Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2025 | Partial Pass | Contractor to pour sidewalk on the south end of the building 200 lineal feet | ||
| 10/29/2025 | Partial Pass | 10/29/25 Good to pour side walk South of building including curb ramps. |
||
| 11/04/2025 | Not Ready | Curb ramp forms next to Refuse enclosure at 8.3 too close to pour. Scupper not in yet-recall inspection for Thursday. | ||
| 11/07/2025 | Passed |