Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Apply Date:
01/30/2025
Applicant:
Aaron Jewell
Description:
2nd Party - New construction hotel

Permit Reviews

Permit Number - TC-COM-0125-00202
Permit Status: Needs resubmittal
Permit Description: 2nd Party - New construction hotel
Start Date Submittal Complete Date Status  
06/30/2025 RESTAMP - COMMERCIAL v.1 07/01/2025 APPROVED Review Details
02/04/2025 COMMERCIAL REVIEW - FULL v.1 02/04/2025 REQUIRES RESUBMIT Review Details
03/19/2025 COMMERCIAL REVIEW - FULL v.4 04/15/2025 REQUIRES RESUBMIT Review Details
12/29/2025 COMMERCIAL REVIEW - FULL REVISION v.2 01/15/2026 REQUIRES RESUBMIT Review Details
11/20/2025 COMMERCIAL REVIEW - FULL REVISION v.1 12/10/2025 REQUIRES RESUBMIT Review Details
02/07/2025 COMMERCIAL REVIEW - FULL v.3 03/07/2025 REQUIRES RESUBMIT Review Details
10/07/2025 COMMERCIAL REVIEW - FULL REVISION v.1 10/29/2025 APPROVED Review Details
02/06/2025 COMMERCIAL REVIEW - FULL v.2 02/06/2025 REQUIRES RESUBMIT Review Details
05/27/2025 COMMERCIAL REVIEW - FULL v.5 06/19/2025 REQUIRES RESUBMIT Review Details
06/25/2025 COMMERCIAL REVIEW - FULL v.6 06/30/2025 APPROVED Review Details
10/31/2025 COMMERCIAL REVIEW - FULL REVISION v.1 11/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0125-00202
Permit Status: Needs resubmittal
Permit Description: 2nd Party - New construction hotel
Total Outstanding Activity Conditions - 7
Date Name
06/03/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
06/03/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/03/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/03/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/03/2025 Masonry Inspection Report submittal review is required.
06/03/2025 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
09/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-COM-0125-00202
Permit Status: Needs resubmittal
Permit Description: 2nd Party - New construction hotel
Date Description Comments
02/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/03/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: TC-COM-0125-00202
Permite Description: 2nd Party - New construction hotel
Total Outstanding Inspections - 16
Last Inspection Date Description Inspector Results Comments
07/16/2025 COT - HCPL - Rough Soil N/A Partial Pass Six inch main waste line and laterals at Level #1. Ok to cover progress areas.
08/27/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Elevator shaft at 32’ - 36’. OK to grout progress areas.
09/19/2025 COT - HCPL - Sewer N/A Partial Pass Information only for location and inspection requirements of man hole.
10/28/2025 COT - HCBU - Roof Nailing N/A Partial Pass 10-28-25: corrections made for roof deck nailing. Okay to continue construction at progress areas.
08/08/2025 COT - FCON - Fire - Final N/A Re-inspection required Riser/stub out approved to bury
12/22/2025 COT - HCEL - Electrical Progress N/A Partial Pass 12-22-25: verified trench depth on 8-secondary 4" schedule 40 conduits together with 8-4" schedule 40 electrical primary conduits for building at north side of site. Okay to backfill trenching.
01/14/2026 COT - HCBU - Preslab N/A Re-inspection required 1-14-26: this inspection must be called in under your development package plan.
01/15/2026 COT - HCBU - Interior Shear Bracing N/A Partial Pass 1-15-26: corrections made to exterior sheathing except for room 433 and damaged section of south corridor at 1st floor. Okay to stucco wrap elsewhere.
12/10/2025 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 12/10/25: DWV pressure test approved ok to remove plugs. In wall DWV requires stud-shoe or sister stud where bored more than 60% at nonbearing wall. Nail plates required throughout on exterior walls at corridor and on vertical stacks where plumbing comes within 1-1/4" from face of stud
01/21/2026 COT - FCON - Sprinkler - Final N/A Re-inspection required OH pipes in units approved. Will need to hydrostatically test system when water is available.
12/22/2025 COT - HCEL - Electrical Above Ceiling N/A Re-inspection required 12-22-25: rough electrical in wall /above ceiling-fire foam horizontal penetrations at party wall, add bank plates where closer than 1 1/4" from edges, finish rough in electrical from unit's 321/322 to north-awg wires must be made up at time of inspection.
01/20/2026 COT - HCPL - Plumbing Progress N/A Partial Pass Plumbing above ceilings and in walls for room units on Level #4. Ok to insulate and cover walls.
12/22/2025 COT - HCBU - Exterior Clips/Sheathing N/A Re-inspection required 12-22-25: unit 428-fix damaged sheathing adjacent to window, loose panel north wall of unit 433, loose panels at west wall of 431, west wall of 427, replace/repair gap between sheathing above window of unit 425-gap is 3/4", 421-East exterior wall loose, 419-west wall loose, 413-west wall south of window loose, 401-loose panels west wall south of window.
08/14/2025 COT - HCBU - Building Progress N/A Partial Pass 8-14-25: reinforcement on CMU elevator enclosure verified per plans. Okay to grout 1st lift at 4'.
02/02/2026 COT - HCBU - Building Above Ceiling N/A Partial Pass 2/2/26: first layer of 5/8" type-x approved installation on RESILIENT CHANNEL SYSTEMS at 4th and 3rd floor ceilings approved. Ok to proceed with second layer of 5/8" type-x. Ensure all fasteners are spaced per approved plans and fasteners shall be no closer than 3/8" from edge of gypsum board and shall not penetrate more than 1/8",
12/23/2025 COT - HCME - Mechanical Above Ceiling N/A Re-inspection required 12/23/25: Exhaust ducts must be properly sealed and supported throughout on third floor, Boca plates required throughout at Exhaust duct, 4th floor was not walked (ceilings have been covered prior to inspection) please recall once access is available for above ceiling inspection.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
251006_LIVAWAY SUITES TUCSON, AZ_ADD 2_V1.PDF DOCUMENTS VIEW
251006_LIVAWAY SUITES TUCSON,AZ_COMCHECK-MECHANICAL UPDATED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
250117_LIVAWAY SUITES TUCSON, AZ_STRUCTURAL CALCULATIONS_V3.PDF DOCUMENTS VIEW
63245093.LIVAWAY HOTEL TUCSON.GEO.RPT - SIGNED_V3.PDF DOCUMENTS VIEW
COMCHECK-LIVAWAY TUCSON, AZ_V3.PDF DOCUMENTS VIEW
LIVAWAY SUITES SPECIAL_INSPECTION-CERTIFICATE - SIGNED AJ 043025-2025-05-13_V1.PDF DOCUMENTS VIEW
LIVAWAY SUITES TUCSON, AZ - SPECS_V3.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE_ODL (1)_V1.PDF DOCUMENTS VIEW
_LIVAWAY SUITES TUCSON, AZ_CURRENT_V1.PDF DOCUMENTS VIEW