Permit Details

Status:
Complete
Type:
Development Package
Address:
4431 E 22ND ST
Address NEW:
4431 E 22ND ST
Apply Date:
12/08/2023
Applicant:
Bryan Justice
Description:
Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building

Permit Reviews

Permit Number - TD-DEV-1223-00480
Permit Status: Complete
Permit Description: Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building
Start Date Submittal Complete Date Status  
02/26/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 03/27/2025 APPROVED Review Details
04/29/2024 DEVELOPMENT PACKAGE NEW v.1 10/01/2024 APPROVED Review Details
02/27/2024 DEVELOPMENT PACKAGE NEW v.2 04/05/2024 APPROVED Review Details
12/11/2023 DEVELOPMENT PACKAGE NEW v.1 01/29/2024 REQUIRES RESUBMIT Review Details
08/05/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 09/09/2025 REQUIRES RESUBMIT Review Details
11/14/2025 DEVELOPMENT PACKAGE NEW REVISION v.3 11/18/2025 APPROVED Review Details
07/30/2025 RFI v.1 08/04/2025 APPROVED Review Details
10/29/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 11/13/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TD-DEV-1223-00480
Permit Status: Complete
Permit Description: Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building
Date Description Comments
11/18/2025 At final inspection make sure that there is a one to two foot set back from the face of the western 8' wall to the top of the basin. The set back should include 1 to 2 percent slope toward the basin. Please reach out to chad.keller@tucsonaz.gov if there area any questions with regard to this condition.
11/18/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-1223-00480
Permite Description: Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/08/2025 SITE - Stormwater Follow-up N/A Re-inspection required The current Construction Track Out exiting the site at S Belvedere Ave is not on the Swppp Plan. In any case if this Trackout is approved in this location it needs to be cleaned. The rocks are clogged with dirt and it is not functioning as designed. Angular 2-3”rock, not river rock needs to be added to maintain 6’ depth, 30’ width and 50’ Length dimensions. Rock needs to be placed over Non woven black Mirafi fabric. See Detail in the Swppp plan.
Waddle needs to be placed at the former entrance/exit at south end of site.
The Northwest corner of the site is unprotected. The site slopes downgrade to that corner and the N screen wall ends there. That area needs a berm or other BMP to prevent storm water from exiting the site.
The concrete washout area is full and starting to overflow. hardened concrete needs to be disposed of and washout needs to function as designed per plan.

I talked to the superintendent about the items listed and that they need corrective action. He informed me that they are currently repairing the Track out at the south end of the site.
09/18/2025 N/A Partial Pass 9/18/25
18" X 10" pony wall footer for dog park behind building. Two number five continuous bars with number five verts every 48 inches. Verts are placed correctly at the start and end of walls and at expansion joints, ties correct. Compaction good- Okay to pour. Grout all below grade cells and reinforced cells and vibrate grout.
11/14/2025 ENGR Paving N/A Partial Pass 11/14/25
South parking lot Bays and Diveline. Bays at 2.5" depth curbs correct and marked for asphalt thickness. Driveline not 100% with 3" Depth. Winrow needs clean up and a couple areas need to be shaved .5" Compaction reports for this areas not yet ready. Okay to Pave this area pending complying compaction tests of AB and driveline depth issues are fixed that I discussed with contractor. I will be out early Monday to confirm and to inspect North parking area.
06/26/2025 For trash and recycling enclosures N/A Partial Pass 6/26/25 Both refuse enclosure walls are about 5'. Reinforcing correct. Okay to pour grout.
Vibrate all reinforced cells. After grout is poured do not build walls past 6ft. I need to resolve issue about wall height discrepancy with my supervisor. This will be resolved soon.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1223-00480
Permit Description: Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building
Total Completed Inspections - 11
Date Description Inspector Results Comments
02/13/2025 PDSD Engineering Division Pre-Construction SITE Passed informed the contractor that he needs to call in every two weeks for the swap inspections. Also informed him about the compact compaction test that he needs to be taken per plan, track out rocks in place and so are the wattles
03/11/2025 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
11/07/2025 Passed
12/03/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Passed 12/3/25 Pre-grout wall inspection.

Half wall south of building that separates driveway from building. Reinforcing correct. Wall will be grouted solid. Vibrate all grout. Okay to grout this wall
12/04/2025 Passed
01/22/2026 ENGR Paving Passed 01/22/26
Contractor pressed in 2 small swales with heat sufficient to remedy puddling at SW section of parking lot. The holes from bracing of the PV canopy columns were patched.
02/04/2026 For trash and recycling enclosures Passed
02/04/2026 Final inspection to ensure all landscape and water harvesting SITE Passed 2/3/26
WHIA B will have a little berm / check dam put between it and WHIA A to make them discrete. WHIA B will also need a little more berm on the other side as well as discussed with contractor. This work will be checked at DP Final.
02/26/2026 SITE - Zoning Final Passed
02/26/2026 LAND Landscape Appearance & Function Final Passed
02/26/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV3_2_DDO DECISION APPROVAL LETTER - NEWPORT BELVEDERE TERRACE_V1.PDF DOCUMENTS VIEW
REVISION 3 - APPROVED - NEW PAGES ONLY - REV3_3_PLAN SET - 5404_NEWPORT_BELVEDERE_TERRACE_DP_REV3_ 2025_11_13_V3 - STAMPED 11.18.2025.PDF DOCUMENTS VIEW
APPROVED REV2_1_PLAN SET - NEWPORT_BELVEDERE_TERRACE_DP_REV2_ 2025_02_21 - COMPLETE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW