Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0525-01016

Parcel: 116206340


Addresses:

115 S LINDA AV

Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Above Ceiling 

Date Description Inspector Results Comments
08/13/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass
08/20/2026 COT - HCEL - Electrical Above Ceiling  Not Ready 8/20/2026 3rd floor drop ceilings inspection units 308,305(fire caulk low voltage lines and patch hole in bathroom. Seal sprinkler line in closet) 304( seal hole at Smurf tub) stopped inspections.
08/21/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass 8/21/2026 Partial pass 3rd floor units. 308,305,304,301,310,314,320,323,326
08/28/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass 8-28-26: electrical above ceiling at room's 201 & 202 approved.
08/31/2026 COT - HCEL - Electrical Above Ceiling  Re-inspection required 8-31-26:mechanical, electrical, plumbing above ceiling at room’s 201, 202, 203, 204-years to flex, 205-strap flex, 206-strap exhaust/strap to restroom fan exhaust, 207, 208-leak at restroom exhaust/support flex in restroom off grid, tear on flex in restroom, 209-supports at 4' intervals to exhausts, 210-tear on flex living room, support to exhaust at bedroom closet-at 90 degree elbow/tear on flex at restroom/connect restroom fan, support to 6" exhaust in other bedroom, 211- supports to exhaust at 4' intervals,. 212-supports to exhausts at 4' intervals. Stopped inspection-additional items may be noted.
09/03/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass Dropped ceilings in Level Two units, and Level Three corridors.
09/10/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass
09/15/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass 2nd floor corridors. From unit 226. Pending center area near center stairwell. North corridor 2nd floor up to 2 units before north stairwell area Approved. Okay to proceed progress areas. 9/15/2026
09/16/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass
09/23/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass 9/23/2026 Partial pass. MEP approved at dropped ceilings. 1st floor. Units 111-126. (125) not ready. Okay to proceed progress areas.
09/25/2026 COT - HCEL - Electrical Above Ceiling  Re-inspection required Provide approved plans and assembly instructions if applicable.
09/28/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass 9/28/2026 Partial pass. 1st floor MEP at dropped ceilings units 109,107,106,103,104,105(closet space ceiling needs to be corrected),108(fire caulking required behind p trap).
10/07/2026 COT - HCEL - Electrical Above Ceiling  Not Ready
10/09/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass
10/12/2026 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/12/26: MEP's at 2nd floor corridor soffit above ceiling together with dropped ceiling framing at room 125 approved. Okay to continue with construction at progress areas.