Permit: TC-COM-0525-01016

Parcel: 116206340


Addresses:

115 S LINDA AV

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Exterior Clips/Sheathing 

Date Description Inspector Results Comments
05/29/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 5/29/26: Sheathing approved on east elevation floors 1-3. Pending straps on exterior sheathing. GL B-C/1-4
06/03/2026 COT - HCBU - Exterior Clips/Sheathing  Canceled 6/3/2026 canceled per contractor.
06/05/2026 COT - HCBU - Exterior Clips/Sheathing  Re-inspection required 6/5/2026 2nd and 3rd floor west elevation not ready. Re walk marked areas. Exterior North east corner approved. Straps in place.
06/08/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 6/8/2026 2nd & 3rd floor west elevation approved. Corrections were made. Okay to proceed progress areas.
06/18/2026 COT - HCBU - Exterior Clips/Sheathing  Canceled
06/22/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass
07/07/2026 COT - HCBU - Exterior Clips/Sheathing  Not Ready Dens shield inspection not ready. Screw pattern off and over penetrated screws throughout. 7/7/2026
07/10/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Dens shield east end exterior wall all floors approved. 7/10/2026
07/13/2026 COT - HCBU - Exterior Clips/Sheathing  Not Ready 7/13/2026 not ready. South Shear wall exterior nail and shear. Nailing penetrations more than an 1/8' throughout. Nailing pattern not per schedule.
07/21/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 7/21/26: partial pass for Dens Glass screw pattern for balcony ceilings, Exterior Sheathing at south end of building floors 1-3 approved.
07/27/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 7/27/26: Partial pass for exterior South end Densgalss floor 1-3. Ok to proceed.