Permit Details

Status:
In Revision
Type:
Commercial Building
Apply Date:
01/30/2025
Applicant:
Aaron Jewell
Description:
2nd Party - New construction hotel

Permit Reviews

Permit Number - TC-COM-0125-00202
Permit Status: In revision
Permit Description: 2nd Party - New construction hotel
Start Date Submittal Complete Date Status  
06/30/2025 RESTAMP - COMMERCIAL v.1 07/01/2025 APPROVED Review Details
02/04/2025 COMMERCIAL REVIEW - FULL v.1 02/04/2025 REQUIRES RESUBMIT Review Details
03/19/2025 COMMERCIAL REVIEW - FULL v.4 04/15/2025 REQUIRES RESUBMIT Review Details
11/20/2025 COMMERCIAL REVIEW - FULL REVISION v.1 N/A IN REVIEW Review Details
02/07/2025 COMMERCIAL REVIEW - FULL v.3 03/07/2025 REQUIRES RESUBMIT Review Details
10/07/2025 COMMERCIAL REVIEW - FULL REVISION v.1 10/29/2025 APPROVED Review Details
02/06/2025 COMMERCIAL REVIEW - FULL v.2 02/06/2025 REQUIRES RESUBMIT Review Details
05/27/2025 COMMERCIAL REVIEW - FULL v.5 06/19/2025 REQUIRES RESUBMIT Review Details
06/25/2025 COMMERCIAL REVIEW - FULL v.6 06/30/2025 APPROVED Review Details
10/31/2025 COMMERCIAL REVIEW - FULL REVISION v.1 11/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0125-00202
Permit Status: In revision
Permit Description: 2nd Party - New construction hotel
Total Outstanding Activity Conditions - 7
Date Name
06/03/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
06/03/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/03/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/03/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/03/2025 Masonry Inspection Report submittal review is required.
06/03/2025 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
09/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-COM-0125-00202
Permit Status: In revision
Permit Description: 2nd Party - New construction hotel
Date Description Comments
02/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/03/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: In Revision
Permit Number: TC-COM-0125-00202
Permite Description: 2nd Party - New construction hotel
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
07/16/2025 COT - HCPL - Rough Soil N/A Partial Pass Six inch main waste line and laterals at Level #1. Ok to cover progress areas.
08/08/2025 COT - HCBU - Preslab N/A Partial Pass Partial pass. Pad per plan. Okay for concrete placement. 8/8/2025
08/27/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Elevator shaft at 32’ - 36’. OK to grout progress areas.
09/19/2025 COT - HCPL - Sewer N/A Partial Pass Information only for location and inspection requirements of man hole.
10/28/2025 COT - HCBU - Roof Nailing N/A Partial Pass 10-28-25: corrections made for roof deck nailing. Okay to continue construction at progress areas.
08/08/2025 COT - FCON - Fire - Final N/A Re-inspection required Riser/stub out approved to bury
COT - HCPL - Plumbing Above Ceiling N/A Scheduled
12/03/2025 COT - HCBU - Interior Shear Bracing N/A Re-inspection required 12-3-25: interior shear bracing at 4th floor room's 430, 429, 427, 428, 421, 422, 420, 419, 412, 411, 408,, 402, corridor, 403, 404. Add nails 6" o.c. 12" in the field, 3/8" from joints and cannot over-penetrate more than 1/8". Reschedule when ready
08/14/2025 COT - HCBU - Building Progress N/A Partial Pass 8-14-25: reinforcement on CMU elevator enclosure verified per plans. Okay to grout 1st lift at 4'.
07/30/2025 COT - HCEL - Electrical Progress N/A Partial Pass 7-30-25:verified trench depth on 5 electrical Schedule 40 conduits from room's 147-153, 3-3", 1-2", 1-1 1/2", 1-1" . Also, inspected 15 secondary Schedule 40 conduits, 13-1" & 2- 1 1/2" & grounding/bonding system from MDP to SES and back to area 147-153. Okay to backfill progress areas.

Scheduled Inspections

Scheduled Inspections - TC-COM-0125-00202
Status: In Revision
Description: 2nd Party - New construction hotel
Scheduled Date Description Entered By Entered Date
12/05/2025 COT - HCBU - Interior Shear Bracing Scheduled
12/05/2025 COT - HCPL - Plumbing Above Ceiling Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
251006_LIVAWAY SUITES TUCSON, AZ_ADD 2_V1.PDF DOCUMENTS VIEW
251006_LIVAWAY SUITES TUCSON,AZ_COMCHECK-MECHANICAL UPDATED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
250117_LIVAWAY SUITES TUCSON, AZ_STRUCTURAL CALCULATIONS_V3.PDF DOCUMENTS VIEW
63245093.LIVAWAY HOTEL TUCSON.GEO.RPT - SIGNED_V3.PDF DOCUMENTS VIEW
COMCHECK-LIVAWAY TUCSON, AZ_V3.PDF DOCUMENTS VIEW
LIVAWAY SUITES SPECIAL_INSPECTION-CERTIFICATE - SIGNED AJ 043025-2025-05-13_V1.PDF DOCUMENTS VIEW
LIVAWAY SUITES TUCSON, AZ - SPECS_V3.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE_ODL (1)_V1.PDF DOCUMENTS VIEW
_LIVAWAY SUITES TUCSON, AZ_CURRENT_V1.PDF DOCUMENTS VIEW