Address Search: 4431 E 22ND ST
Search
Parcel Attributes
| Parcel | 126191910 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | R-1, C-2 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | Toumey Park |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 4431 E 22ND ST
Date - 05/22/2026 7:34 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 4431 E 22ND ST
Date - 05/22/2026 7:34 p.m.
Total Number Of Permits - (28)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1223-02914 | Complete | 12/22/2023 | 09/01/2026 | Commercial Building | NEW THREE STORY, 72 UNIT LOW INCOME HOUSING TAX CREDIT APARTMENT BUILDING FOR SENIORS. | |
| TR-UTL-1224-02341 | Complete | 12/11/2024 | 03/18/2025 | Right-of-Way (ROW) - Utility | Utility (sewer) work to be performed in ROW. 01/15/2025 - Renewed for 60 days from 01/18/2025 to 03/18/2025. | |
| TD-DEV-1223-00480 | Complete | 12/08/2023 | 02/26/2029 | Development Package | Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building | |
| TZ-CMP-1224-00174 | Void | 12/02/2024 | N/A | Zoning Compliance | After hours permit or Permit: TC-COM-1223-02914 | |
| TF-FCP-1124-00973 | Complete | 11/18/2024 | 06/10/2025 | Fire Construction Permit | all I need is "Fire Service Underground" permit new 3 story wood framed senior living low income housing building. | |
| TF-FCP-1124-00923 | Complete | 11/04/2024 | 08/04/2025 | Fire Construction Permit | Install a new wet sprinkler system to meet nfpa 13 city codes and regulations. | |
| TS-PRM-1125-00453 | Issued | 11/03/2025 | 05/19/2026 | Sign - Permanent | WALL SIGN - INDIVIDUAL CUT OUT LETTERS | |
| TR-UTL-0925-01674 | Complete | 09/25/2025 | 01/28/2026 | Right-of-Way (ROW) - Utility | PRJ300547-1 COX TO OVERLASH 463' FOR SYSTEM TIE. | |
| TC-FBB-0924-00168 | Expired | 09/23/2024 | N/A | Factory Built Buildings | 200 amp temporary electric panel | |
| TC-RES-0924-05467 | Void | 09/20/2024 | N/A | Residential Building - One or Two Family | **VOID: YL - Unable to process, according to the location/parcel history there appears to be submittals for a purposed New multi-family development. Multi-family submittals must be submitted as commercial permit types. Permits already exist for this location TD-DEV-1223-00480 & TC-COM-1223-02914. In addition, according to your aerial photograph this is a vacant lot. An electrical clearance to a property without a permitted permanent structure is not permittable. If you're trying to hook up temporary power to a temporary construction trailer you will need to apply for a Temporary Structures permit. This permit will be voided. For questions: Building_Official@tucsonaz.gov ** -temporary power clearance 200 amp | |
| TR-ROW-0925-01109 | Inspections | 09/09/2025 | 12/17/2025 | Right-of-Way (ROW) | Please submit. Install 2 standard driveways (SD 206) and 35’ of standard sidewalk (SD 200) and ramps*** | |
| TS-PRM-0825-00360 | Issued | 08/27/2025 | 05/17/2026 | Sign - Permanent | Belvedere Terrace wall mounted entry sign | |
| TC-COM-0525-00986 | Complete | 05/13/2025 | 07/21/2026 | Commercial Building | Parking Canopy - P1 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | |
| TC-COM-0525-00987 | Complete | 05/13/2025 | 07/21/2026 | Commercial Building | Parking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | |
| TC-COM-0525-00988 | Complete | 05/13/2025 | 06/15/2026 | Commercial Building | Parking Canopy - P3 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | |
| TC-COM-0525-00989 | Complete | 05/13/2025 | 06/15/2026 | Commercial Building | Parking Canopy - P4 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | |
| TR-ROW-0425-00573 | Inspections | 04/29/2025 | 11/05/2025 | Right-of-Way (ROW) | Jobsite trailer needs to be relocated into utility ROW. Belvedere Terrace Street does not continue past the auto dealership (see attached). We would like to use this location within utility ROW until the end of 2025 when our project concludes. If this location is used, were thinking traffic control wouldn't be required. (07/31/2025)-Renew as of 90 days as of 08/07/2025, new expiration date is 11/05/2025 | |
| TC-COM-0425-00817 | Complete | 04/23/2025 | 06/15/2026 | Commercial Building | Roof Mounted PV System - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | |
| TF-FCP-0325-00243 | Inspections | 03/24/2025 | 10/30/2025 | Fire Construction Permit | Installation of a new fire alarm system into a 3 story senior housing building. | |
| TF-FCP-0326-00148 | Void | 03/06/2026 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0325-00243 - Need monitoring permit | |
| TC-CFO-0226-00041 | Complete | 02/26/2026 | 03/28/2026 | Certificate of Occupancy | NEW THREE STORY, 72 UNIT LOW INCOME HOUSING TAX CREDIT APARTMENT BUILDING FOR SENIORS. | |
| TR-UTL-0225-00300 | Withdrawn | 02/18/2025 | N/A | Right-of-Way (ROW) - Utility | Previous permit TR-UTL-1224-02341. Primary underground electric being installed in ROW. | |
| T06BU01757 | WITHDRWN | 07/12/2006 | N/A | GRADING | GRADING: CUT: 89 FILL: 9 | |
| T07BU00858 | WITHDRWN | 04/19/2007 | N/A | GRADING | GRADING: | |
| T08BU02171 | FINAL | 12/18/2008 | 06/20/2009 | TENTS | TENT | |
| T10EL02292 | WITHDRWN | 10/06/2010 | N/A | ELECT | NEW ELECTRIC SERVICE 100AMPS | |
| T10OT01718 | EXPIRED | 08/11/2010 | N/A | PEDDLER | Regulated Peddler | |
| T18OT00755 | EXPIRED | 07/13/2018 | 07/13/2019 | PEDDLER | REGULATED PEDDLER: THE DOG OUT, SITE PLAN APPROVED, PC LIC #3180561 EXP DATE 7/2019 |
Code Enforcement
Address: 4431 E 22ND ST
Date - 05/22/2026 7:34 p.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0524-02079 | Closed - Resolved | 05/30/2024 | 09/03/2024 | RVAC / Vacant lot with multiple RV's with occupant (living) inside RV's |
Plans
Address: 4431 E 22ND ST
Date - 05/22/2026 7:34 p.m.
Total Number Of Plans - (8)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TE-BAS-0324-00027 | Inactive | 03/10/2024 | 03/06/2026 | -- Commercial Water Harvesting Ordinance | Replaced by TW-CWH-0226-00012 | |
| TP-MOD-0925-000060 | Complete | 09/11/2025 | 03/10/2026 | -- Zoning Modifications | Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building | |
| TP-PRE-0923-00313 | Complete | 09/05/2023 | N/A | -- Pre-Application Conference | Pre-App for new 3-story multi-family residential building | |
| TP-PRE-1124-00255 | Submitted - Online | 11/05/2024 | N/A | -- Pre-Application Conference | Temporary Exemption to Noise Permit | |
| TW-CWH-0226-00012 | Active | 02/25/2026 | N/A | -- Commercial Water Harvesting Ordinance | Revision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building CRWH PLAN ADDED | |
| T18PRE0031 | CLOSED | 03/05/2018 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
| T18PRE0039 | CLOSED | 03/20/2018 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
| T19PRE0094 | CLOSED | 06/03/2019 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | SITE - CONTROLLED ENVIRONMENTAL FARMING |