Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Exterior Clips/Sheathing
Permit Number - TC-COM-0125-00202
Inspection Description - COT - HCBU - Exterior Clips/Sheathing
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 1-9-26: add more nails to marked location at the north wall near entrance of room 433, add nails to marked location to Top & bottom panel south of window in room 419, add nails to marked location behind metal electrical conduits( east wall) in room east of elevator on 3rd floor. Submit a letter to the city from framing company documenting the nailing at covered areas with stucco paper along the 1st floor and areas of the 2nd floor were nailed per the approved plans and meets the 2018 IBC. Okay to continue installing stucco paper at progress areas minus the mentioned above rooms and do not cover these walls until the rooms are re-inspected and approved. | |
| 01/27/2026 | COT - HCBU - Exterior Clips/Sheathing | Re-inspection required | 1-27-26: Ist layer Type X drywall screw inspection at 4th floor ceiling. 401- drywall screws shall be installed no further than 1/2" from the ends of panel-this applies to rooms 401-408 & screws must be installed no closer than 3/8" from joints/abutting drywall. Room 402-screws are required 3/8" from joints/abutting drywall joints, add screws at marked location at entryway. 403-3/8" from edges/splices, 405-same notes, 406- missing screws at above ceiling along edges of party-wall-check spacing. 407-3/8" from edges, add screws where screws over penetrated drywall more than 1/32". 408-add screws along edges of restroom, 3/8" required at edges/joints. Stopped inspection-make corrections and reschedule inspection. | |
| 12/16/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 12-16-25: add nails to marked areas at exterior sheathing, correct damaged sheathing at the northwest and at south end. 1st floor was inspected-provide a letter from a framing company documenting that sheathing at covered areas along 1st floor was installed per plans and meets the 2018IBC. | |
| 12/22/2025 | COT - HCBU - Exterior Clips/Sheathing | Re-inspection required | 12-22-25: unit 428-fix damaged sheathing adjacent to window, loose panel north wall of unit 433, loose panels at west wall of 431, west wall of 427, replace/repair gap between sheathing above window of unit 425-gap is 3/4", 421-East exterior wall loose, 419-west wall loose, 413-west wall south of window loose, 401-loose panels west wall south of window. |