Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/13/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
informed the contractor that he needs to call in every two weeks for the swap inspections. Also informed him about the compact compaction test that he needs to be taken per plan, track out rocks in place and so are the wattles |