Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Address:
115 S LINDA AV
Address NEW:
115 S LINDA AV
Apply Date:
05/19/2025
Applicant:
Carina Eichorst
Description:
Rev.1: 5/27/2026 New 3-story multi-family residential building

Permit Reviews

Permit Number - TC-COM-0525-01016
Permit Status: Needs resubmittal
Permit Description: Rev.1: 5/27/2026 New 3-story multi-family residential building
Start Date Submittal Complete Date Status  
11/25/2025 COMMERCIAL REVIEW - FULL v.4 11/25/2025 APPROVED Review Details
08/06/2025 COMMERCIAL REVIEW - FULL v.2 09/02/2025 REQUIRES RESUBMIT Review Details
11/25/2025 RESTAMP - COMMERCIAL v.1 11/26/2025 APPROVED Review Details
09/02/2025 COMMERCIAL REVIEW - FULL v.3 09/19/2025 REQUIRES RESUBMIT Review Details
03/31/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.3 04/24/2026 APPROVED Review Details
03/24/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/27/2026 REQUIRES RESUBMIT Review Details
03/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/09/2026 REQUIRES RESUBMIT Review Details
05/20/2025 COMMERCIAL REVIEW - FULL v.1 06/27/2025 REQUIRES RESUBMIT Review Details
05/27/2026 COMMERCIAL REVIEW - FULL REVISION v.1 06/23/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0525-01016
Permit Status: Needs resubmittal
Permit Description: Rev.1: 5/27/2026 New 3-story multi-family residential building
Total Outstanding Activity Conditions - 8
Date Name
05/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/09/2025 AIR BALANCING REPORT IS REQUIRED.
09/09/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/09/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
09/09/2025 Post-Installed Anchor Inspection Report is required.
09/09/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/09/2025 SPECIAL INSPECTION FOR fabricated systems and elements IS REQUIRED
09/09/2025 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0525-01016
Permit Status: Needs resubmittal
Permit Description: Rev.1: 5/27/2026 New 3-story multi-family residential building
Date Description Comments
05/20/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
05/20/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/20/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
09/09/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/31/2025 Must be approved by Deputy Director Elisa Hamblin prior to permit issuance

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: TC-COM-0525-01016
Permite Description: Rev.1: 5/27/2026 New 3-story multi-family residential building
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
01/20/2026 COT - HCPL - Rough Soil N/A Partial Pass 1/16/26: plumbing underground approved from GL A-C/1-3 (ok to backfill progress area, shading required)
1/20/26: plumbing underground approved from GL A-B/3-4 ok to backfill progress area, shading required)
12/17/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass
02/08/2026 COT - HCBU - Preslab N/A Partial Pass 2/6/26: PRE-SLAB APPROVED FOR BUILDING SLAB. OKAY TO PROCEED WITH CONCRETE PLACEMENT
04/10/2026 COT - HCBU - Roof Nailing N/A Partial Pass 4-10-26: roof nailing inspection only approved-Okay to dry-in.
04/20/2026 COT - HCBU - Building Above Ceiling N/A Partial Pass Partial pass. 1st floor corridor SD screws and hangers. Pending 20’ south west end. Missing SD screws. 4/20/2026
05/13/2026 COT - HCBU - Interior Shear Bracing N/A Canceled Canceled per contractor. 5/13/2026
06/15/2026 COT - HCBU - Framing N/A Re-inspection required 6-15-26: framing, MEP's at room's 201- draft stop missing, missing nails at strap at entryway east wall, add 12 nails to each side of top plate splice, DWV at washer/dryer, seal penetrations at above ceiling decking along east wall , properly feed feeders through top plate at east wall and seal penetrations at top plate.decking, add plastic bushing at sub panel feeder, add nails to hold down at entryway /east wall, 202- missing deft stop, fire caulk penetrations at above ceiling decking, seal top plate penetrations at marked location, seal hvac line set penetration at above ceiling decking, missing strap at shear wall & nail strap to backing behind tub, add strap to DWV at laundry room, 203-missing draft stop, add strap to DWV at laundry, 12 nails at each side of top splices, secure pex lines within 12", ground pancake box, add plastic bushing at subpanel feeder. Stopped inspection-additional items may added.
06/05/2026 COT - HCBU - Exterior Clips/Sheathing N/A Re-inspection required 6/5/2026 2nd and 3rd floor west elevation not ready. Re walk marked areas. Exterior North east corner approved. Straps in place.
04/30/2026 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
06/18/2026 COT - HCEL - Electrical Intermediate N/A Partial Pass
06/18/2026 COT - HCME - Mechanical Intermediate N/A Not Ready 6.18.26
HVAC refrigerant lines running A2L Freon will need to be in a shaft.
06/03/2026 COT - HCPL - Plumbing Intermediate N/A Partial Pass 6/3/2026 partial pass. 2nd & 3rd floors pex under test. Okay to insulate hot water lines. Still need to verify straps, plates, and fire caulking at intermediate.

Completed Inspections

Permit Status: Needs Resubmittal
Permit Number: TC-COM-0525-01016
Permit Description: Rev.1: 5/27/2026 New 3-story multi-family residential building
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/03/2025 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed
02/13/2026 BULD - Electrical Clearance Passed Temporary construction power; ensure an address label is placed on the panel.
06/26/2026 COT - HCPL - Gas Pressure Test Passed

Documents

File Name Document Type  
TC-COM-0525-01016 DES PROF REVIEW 6-18-26.PDF DOCUMENTS VIEW
STAMPED ROOF - FLOOR_V3.PDF DOCUMENTS VIEW
3_LINDA AVENUE APTS CD SPEC 5-15-2025_V1.PDF DOCUMENTS VIEW
3_MECH CALCS_V1.PDF DOCUMENTS VIEW
3_STRUC CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V3.PDF DOCUMENTS VIEW
TC-COM-0525-01016 DES PROF REVIEW 9-9-25.PDF DOCUMENTS VIEW
TC-COM-0525-01016 CONST PLAN SET 9-2-25.PDF DOCUMENTS VIEW
TC-COM-0525-01016 DES PROF REVIEW 9-9-25.PDF DOCUMENTS VIEW
TC-COM-0525-01016 CONST PLAN SET 9-2-25.PDF DOCUMENTS VIEW