Permit: TC-COM-0525-01016

Parcel: 116206340


Addresses:

115 S LINDA AV

Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Above Ceiling

Date Description Inspector Results Comments
08/13/2026 COT - HCPL - Plumbing Above Ceiling Partial Pass
08/20/2026 COT - HCPL - Plumbing Above Ceiling Not Ready 8/20/2026 3rd floor drop ceilings inspection units 308,305(fire caulk low voltage lines and patch hole in bathroom. Seal sprinkler line in closet) 304( seal hole at Smurf tub) stopped inspections.
08/21/2026 COT - HCPL - Plumbing Above Ceiling Partial Pass 8/21/2026 Partial pass 3rd floor units. 308,305,304,301,310,314,320,323,326
08/28/2026 COT - HCPL - Plumbing Above Ceiling Re-inspection required 8-28-26: 2nd floor above ceiling MEP's at room's 201-add a support at bathroom exhaust, 202-provide exhaust supports at soffit areas at 4' intervals; within 2' of a 90 degree and at exhaust joints to prevent bowing. Also, add a strap above ceiling for bathroom exhaust. Reschedule inspections after corrections are made in all rooms
08/31/2026 COT - HCPL - Plumbing Above Ceiling Re-inspection required 8-31-26:mechanical above ceiling at room’s 201, 202, 203, 204-years to flex, 205-strap flex, 206-strap exhaust/strap to restroom fan exhaust, 207, 208-leak at restroom exhaust/support flex in restroom off grid, tear on flex in restroom, 209-supports at 4' intervals to exhausts, 210-tear on flex living room, support to exhaust at bedroom closet-at 90 degree elbow/tear on flex at restroom/connect restroom fan, support to 6" exhaust in other bedroom, 211- supports to exhaust at 4' intervals,. 212-supports to exhausts at 4' intervals. Stopped inspection-additional items may be noted.
09/03/2026 COT - HCPL - Plumbing Above Ceiling Partial Pass Dropped ceilings in Level Two units, and Level Three corridors.
09/10/2026 COT - HCPL - Plumbing Above Ceiling Partial Pass
09/15/2026 COT - HCPL - Plumbing Above Ceiling Partial Pass 2nd floor corridors. From unit 226. Pending center area near center stairwell. North corridor 2nd floor up to 2 units before north stairwell area Approved. Okay to proceed progress areas. 9/15/2026
09/16/2026 COT - HCPL - Plumbing Above Ceiling Partial Pass