Permit: TC-COM-0125-00202
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
1680 E TUCSON MARKETPLACE BL
Address NEW:
1680 E TUCSON MARKETPLACE BL
Apply Date:
01/30/2025
Applicant:
Aaron Jewell
Description:
2nd Party - New construction hotel
Permit Reviews
Permit Number - TC-COM-0125-00202
Permit Status: In revision
Permit Description: 2nd Party - New construction hotel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/30/2025 | RESTAMP - COMMERCIAL v.1 | 07/01/2025 | APPROVED |
| 02/04/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/04/2025 | REQUIRES RESUBMIT |
| 03/19/2025 | COMMERCIAL REVIEW - FULL v.4 | 04/15/2025 | REQUIRES RESUBMIT |
| 11/20/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 02/07/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/07/2025 | REQUIRES RESUBMIT |
| 10/07/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 10/29/2025 | APPROVED |
| 02/06/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/06/2025 | REQUIRES RESUBMIT |
| 05/27/2025 | COMMERCIAL REVIEW - FULL v.5 | 06/19/2025 | REQUIRES RESUBMIT |
| 06/25/2025 | COMMERCIAL REVIEW - FULL v.6 | 06/30/2025 | APPROVED |
| 10/31/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 11/13/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0125-00202
Permit Status: In revision
Permit Description: 2nd Party - New construction hotel
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/03/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 06/03/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/03/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 06/03/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 06/03/2025 | Masonry Inspection Report submittal review is required. |
| 06/03/2025 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
| 09/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-COM-0125-00202
Permit Status: In revision
Permit Description: 2nd Party - New construction hotel
| Date | Description | Comments |
|---|---|---|
| 02/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/06/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/03/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-0125-00202
Permite Description: 2nd Party - New construction hotel
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | Six inch main waste line and laterals at Level #1. Ok to cover progress areas. |
| 08/08/2025 | COT - HCBU - Preslab | N/A | Partial Pass | Partial pass. Pad per plan. Okay for concrete placement. 8/8/2025 |
| 08/27/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Elevator shaft at 32’ - 36’. OK to grout progress areas. |
| 09/19/2025 | COT - HCPL - Sewer | N/A | Partial Pass | Information only for location and inspection requirements of man hole. |
| 10/28/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 10-28-25: corrections made for roof deck nailing. Okay to continue construction at progress areas. |
| 08/08/2025 | COT - FCON - Fire - Final | N/A | Re-inspection required | Riser/stub out approved to bury |
| COT - HCPL - Plumbing Above Ceiling | N/A | Scheduled | ||
| 12/03/2025 | COT - HCBU - Interior Shear Bracing | N/A | Re-inspection required | 12-3-25: interior shear bracing at 4th floor room's 430, 429, 427, 428, 421, 422, 420, 419, 412, 411, 408,, 402, corridor, 403, 404. Add nails 6" o.c. 12" in the field, 3/8" from joints and cannot over-penetrate more than 1/8". Reschedule when ready |
| 08/14/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | 8-14-25: reinforcement on CMU elevator enclosure verified per plans. Okay to grout 1st lift at 4'. |
| 07/30/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 7-30-25:verified trench depth on 5 electrical Schedule 40 conduits from room's 147-153, 3-3", 1-2", 1-1 1/2", 1-1" . Also, inspected 15 secondary Schedule 40 conduits, 13-1" & 2- 1 1/2" & grounding/bonding system from MDP to SES and back to area 147-153. Okay to backfill progress areas. |
Scheduled Inspections
Scheduled Inspections - TC-COM-0125-00202
Status: In Revision
Description: 2nd Party - New construction hotel
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/05/2025 | COT - HCBU - Interior Shear Bracing | Scheduled | |
| 12/05/2025 | COT - HCPL - Plumbing Above Ceiling | Scheduled |