Permit: TD-DEV-1223-00480

Parcel: 126191910


Addresses:

4431 E 22ND ST

Inspection Status: Not Ready

Inspection History: For trash and recycling enclosures

Date Description Inspector Results Comments
01/20/2026 For trash and recycling enclosures Not Ready Doors need to close better. There is a padlock hasp that is keeping both from closing correctly and 1” pipe needs to be in place in 4 spots where cane bolt can slide down to hold doors in position.
02/04/2026 For trash and recycling enclosures Passed
06/09/2025 For trash and recycling enclosures Partial Pass Okay to pour wall footers.
06/23/2025 For trash and recycling enclosures Partial Pass 6/23/25 Both Refuse Enclosures are built 2.5 courses up with a #5 bond beam. Reinforcing is correct. Good to grout bond beam. Vibrate all grout.
06/26/2025 For trash and recycling enclosures Partial Pass 6/26/25 Both refuse enclosure walls are about 5'. Reinforcing correct. Okay to pour grout.
Vibrate all reinforced cells. After grout is poured do not build walls past 6ft. I need to resolve issue about wall height discrepancy with my supervisor. This will be resolved soon.
07/08/2025 For trash and recycling enclosures Partial Pass 7/7/25 Okay to grout bond beam at top of walls.

Call in rebar inspection for refuse enclosure floors when ready.
07/30/2025 For trash and recycling enclosures Partial Pass 7/30/25
Rebar for slabs is correct. #4 ew. 3" clear. Compaction good
Slope is correct, clearances are good. Okay to pour both floors/aprons