Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-0525-01025
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/24/2026 | Commercial Building Standard | APPROVED | Building (B) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 2/18/2026 Structural (S) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 2/18/2026 |
||
| 02/24/2026 | Commercial Electrical Standard | APPROVED | Electrical (E) Reviewer Ron Ross; rross@safebuilt.com Discipline Status:Approved with Comments Date Completed: 2/12/2026 E400:Electrical Mechanical Equipment Schedule could reduce conductor feed to DS-E3 indoor unit if factory installation requirements allow. If allowed, this can be documented in AS BUILTS and no resubmittal is required. |
||
| 02/24/2026 | Commercial Plumbing Standard | APPROVED | Plumbing (P) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 2/18/2026 |
||
| 02/12/2026 | Site Engineering Standard | APPROVED | |||
| 03/05/2026 | Site Zoning Standard | APPROVED | |||
| 03/05/2026 | Water - PDSD Standard | APPROVED | |||
| 02/19/2026 | Outdoor Lighting Standard | NOT REQUIRED | No revisions to the previously approved outdoor lighting. | ||
| 03/05/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/24/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical (M) Reviewer Jorge Valido; jvalido@safebuilt.com Discipline Status:Denied Date Completed: 2/25/2026 1.General -Add new mini-split system to new or existing unit schedule. Provide all required information on schedule. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. 2.General -Provide detail showing indoor unit installation and exterior condenser tie down specifications. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. 3.General -Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements. RESUBMITTAL DIRECTIONS: •All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta identification number, with a brief explanation of the change(s). •As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is required for approval and permitting. •Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to each of the noted review comments items. •This response narrative must clearly address how each issue was corrected or resolved and indicate where the information may be found within the construction documents. The response narrative must be typewritten, on a letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may result in review delays or rejection of the resubmittal. •Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.) have been revised according to the above directions. Please resubmit the complete revised plan set with a separate copy of response narrative PDF through the municipality to complete the review. Review of revised construction documents in response to this letter may take upwards of 5 (five) business days, depending on the size of the project and the volume of plans in queue at time of resubmittal |
||
| 03/05/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/11/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |