Inspection Status: Not Ready

Inspection History: COT - HCPL - Sewer 

Date Description Inspector Results Comments
05/19/2026 COT - HCPL - Sewer  Not Ready 5-19-26: not ready.
05/20/2026 COT - HCPL - Sewer  Passed 5-20-26: sewer manholes located on north & northwest corner of site verified under test for several minutes at 4psi. Mandrel test approved.
08/07/2025 COT - HCPL - Sewer  Partial Pass 8-7-25: verified trench depth /tracer wire on approximately 100' of 8" SDR35 PVC Sewer line. Okay to backfill progress areas
09/19/2025 COT - HCPL - Sewer  Partial Pass Information only for location and inspection requirements of man hole.
10/21/2025 COT - HCPL - Sewer  Partial Pass 10-21-25: main water line inspection-verified trench depth on a 8" line of approximately 180' located on north side of site & Another 30' of a 6" line to fire riser. Okay to backfill progress areas using shading materials.
10/23/2025 COT - HCPL - Sewer  Partial Pass 10-23-25: verified trench depth on 2-6" pipes for fire hydrants located at northeast corner and another at the west side at middle of site which runs approximately 60' west to east 60' and a 6" line approximately 50' in length that transitions to a 3" domestic that stubs up at the northeast corner of building. Okay to backfill progress areas with shading materials. Air test to be performed after installation of second manhole.