Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Interior Shear Bracing
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
3/12/26: partial pass for interior shear bracing at GL A-B/1-2 |
| 03/27/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
3/26/26:Pre drywall at tubs and dead spaces floors 1-4 |
| 04/01/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
4/1/26: fire tape at drywall tub and showers floors 4 and 3 |
| 04/09/2026 |
COT - HCBU - Interior Shear Bracing |
|
Re-inspection required |
4-9-26: interior shear inspection-add screws at corridors 6" o.c. along edges & 6" o.c. In the field. Add screws no closer than3/8" from edges/joints and not over penetrate more than 1/32". Schedule st your convenience. |
| 04/15/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
4/15/26: East wing 4th floor 2-layer at ceiling approved ok to proceed, mock up room 420 single layer at east approved. |
| 04/22/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
Shower wall 112 dead space, 110 dead space wall south wall. Provide draft stop at 10’. 4/22/2026 |
| 04/23/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
4/23/2026 partial pass. 4th floor room 420 drywall nailing approved. Note: remove all drywall screws from rc channel and provide structural screws. |