Permit: TC-COM-0525-01018
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
701 W CONGRESS ST
Address NEW:
701 W CONGRESS ST
Apply Date:
05/19/2025
Applicant:
Carina Eichorst
Description:
Rev.1: 5/27/2026 New single 4-story multi-family apartment building.
Permit Reviews
Permit Number - TC-COM-0525-01018
Permit Status: In revision
Permit Description: Rev.1: 5/27/2026
New single 4-story multi-family apartment building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2025 | COMMERCIAL REVIEW - FULL v.4 | 11/14/2025 | APPROVED |
| 09/02/2025 | COMMERCIAL REVIEW - FULL v.3 | 09/30/2025 | REQUIRES RESUBMIT |
| 05/27/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 08/06/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/29/2025 | REQUIRES RESUBMIT |
| 03/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/28/2026 | APPROVED |
| 05/20/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | RESTAMP - COMMERCIAL v.1 | 11/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-01018
Permit Status: In revision
Permit Description: Rev.1: 5/27/2026
New single 4-story multi-family apartment building.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 05/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 09/09/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 09/09/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/09/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/09/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 09/09/2025 | Post-Installed Anchor Inspection Report is required. |
| 09/09/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 09/09/2025 | SPECIAL INSPECTION FOR fabricated systems and elements IS REQUIRED |
| 09/09/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0525-01018
Permit Status: In revision
Permit Description: Rev.1: 5/27/2026
New single 4-story multi-family apartment building.
| Date | Description | Comments |
|---|---|---|
| 05/20/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 05/20/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/20/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 09/09/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 10/31/2025 | Must be approved by Deputy Director Elisa Hamblin prior to permit issuance |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-0525-01018
Permite Description: Rev.1: 5/27/2026
New single 4-story multi-family apartment building.
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 12/23/25: TMPP CLEARANCE FOR 701 W CONGRESS ST (Temp power for construction trailer) |
| 12/30/2025 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Footings for stem wall and vapor barrier are in place. OK to place concrete in progress areas. |
| 03/09/2026 | COT - HCBU - Roof Nailing | N/A | Re-inspection required | 3/9/26: nailing must follow sheathing schedule 6" at edge and 12" at field. All nails must be properly fastened and shall be located no less than 3/8" from edge and shall penetrate no more than 1/8". Please recall inspection once sheathing is complete and all fasteners are properly installed. |
| 03/25/2026 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 04/01/2026 | COT - HCPL - Sewer | N/A | Partial Pass | 4/1/26: Sewer line has been pressurized and approved. Ok to proceed with progress areas. Pending tie-ins |
| 04/15/2026 | COT - HCBU - Framing | N/A | Partial Pass | 4/15/26: EXTERIOR SHEATHING APPROVED AT east wing (north walls floors 1-4) |
| 05/12/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Re-inspection required | 5/12/26: insulation must be completely removed throughout 3rd floor corridors for inspection. Fire blocking required at corridors @ drop ceiling (IBC 718.2.3, 718.2.1.4, 718.2, 718.2.1) please recall inspection once insulation is removed and fire blocking is in place so we can walk 2nd and 3rd floor. All structural nail plates must have drywall screws removed and shall have 8-10d nails on each side (R602.6.1, P2603.2.1). Reinspection required |
| 04/15/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 4/15/26: EXTERIOR SHEATHING APPROVED AT east wing (north walls floors 1-4) |
| 06/08/2026 | COT - LCBU - Building Progress | N/A | Partial Pass | 6/8/2026 Partial pass. 2nd floor RC @ remaining units 211,208,207,206,204,205 |
| 04/21/2026 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 4/21/2026 partial pass. 1st and 2nd corridor 2nd layer drywall approved. Okay to proceed progress areas. |
| 05/21/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 5/21/2025 Partial pass. 101,102,103,104,105,106,107,108,109 110,111,112,113,114,117,118,119,120. Approved. All corrections were made. |
| 06/03/2026 | COT - HCEL - Electrical Above Ceiling | N/A | Re-inspection required | MEP above ceilings 4th floor soffit areas in rooms 419(provide blocking on 3sides to registers. Add strap for dryer duct in closet, missing fire caulking at sprinkler line, add saddle straps to flex lines),418(open hole at light in closet, block registers in three sides seal off exterior fire walls),417(seal off feeder penetration,flex in closet smashed,tape off any tears in flex,add strap to 6” duct living area) stopped inspection. 6/3/2026 |
| 05/21/2026 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 5/21/2025 Partial pass. 101,102,103,104,105,106,107,108,109 110,111,112,113,114,117,118,119,120. Approved. All corrections were made. |
| 12/16/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 12/16/25: Plumbing underground approved for GL A-C/1.5-3, (pending GL A-B/1-1.5) |
| 06/03/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Re-inspection required | MEP above ceilings 4th floor soffit areas in rooms 419(provide blocking on 3sides to registers. Add strap for dryer duct in closet, missing fire caulking at sprinkler line, add saddle straps to flex lines),418(open hole at light in closet, block registers in three sides seal off exterior fire walls),417(seal off feeder penetration,flex in closet smashed,tape off any tears in flex,add strap to 6” duct living area) stopped inspection. 6/3/2026 |
| 06/03/2026 | COT - HCPL - Plumbing Above Ceiling | N/A | Re-inspection required | MEP above ceilings 4th floor soffit areas in rooms 419(provide blocking on 3sides to registers. Add strap for dryer duct in closet, missing fire caulking at sprinkler line, add saddle straps to flex lines),418(open hole at light in closet, block registers in three sides seal off exterior fire walls),417(seal off feeder penetration,flex in closet smashed,tape off any tears in flex,add strap to 6” duct living area) stopped inspection. 6/3/2026 |
| 03/27/2026 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 3/26/26:Pre drywall at tubs and dead spaces floors 1-4 |
Completed Inspections
Permit Status: In Revision
Permit Number: TC-COM-0525-01018
Permit Description: Rev.1: 5/27/2026
New single 4-story multi-family apartment building.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2025 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | Passed | ||
| 03/11/2026 | COT - HCBU - Roof Nailing | Passed |