Inspection Status: Not Ready
Inspection History: COT - HCPL - Sewer
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2026 |
COT - HCPL - Sewer |
|
Not Ready |
5-19-26: not ready. |
| 05/20/2026 |
COT - HCPL - Sewer |
|
Passed |
5-20-26: sewer manholes located on north & northwest corner of site verified under test for several minutes at 4psi. Mandrel test approved. |
| 08/07/2025 |
COT - HCPL - Sewer |
|
Partial Pass |
8-7-25: verified trench depth /tracer wire on approximately 100' of 8" SDR35 PVC Sewer line. Okay to backfill progress areas |
| 09/19/2025 |
COT - HCPL - Sewer |
|
Partial Pass |
Information only for location and inspection requirements of man hole. |
| 10/21/2025 |
COT - HCPL - Sewer |
|
Partial Pass |
10-21-25: main water line inspection-verified trench depth on a 8" line of approximately 180' located on north side of site & Another 30' of a 6" line to fire riser. Okay to backfill progress areas using shading materials. |
| 10/23/2025 |
COT - HCPL - Sewer |
|
Partial Pass |
10-23-25: verified trench depth on 2-6" pipes for fire hydrants located at northeast corner and another at the west side at middle of site which runs approximately 60' west to east 60' and a 6" line approximately 50' in length that transitions to a 3" domestic that stubs up at the northeast corner of building. Okay to backfill progress areas with shading materials. Air test to be performed after installation of second manhole. |