03/05/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/24/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Denied
Date Completed: 2/25/2026
1.General -Add new mini-split system to new or existing unit schedule. Provide all required information on schedule. -
2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on
construction documents.
2.General -Provide detail showing indoor unit installation and exterior condenser tie down specifications. - 2018 IECC
Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction
documents.
3.General -Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is
acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements.
RESUBMITTAL DIRECTIONS:
•All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the
sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta
identification number, with a brief explanation of the change(s).
•As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete
and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is
required for approval and permitting.
•Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to
each of the noted review comments items.
•This response narrative must clearly address how each issue was corrected or resolved and indicate where the
information may be found within the construction documents. The response narrative must be typewritten, on a
letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may
result in review delays or rejection of the resubmittal.
•Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.)
have been revised according to the above directions. Please resubmit the complete revised plan set with a separate
copy of response narrative PDF through the municipality to complete the review.
Review of revised construction documents in response to this letter may take upwards of 5 (five) business days, depending
on the size of the project and the volume of plans in queue at time of resubmittal
03/05/2026 Fire New Construction Standard REVIEW COMPLETED
02/11/2026 PDSD Application Completeness Express REVIEW COMPLETED