Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Firewall/Fire Barrier/Firestop
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 4/29/2026 Partial pass. 1st layer at second floor corridors, West and North. Okay to proceed with second layer. | |
| 04/30/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Not Ready | ||
| 05/05/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/5/2026 partial pass. 1st floor - 1st layer of drywall needs to be replaced per water damage along with insulation. 2nd floor - 2nd layer of drywall 2nd and 3rd floor drywall screws at tubs and showers approved. Okay to proceed progress areas. |
|
| 05/19/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Not Ready | 5/19/26: not ready | |
| 05/29/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Not Ready | 5/28/26: not ready | |
| 06/08/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 6/8/2026 partial pass. 3rd floor MEP approved. Both west and north end units. Okay to proceed progress areas. | |
| 06/15/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Re-inspection required | 6-15-26: framing, MEP's at room's 201- draft stop missing, missing nails at strap at entryway east wall, add 12 nails to each side of top plate splice, DWV at washer/dryer, seal penetrations at above ceiling decking along east wall , properly feed feeders through top plate at east wall and seal penetrations at top plate.decking, add plastic bushing at sub panel feeder, add nails to hold down at entryway /east wall, 202- missing deft stop, fire caulk penetrations at above ceiling decking, seal top plate penetrations at marked location, seal hvac line set penetration at above ceiling decking, missing strap at shear wall & nail strap to backing behind tub, add strap to DWV at laundry room, 203-missing draft stop, add strap to DWV at laundry, 12 nails at each side of top splices, secure pex lines within 12", ground pancake box, add plastic bushing at subpanel feeder. Stopped inspection-additional items may added. | |
| 06/26/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass |