Inspection Status: Re-inspection required
Inspection History: SITE - Stormwater Follow-up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | SITE - Stormwater Follow-up | Re-inspection required | The current Construction Track Out exiting the site at S Belvedere Ave is not on the Swppp Plan. In any case if this Trackout is approved in this location it needs to be cleaned. The rocks are clogged with dirt and it is not functioning as designed. Angular 2-3”rock, not river rock needs to be added to maintain 6’ depth, 30’ width and 50’ Length dimensions. Rock needs to be placed over Non woven black Mirafi fabric. See Detail in the Swppp plan. Waddle needs to be placed at the former entrance/exit at south end of site. The Northwest corner of the site is unprotected. The site slopes downgrade to that corner and the N screen wall ends there. That area needs a berm or other BMP to prevent storm water from exiting the site. The concrete washout area is full and starting to overflow. hardened concrete needs to be disposed of and washout needs to function as designed per plan. I talked to the superintendent about the items listed and that they need corrective action. He informed me that they are currently repairing the Track out at the south end of the site. |